Engineering:ESSA-1
ESSA 1 | |
Mission type | Weather satellite |
---|---|
Operator | ESSA/NASA |
COSPAR ID | 1966-008A |
SATCAT no. | 1982 |
Spacecraft properties | |
Manufacturer | RCA Astro |
Launch mass | 304 kilograms (670 lb)[1] |
Start of mission | |
Launch date | February 3, 1966, 07:41:23[2] | UTC
Rocket | Delta C |
Launch site | Cape Canaveral Air Force Station LC-17A |
End of mission | |
Disposal | Decommissioned |
Deactivated | June 12, 1968[3] |
Orbital parameters | |
Reference system | Geocentric |
Regime | Low Earth |
Semi-major axis | 7,115.60 kilometers (4,421.43 mi) |
Eccentricity | 0.0083082 |
Perigee altitude | 685 kilometers (426 mi) |
Apogee altitude | 803 kilometers (499 mi) |
Inclination | 97.94 degrees |
Period | 99.56 minutes |
Epoch | December 7, 2013, 20:11:52 UTC[4] |
TOS |
ESSA-1 (or OT-3) was a spin-stabilized operational meteorological satellite. Its name was derived from that of its oversight agency, the Environmental Science Services Administration (ESSA).
Launch
ESSA-1 was launched on February 3, 1966, at 07:41 UTC. It was launched atop a Delta rocket from Cape Canaveral, Florida. The spacecraft had a mass of 304 kilograms (670 lb) at the time of launch. ESSA-1 had an inclination of 97.91°, and an orbited the Earth once every 100 minutes. Its perigee was 702 kilometers (379 nmi) and its apogee was 845 kilometers (456 nmi).
ESSA-1 had a similar design to that of the TIROS satellite series. It was an 18-sided right prism, measuring 107 centimeters (42 in) across opposite corners and 56 centimeters (22 in). It had a reinforced baseplate, which carried most of the subsystems and a cover assembly (hat). ESSA-1 had approximately 10,000 1-cm by 2-cm solar cells, which charged 21 nickel–cadmium batteries. ESSA-1 was designed to take pictures of daytime cloud cover, record them, and transmit them when it was in range of a ground acquisition station.
The satellite spin rate and attitude were determined primarily by a magnetic attitude spin coil (MASC). The MASC was a current-carrying coil mounted in the cover assembly. The magnetic field induced by the coil interacted with that of the Earth's magnetic field, and provided the necessary torque to maintain a desired spin rate of 9.225 revolutions per minute (rpm). Five small solid-fuel thrusters mounted on the baseplate provided a secondary means of controlling the spin rate.
ESSA-1 operated normally until October 6, 1966, when the camera system failed. The spacecraft was fully deactivated on May 8, 1967, after being left on for an additional period of time for engineering purposes.
References
- ↑ "ESSA 1". National Space Science Data Center. https://nssdc.gsfc.nasa.gov/nmc/spacecraft/display.action?id=1966-008A.
- ↑ McDowell, Jonathan. "Launch Log". Jonathan's Space Page. http://planet4589.org/space/log/launchlog.txt.
- ↑ "ESSA". NASA Science. http://science1.nasa.gov/missions/essa/.
- ↑ "ESSA 1 (OT-3) Satellite details 1966-008A NORAD 1982". N2YO. December 7, 2013. http://www.n2yo.com/satellite/?s=1982.
This article incorporates public domain material from the National Aeronautics and Space Administration document "ESSA 1".
External links
- "NASA - NSSDC - Spacecraft - Details - ESSA 1". NSSDC. May 14, 2012. https://nssdc.gsfc.nasa.gov/nmc/spacecraft/display.action?id=1966-008A.
- "Tiros OT-3 spacecraft handling plan". NASA. October 1, 1965. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067685_1975067685.pdf.
- "Operational procedures for telemetry data processing for the TIROS 9 and OT-3 meteorological satellite system". NASA. December 17, 1965. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067731_1975067731.pdf.
- "Instruction and operating handbook Tiros 9 and OT-3 meteorological satellite system". NASA. December 27, 1965. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067649_1975067649.pdf.
- "Early orbit and attitude determination plan and prelaunch analysis for the satellite TIROS OT-3". NASA. January 1, 1966. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067853_1975067853.pdf.
- "Tiros OT-3 spacecraft handling plan". NASA. January 7, 1966. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067663_1975067663.pdf.
- "Alignment and calibration data for the TIROS OT-3 meteorological satellite". NASA. January 17, 1966. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19750067705_1975067705.pdf.
- "ESSA 1 (TIROS OT-3) Meteorological Satallite System, Vol. I". NASA. April 20, 1966. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19740078321_1974078321.pdf.
- L. J. Allison (May 1, 1972). "The development of hurricane Inez, 1966, as shown by satellite nighttime radiometric and daytime television coverage". NASA. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19730010889_1973010889.pdf.
Original source: https://en.wikipedia.org/wiki/ESSA-1.
Read more |