Engineering:Höegh Esperanza: Difference between revisions

From HandWiki
(change)
 
(add)
 
Line 7: Line 7:
|Ship name= Höegh Esperanza
|Ship name= Höegh Esperanza
|Ship namesake=
|Ship namesake=
|Ship owner=Leif Höegh & Co, [[Place:Oslo|Oslo]], Norway
|Ship owner=[[Company:Leif Höegh & Co|Leif Höegh & Co]], [[Place:Oslo|Oslo]], Norway
|Ship operator=
|Ship operator=
|Ship registry=
|Ship registry=
Line 64: Line 64:
}}
}}
|}
|}
The '''''Höegh Esperanza''''' is a [[Engineering:Floating production storage and offloading|Floating Storage and Regasification Unit]] (FSRU) ship owned by Höegh LNG Holdings.<ref>{{Cite web |title=Höegh LNG - Fleet |url=https://hoeghlng.com/fleet/default.aspx#section=fsru |access-date=2022-11-13 |website=hoeghlng.com}}</ref> From the end of 2022 the FSRU will be used in the Wilhelmshaven LNG terminal.
The '''''Höegh Esperanza''''' is a [[Engineering:Floating production storage and offloading|Floating Storage and Regasification Unit]] (FSRU) ship owned by [[Company:Leif Höegh & Co|Höegh]] LNG Holdings.<ref>{{Cite web |title=Höegh LNG - Fleet |url=https://hoeghlng.com/fleet/default.aspx#section=fsru |access-date=2022-11-13 |website=hoeghlng.com}}</ref> Since the end of 2022 it is in use at the Wilhelmshaven LNG terminal.


== History ==
== History ==
The [[Engineering:Floating production storage and offloading|FSRU]] ship was ordered on June 1, 2015, from [[Company:Hyundai Heavy Industries|Hyundai Heavy Industries]] in {{wipe|South Korea}}, the [[Engineering:Keel laying|keel was laid]] on December 28, 2015 and was [[Engineering:Ceremonial ship launching|launched]] on March 17, 2017. The ship was delivered to its owner on April 5, 2018. In June 2018, it was chartered for three years by CNOOC Gas & Power Trading and Marketing and was used starting in November 2018 at the Port of Tianjin.<ref>{{Cite web |title=Höegh LNG : Höegh Esperanza commissioning for FSRU operations in Tianjin, China |url=https://www.hoeghlng.com/investors/news/press-release-details/2018/Hegh-LNG--Hegh-Esperanza-commissioning-for-FSRU-operations-in-Tianjin-China/default.aspx |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref>
The ship was ordered on 1 June 2015 from [[Company:Hyundai Heavy Industries|Hyundai Heavy Industries]] in [[Earth:South Korea|South Korea]]. On 28 December 2015 the [[Engineering:Keel laying|keel was laid]], and on 17 March 2017 the ship was [[Engineering:Ceremonial ship launching|launched]]. It was delivered to its owner on 5 April 2018. In June 2018, it was chartered for three years by CNOOC Gas & Power Trading and Marketing and was used starting in November 2018 at the Port of Tianjin.<ref>{{Cite web |title=Höegh LNG : Höegh Esperanza commissioning for FSRU operations in Tianjin, China |url=https://www.hoeghlng.com/investors/news/press-release-details/2018/Hegh-LNG--Hegh-Esperanza-commissioning-for-FSRU-operations-in-Tianjin-China/default.aspx |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref>


In 2019, plans were made for the ship to be used for ten years by the Australian energy company AGL Energy in the planned LNG terminal Crib Point (Mornington-Halbinsel south of [[Place:Melbourne|Melbourne]]).<ref>{{Cite web |title=Höegh LNG: AGL selects Höegh Esperanza as FSRU for Crip Point LNG project |url=https://www.hoeghlng.com/investors/news/press-release-details/2019/Hegh-LNG-AGL-selects-Hegh-Esperanza-as-FSRU-for-Crib-Point-LNG-project/default.aspx |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref> However, the terminal project was not approved by regulatory authorities in March 2021 for environmental reasons.<ref>{{Cite web |title=Gas Proposal Ruled Out Due To Environmental Impacts {{!}} Premier of Victoria |url=http://www.premier.vic.gov.au/gas-proposal-ruled-out-due-environmental-impacts |access-date=2022-11-13 |website=www.premier.vic.gov.au |language=en}}</ref>
In 2019, plans were made for the ship to be used for ten years by the Australian energy company AGL Energy in the planned Crib Point [[Chemistry:Liquefied natural gas|liquefied natural gas]] (LNG) terminal at the Mornington Peninsula south of [[Place:Melbourne|Melbourne]].<ref>{{Cite web |title=Höegh LNG: AGL selects Höegh Esperanza as FSRU for Crip Point LNG project |url=https://www.hoeghlng.com/investors/news/press-release-details/2019/Hegh-LNG-AGL-selects-Hegh-Esperanza-as-FSRU-for-Crib-Point-LNG-project/default.aspx |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref> However, the terminal project was not approved by regulatory authorities in March 2021 for environmental reasons.<ref>{{Cite web |title=Gas Proposal Ruled Out Due To Environmental Impacts {{!}} Premier of Victoria |url=http://www.premier.vic.gov.au/gas-proposal-ruled-out-due-environmental-impacts |access-date=2022-11-13 |website=www.premier.vic.gov.au |language=en}}</ref>


=== Use in Wilhelmshaven ===
=== Use in Wilhelmshaven ===
On May 5, 2022, Höegh LNG Holdings announced that it has signed binding implementation contracts with the German Federal Ministry for Economic Affairs and Climate Action for the chartering of two FSRUs from the Hoegh fleet for operation in Germany for ten years. The detailed FSRU contracts were expected to be finalized by September/October 2022{{update after|2022|11|13}}<!-- were the contracts finalized?  when? --> and by November 2022, FSRU operations were expected to start at the end of the year at the Wilhelmshaven LNG terminal by use of the Höegh Esperanza.<ref>{{Cite web |title=HÖEGH LNG: Two FSRU contracts in Germany |url=https://www.hoeghlng.com/investors/news/press-release-details/2022/HEGH-LNG-Two-FSRU-contracts-in-Germany/ |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref> The continuous capacity of the Hoegh Esperanza assured to the German government is {{convert|5|e9m3/a|e12ft3/a|abbr=off}} of LNG, with a maximum capacity of {{convert|7.5|e9m3/a|e12ft3/a|abbr=off}}.<ref>Bundestags-Drucksache 20/2992, S. 6/7: [https://dserver.bundestag.de/btd/20/029/2002992.pdf Response by State Secretary Dr. Patrick Graichen dated July 29, 2022, to a question by Member of Parliament Mark Helfrich (CDU/CSU)] (PDF; 1,2&nbsp;MB) (german)</ref>
On 5 May 2022, Höegh LNG Holdings announced that it signed binding implementation contracts with the German Federal Ministry for Economic Affairs and Climate Action for the chartering of two FSRUs from the Höegh fleet for operation in Germany for ten years. The detailed FSRU contracts {{update after|2022|10|31|text=were expected to be finalized by September/October 2022}} and by November 2022, FSRU operations {{update after|2022|10|31|text=were expected to start at the end of the year}} at the Wilhelmshaven LNG terminal by use of the Höegh Esperanza.<ref>{{Cite web |title=HÖEGH LNG: Two FSRU contracts in Germany |url=https://www.hoeghlng.com/investors/news/press-release-details/2022/HEGH-LNG-Two-FSRU-contracts-in-Germany/ |access-date=2022-11-13 |website=www.hoeghlng.com |language=en-US}}</ref><ref>{{Cite web |title=Germany's first LNG terminal in Wilhelmshaven looks back on one year of operation |url=https://www.uniper.energy/news/germanys-first-lng-terminal-in-wilhelmshaven-looks-back-on-one-year-of-operation |access-date=2025-02-27 |website=uniper.energy |language=en}}</ref> The continuous capacity of the Höegh Esperanza assured to the German government is {{convert|5|e9m3/a|e12ft3/a|abbr=off}} of LNG, with a maximum capacity of {{convert|7.5|e9m3/a|e12ft3/a|abbr=off}}.<ref>{{cite book |title=Schriftliche Fragen mit den in der Woche vom 1. August 2022 eingegangenen Antworten der Bundesregierung |trans-title=Written questions and replies received from the Federal Government during the week of 1 August 2022 |number=20/2992 |date=2022-08-05 |pages=6–7 |url=https://dserver.bundestag.de/btd/20/029/2002992.pdf |chapter=Antwort des Staatssekretärs Dr. Patrick Graichen vom 29. Juli 2022 |trans-chapter=Response by State Secretary Dr. Patrick Graichen dated 29 July 2022 |publisher=Deutscher Bundestag |language=de |access-date=2024-04-13 }}</ref>


== Description ==
== Description ==
The vessel is measured at 110,499 GT with a length of 290 m and a breadth of 46 m and has a deadweight tonnage of 92,217 tdw. For propulsion, the Höegh Esperanza was equipped with a dual-fuel [[Engineering:Diesel–electric transmission|diesel-electric]] system consisting of four dual-fuel [[Company:Wärtsilä|Wärtsilä]]-Italia W8L50DF engines, each with eight cylinders and 500 mm bore and 580 mm stroke, and a rated power of 7800 kW. As emergency diesel engine a [[Company:Cummins|Cummins]] KTA 38D is used as backup.{{cn|date=November 2022}}
The vessel has a [[Engineering:Gross tonnage|gross tonnage]] of 110,499 at a length of {{convert|290|m}} and a breadth of {{convert|46|m}}. Its [[Engineering:Deadweight tonnage|deadweight tonnage]] is 92,217. For propulsion, the Höegh Esperanza is equipped with a dual-fuel [[Engineering:Diesel–electric transmission|diesel-electric]] system comprising four dual-fuel [[Company:Wärtsilä|Wärtsilä]]-Italia W8L50DF engines, each with eight cylinders measuring {{convert|500|mm}} bore and {{convert|580|mm}} stroke, and a rated power of {{convert|7800|kW|PS|lk=out}}. A [[Company:Cummins|Cummins]] KTA 38D emergency diesel engine is used as backup.{{cn|date=November 2022}}


The vessel was designed for combined open and closed regasification operation and the GTT Mark III membrane tanks have a storage capacity of 170,000 of liquefied natural gas. Two auxiliary boilers and four exhaust boilers were installed for good heat utilization. The ship has been classified by the ship classification society [[Company:DNV|DNV]].{{cn|date=November 2022}}
The vessel was designed for combined open and closed regasification operation and the GTT Mark III membrane tanks have a storage capacity of {{convert|170,000|m3|e6ft3|abbr=off}} of liquefied natural gas. Two auxiliary boilers and four exhaust boilers are installed for heat utilization. The ship has been classified by the ship classification society [[Company:DNV|DNV]].{{cn|date=November 2022}}


== References ==
== References ==

Latest revision as of 11:56, 1 August 2025

Short description: Floating Storage and Regasification Unit
History
Norway
Name: Höegh Esperanza
Owner: Leif Höegh & Co, Oslo, Norway
Builder: Hyundai Heavy Industries
Yard number: 2865
Laid down: 2015
Launched: 2017
In service: 2018
Homeport: Oslo
Identification: IMO number9780354
Status: In service
General characteristics
Type: LNG carrier
Tonnage: 92,217 DWT
Length: 294 m (964 ft 7 in)
Beam: 46 m (150 ft 11 in)
Height: 26 m (85 ft 4 in)
Draft: 12.6 m (41 ft 4 in)
Propulsion: Dual fuel diesel electric
Speed: 18 knots (33 km/h; 21 mph)
Capacity: 170,032 m3 (6,004,600 cu ft)
Notes: To be used for ten years as a floating LNG storage and regasification unit as an LNG imported terminal in Wilhelmshaven.

The Höegh Esperanza is a Floating Storage and Regasification Unit (FSRU) ship owned by Höegh LNG Holdings.[1] Since the end of 2022 it is in use at the Wilhelmshaven LNG terminal.

History

The ship was ordered on 1 June 2015 from Hyundai Heavy Industries in South Korea. On 28 December 2015 the keel was laid, and on 17 March 2017 the ship was launched. It was delivered to its owner on 5 April 2018. In June 2018, it was chartered for three years by CNOOC Gas & Power Trading and Marketing and was used starting in November 2018 at the Port of Tianjin.[2]

In 2019, plans were made for the ship to be used for ten years by the Australian energy company AGL Energy in the planned Crib Point liquefied natural gas (LNG) terminal at the Mornington Peninsula south of Melbourne.[3] However, the terminal project was not approved by regulatory authorities in March 2021 for environmental reasons.[4]

Use in Wilhelmshaven

On 5 May 2022, Höegh LNG Holdings announced that it signed binding implementation contracts with the German Federal Ministry for Economic Affairs and Climate Action for the chartering of two FSRUs from the Höegh fleet for operation in Germany for ten years. The detailed FSRU contracts were expected to be finalized by September/October 2022[needs update] and by November 2022, FSRU operations were expected to start at the end of the year[needs update] at the Wilhelmshaven LNG terminal by use of the Höegh Esperanza.[5][6] The continuous capacity of the Höegh Esperanza assured to the German government is 5 billion cubic metres per annum (0.18 trillion cubic feet per annum) of LNG, with a maximum capacity of 7.5 billion cubic metres per annum (0.26 trillion cubic feet per annum).[7]

Description

The vessel has a gross tonnage of 110,499 at a length of 290 metres (950 ft) and a breadth of 46 metres (151 ft). Its deadweight tonnage is 92,217. For propulsion, the Höegh Esperanza is equipped with a dual-fuel diesel-electric system comprising four dual-fuel Wärtsilä-Italia W8L50DF engines, each with eight cylinders measuring 500 millimetres (20 in) bore and 580 millimetres (23 in) stroke, and a rated power of 7,800 kilowatts (10,600 PS). A Cummins KTA 38D emergency diesel engine is used as backup.[citation needed]

The vessel was designed for combined open and closed regasification operation and the GTT Mark III membrane tanks have a storage capacity of 170,000 cubic metres (6.0 million cubic feet) of liquefied natural gas. Two auxiliary boilers and four exhaust boilers are installed for heat utilization. The ship has been classified by the ship classification society DNV.[citation needed]