Physics:Mumbai Maglev
The Mumbai Maglev is 2007 proposal for a Maglev line serving Mumbai . A total of six routes are proposed in the Mumbai Metropolitan Region, with distances ranging from 20 to 50 km.[1]
In February 2020 the Mumbai Rail Vikas Corporation (MRVC) wrote to the Maharashtra state government and the Indian Railway Board seeking an in-principal approval for the project as a public private partnership. The plan is for a 55 km (34 mi) elevated line connecting Chhatrapati Shivaji Terminus (CSTM) and Panvel with a branch line to Navi Mumbai International Airport. The request was made after Swiss company SwissRapide AG, in a joint venture with Lasane Infra Private Limited (India), sent an expression of interest to develop and run the corridor at an estimated cost of Rs 13,347 crore.[2]
As of July 2021 there is no indication the proposal has proceeded further.
References
- ↑ Maglev plan starts chugging, at last
- ↑ "CSTM-Panvel elevated corridor: MRVC wants to run Maglev trains with help of pvt bidder". Indian Express. 6 February 2020. https://indianexpress.com/article/cities/mumbai/cstm-panvel-elevated-corridor-mrvc-wants-to-run-maglev-trains-with-help-of-pvt-bidder-6253227/.