Engineering:Intermodal railfreight in Great Britain

From HandWiki
Short description: The movement of intermodal containers by rail within Great Britain
88009 at Scout Green with a Daventry to Mossend intermodal train

Intermodal railfreight in Great Britain is a way of transporting containers between ports, inland ports and terminals in England, Scotland and Wales, by using rail to do so. Initially started by British Rail in the 1960s, the use of containers that could be swapped between different modes of transport goes back to the days of the London, Midland & Scottish Railway.

The transport of containers from ship to rail is classified by the UK government as Lo-Lo traffic (lift-on, lift-off).[1] Volumes of intermodal traffic in the United Kingdom have been rising since 1998, with an expectation of further growth in the years ahead; by 2017, railfreight was moving one in four of containers that entered the United Kingdom.[note 1] However, the movement of containers through the Channel Tunnel has been labelled as disappointing, but this has suffered myriad problems such as migrant issues and safety problems. Since privatisation of the railways in the 1990s, the market has grown from one initial operator (Freightliner), to four main operators, DB Cargo, Direct Rail Services and GB Railfreight, although other entrants have tried to run intermodal trains.

Many of the older terminals opened by British Rail have closed down, with the focus on strategic rail freight interchanges (SRFIs), which will focus on a wider area or region with good onward road, or water, transport links.

History

Bristol Freightliner Terminal, which ceased to be used by intermodal trains in 2019

As a transfer container service, Freightliner was set up by British Rail as a separate company, with the first train running in November 1965.[2] It was one of the reformative ideas put forward under the aegis of Richard Beeching as part of the rationalisation of the railway network in the 1960s.[3] The idea of trains moving containers pre-dated the Beeching cuts, with some suggestions being put forward in the 1950s when the railway was under the control of the British Transport Commission. In the 1950s, British Rail ran a Condor service (an Anglo-Scottish container train that ran on two axle-wagons).[4][5] The first service of Condor containers ran in March 1959, consisting of roller-bearing flat wagons that containers could be moved on and off with ease.[6]

Even further back, the swapping of containers between modes of transport was utilised in the 19th century, when wooden containers were used, but after the railways were grouped in 1921, the London Midland & Scottish Railway (LMS) introduced this type of system with steel and aluminium containers.[7]

Initially, the new Freightliner service was intended for the domestic movement of freight in containers between points in the Great Britain, with 16 terminals in operation in 1968, and Southampton and Tilbury under construction.[8] However, in 1968 a London to Paris working was started which relied upon the Dover to Dunquerke train ferry, and by 1969, the service was linked into ports with a short-sea and a deep-sea service to other countries.[9][10] By the end of the 1960s, liner trains (united transport) were carrying 12,900,000 tonnes (14,200,000 tons) per year. By the end of 1978, this average was 39,300,000 tonnes (43,300,000 tons).[11] In 1969, British Rail transferred ownership of Freightliner to the National Freight Corporation, but with BR supplying the wagons and locomotives. It was returned to BR in 1978.[12][13]

By 1981, Freightliner was operating to 43 terminals, 25 of their own and 18 privately used locations.[14] In 1982, the Port of Felixstowe was despatching three daily freight trains with containers on. In 1983, a second terminal opened (Felixstowe North), and between the two terminals, the amount of containers transhipped to and from rail was about 80,000 per year (20%).[15] When a third terminal was opened in 2013 (named Felixstowe North, with the previous one being renamed Felixstowe Central), over 40 million TEUs (twenty-foot equivalent units) with 36 daily departures carrying containers were being handled.[16] In 1986 and 1987, several terminals were closed, including four in Scotland (Aberdeen, Clydeport [Greenock], Dundee and Edinburgh) despite the potential for long-distance services from these terminals. British Rail deemed it more efficient to load containers at Coatbridge in Glasgow, and use electric traction south on the West Coast Main Line.[17] Before the closures, Freightliner operated 35 terminals, including ports, compared with 19 under privatisation.[18]

66090 winding through Tees Yard with a containerised chemicals train bound for Grangemouth

In 1988, Freightliner, Speedlink and Railfreight International, were amalgamated into one entity by British Rail, called Railfreight Distribution.[19] A large section of the business that these three separate arms dealt with, were loss-making and the combined efforts were a way in which it was hoped to turn the businesses around.[20] In 1992, it was assessed that Freightliner was making a 50% loss on its £70 million turnover, and the business was only serving nine locations. One of the problems causing this was that the deep-sea nature of the traffic carried was increasingly geared up to using the 9-foot-6-inch (2.90 m) containers, which required gauge enhancement or specially adapted wagons to be carried on the British railway system.[21]

The advent of the Channel Tunnel opening, led to a resurgence in container traffic terminals being opened. These were separated into sites away from the main railfreight business as operated between UK terminals and deep-sea ports such as Southampton and Felixstowe. New European freight terminals were built at Trafford Park in Manchester, Wakefield in West Yorkshire and Willesden in North West London. After this, the intermodal services in Britain could be subdivided into three streams; traffic to and from ports, Channel Tunnel traffic and domestic flows, of which much Anglo-Scottish traffic falls into the latter.[22] This is a complete modal shift of the domestic nature of the Freightliner network as instigated in the mid 1960s which initially envisaged the market being domestic traffic dominating. One suggestion for the change in traffic origin has been that containers entering ports have a lower transport cost, as they only need onward road transport to their final destination, as opposed to the domestic traffic which needs to be road-hauled, railed and then road-hauled again.[23]

The opening of Daventry International Rail Freight Terminal (DIRFT) in July 1997, heralded another new venture into the intermodal business. The site is located on the Northampton Loop of the West Coast Main Line, and close to the M1 motorway and the A45 road. The land had been designated as a "motorway orientated growth point" in 1978, and so was ideally situated for this type of interchange and delivery point for intermodal traffic.[24] In 1997, services through the Channel Tunnel operated between Birmingham Landor Street, Daventry, Mossend, Seaforth, Trafford Park, Wakefield and Willesden in the United Kingdom, with terminals in Europe (Avignon, Barcelona, Lyon, Melzo, Metz, Muizen, Novara, Oleggio, Paris, Perpignan, Rogoredo and Turin).[25] Even so, the volumes of intermodal traffic (and other commodities) shifted by railfreight through the channel Tunnel have been low compared with forecasted freight volumes.[note 2] Whilst some problems range from the physical; migrants using the services to cross and at one point, invading the railway yard at Frethun, other problems have been strikes by French workers and fires in the tunnel which hampered pathing trains through.[27][note 3]

Binliners and other traffic

Binliners are so named because they carry waste traffic in containers on the same type of wagons used to carry (freight)liner trains, (binliner being a portmanteau of the words bin and liner, so it sounds like a binliner).[29][30][31]

The carrying of waste on the railway network, used to involve slow moving wagons, but in the 1970s, terminals began opening which would take compacted waste in containers direct to a landfill site.[32] Whilst this traffic is not routinely grouped under the intermodal umbrella, its use of containers makes it an intermodal railfreight service, even if no onward road transport was used at the destination.[33] Most binliners would run as block trains, but occasional special traffics would be railed to its final destination via the wagonload network, such as spent shot blast from Falmouth to Brindle Heath in Greater Manchester.[34]

A binliner train at Montpelier station, bound for Severnside EfW

Most destinations were former quarrying or mining operations that had applications to take landfill. The main sites were at Forders in Bedfordshire, Calvert in Buckinghamshire, Appleford in Oxfordshire, Roxby Gullet in Lincolnshire and Appley Bridge in Greater Manchester. The main authorities using these sites were Greater London for Forders and Calvert, Avon for Calvert and Appleford, with Greater Manchester utilising first Appley Bridge, then Roxby when Appley Bridge was full.[35] A similar operation was used on the Powderhall Branch in Edinburgh, which used to take compacted waste to exhausted quarry workings at the cement works at Oxwellmains in the Scottish Borders.[36]

As an adaptation of the binliner trains, a landfill tax introduced in the 2010s, prompted some authorities to send their waste to be burnt in an energy from waste plant (EfW).[37] Merseyside waste is burnt at the Wilton EfW plant, and some waste from London (loaded at Brentford) is burnt at the Severnside EfW plant.[38]

Other commodities have been sent via containers such as desulphogypsum from power stations to gypsum processing plants, however, the containers are used solely for this purpose and not used as a generic swap container service available for different goods.[39] Containers are used on the desulphogypsum traffic as it is sticky, so the use of hopper wagons would not work, and the use of tippler wagons would have been more expensive.[40]

Rail versus other modes

In many areas of freight transport, rail loses out to road (or water transport), typically in smaller consists which has led to the demise of the wagonload network in Great Britain due to the small tonnages involved.[41] Many containers are transferred between ports in Britain by water transport, mostly at sea using coastal shipping, but some on the canal or river systems. In 2018, the movement of Ro-Ro shipping traffic (which accounts for containers transported by sea, instead of the sea to land designation, which is Lo-Lo), equated to 3.3 billion tonne kilometres, in and around the United Kingdom.[42] Even so, one of four containers that enter the United Kingdom, are then transported/part transported onwards by the use of railfreight.[43]

Where rail transport has been beneficial, it has been over long distances such as Felixstowe to Coatbridge (Glasgow). Short distance flows are deemed uneconomic unless they can either be back filled, or be given a guaranteed full load on each train. An example of this was the Wilton to Doncaster Railport service in the 1990s/early 2000s, which carried containerised chemicals a distance of just 85 miles (137 km).[44] A similar service operates between Tees Dock and Doncaster iPort, which has an out and back run of only 200 miles (320 km), and as such, the train and locomotive can be utilised twice in one day, making greater use of the resources.[45] A service between Grangemouth on the Firth of Forth, and Elderslie in Renfrewshire, travelled a distance of only 43 miles (69 km) in the one direction. Whilst it normally loaded to 100% going eastbound (from Elderslie), it was only very lightly loaded westbound (from Grangemouth). However, its ability to deliver containers the short distance and avoid the congested M8, M80, M876 and M9 motorways, meant that it afforded customers a better transit time. The wagons and locomotive were used on additional freight services in between its intermodal run.[46]

The movement of railfreight is measured in net tonne kilometres (NTK). The figures for intermodal railfreight between 1998 and 2018 are given below. Between 1975 and 1995, the NTK for intermodal traffic steadily decreased from 3.1 billion to 2.3 billion. Post 1996 (privatisation of the railfreight companies), this has seen a steady rise.[47]

Railfreight stats 1998–2018 in the United Kingdom
Railfreight intermodal by billion net tonne kilometres (NTK)
Date Intermodal (billion tonne kilometres) All railfreight Refs Date Intermodal All railfreight Refs
1998–99 3.5 18.2 [48] 2008–09 5.2 19.1 [49]
1999–00 3.9 18.1 [48] 2009–10 5.5 19.2 [49]
2000–01 3.7 19.4 [48] 2010–11 5.7 21.1 [49]
2001–02 3.5 18.5 [48] 2011–12 6.3 21.5 [50]
2002–03 3.4 18.9 [50] 2012–13 6.3 22.7 [49]
2003–04 3.5 20.3 [48] 2013–14 6.2 22.2 [50]
2004–05 4 21.7 [48] 2014–15 6.5 17.8 [49][note 4]
2005–06 4.4 21.9 [48] 2015–16 6.4 17.2 [49]
2006–07 4.7 21.2 [49] 2016–17 6.8 17 [49]
2007–08 5.1 20.6 [49] 2017–18 6.7 17.4 [49]

Operational enhancements

Constraints on the movement of containers across the UK rail network have been the loading gauge of the railway lines themselves, with most lines being able to accommodate 8 feet 6 inches (2.59 m) containers.[52] Only a few lines can handle the larger 9-foot-6-inch (2.90 m) containers which has led to some lines being adapted to accept the larger gauge, while other routes have used 'pocket' wagons, where the container sits lower down in the wagon.[53] Due to the steady year-on-year increase of intermodal traffic volumes, Network Rail, the owner and infrastructure manager of the UK rail network, has undertaken a series of schemes to allow easier pathing and the removal of gauge restrictions on core routes across the network.[54]

Additionally, due to the increase in billion tonne kilometres travelled, and intermodal slowly gaining a larger market share of railfreight tonnage moved, there have been several key network enhancement operations to enable smoother running of intermodal trains. Outside of the development of STRI's and general improvements in terminals and ports, the key programmes are listed below.

66504 heading south at Northallerton with a Teesport to Felixstowe service. This service has had to go via Darlington railway station and then head south, rather than take the direct route via Yarm due to Northallerton-Eaglescliffe line not being engineered to W12 standards. The direct line through Yarm joins in the right foreground.
  • 2000 (onwards) - Felixstowe branch line - a programme of engineering works to improve pathing availability on what was largely a single-track branch line in the early days of privatisation. The 2019 engineering works saw a new passing loop installed to a length of 1.4 kilometres (0.87 mi).[55] The electrification of the line between Felixstowe and Ipswich is designated as a "priority route(s) to support electrification of railfreight services."[56]
  • 2004 - Ipswich tunnel enhancement - work to lower the floor of the tunnel, thus allowing 9 feet 6 inches (2.90 m) containers to be carried through the tunnel.[57][58] This was part of a wider £30 million Strategic Rail Authority programme to enhance the gauge between Felixstowe and Birmingham via London.[59]
  • 2010–2011 - Gauge enhancement on the route between Southampton and the West Midlands.[60]
  • 2012 - Nuneaton North Chord - previous to the chord being built at Nuneaton, freight trains had to cross the tracks on the flat at Nuneaton station. The new chord allows northbound trains to access the down line without conflicting movements of other trains on the busy West Coast Main Line.[61]
  • 2014 - Ipswich Chord - a 0.75-mile (1.21 km) new chord going from east to north allowing trains to access the Peterborough line from the Port of Felixstowe (and vice versa) without having to reverse in Ipswich yard.[62][63]
  • 2021 Werrington Dive Under - works undertaken at Werrington Junction north of Peterborough to allow freight trains to access/egress the Lincoln line and the March line without conflicting with fast passenger trains on the East Coast Main Line.
  • 2030 (possible) - a gauge enhancement of the Northallerton–Eaglescliffe line to bring that line, the Stillington line and beyond to Newcastle to W12 gauge clearance.[64]

Network Rail have other schemes in the proposal category that can affect intermodal traffic. One of these is known as the Castlefield corridor, a section of track between Castlefield Junction in West Manchester, and Manchester Picadilly railway station. Both Trafford Park intermodal terminals have east facing connections that lead onto the Castlefield Corridor, and so must traverse the bottleneck through Manchester Oxford Road and Manchester Piccadilly. After the Ordsall Chord opened in West Manchester, more trains were diverted to go through this bottleneck causing delays and cancellations, with Network Rail going so far as to label the 1-mile (1.6 km) stretch of line as "congested infrastructure".[65]

Some suggestions have been to have a west facing connection to the intermodal terminals so that they can access the West Coast Main Line via a new curve in the Warrington area. Another proposal, put forward by Railfuture, is to relocate the Manchester intermodal terminals on the old Carrington Branch, and therefore freeing up paths through Castlefield for passenger trains, or to add flex to the operational capacity of the corridor.[66]

Open terminals

Name Location Open Type Notes Refs
Barking/Ripple Lane East London 1972 Terminal Has had various container/intermodal uses, but is known for being the terminal for intermodal trains from China. Trains are cheaper than air and faster than sea transport. [67][68]
Basford Hall Crewe 1992 Node Basford Hall yard is used to swap portions of intermodal trains before onward delivery. The yard started providing a 'hub-and-spoke' service to the myriad of Freightliner trains passing through from 1992 onwards [69]
Birch Coppice Polesworth Terminal The terminal is located on the former Birch Coppice Colliery branch, and as it is not operated by a railfreight company, it has seen traffic hauled by DB Cargo, Freightliner and GBRf. [70]
DIRFT (I/II/III) Daventry 1997/2005/2021 Terminal/Node Daventry International Rail Freight Terminal. Has been expanded into DIRFT II, with DIRFT III projected for 2021.[71] [72][73]
Ditton Widnes November 1998 Terminal Opened on the site of a former British Oxygen Company terminal [74]
East Midlands Gateway Castle Donington 2020[note 5] Terminal [76]
Elderslie Renfrewshire 2001 Terminal Used as a general railfreight terminal, but most recently sees a three-way intermodal service between Doncaster iPort, Teesport and itself. [77][78][79]
Felixstowe Suffolk 1972/1983/2013 Port (three sites) Felixstowe intermodal railfreight handled over 900,000 TEUs in 2014 [80][81]
Garston Liverpool 1965 Terminal [82]
Grangemouth Grangemouth September 2000 Port/Terminal [83]
Hams Hall Lea Marston July 1997 Terminal [84]
iPort Doncaster 2018 Terminal [85]
Inverness Inverness 1997 Terminal In 1997, the supermarket Safeway, launched a direct container/swapbody service between Mossend and Inverness. Whilst this service ceased in 2004, when Safeway were taken over by Morrisons, the terminal at Inverness still retained a container transfer service between the Highlands and the Central Belt of Scotland. [86]
Lawley Street Birmingham 1969 Terminal Traffic from Dudley was transferred here in 1986 [87]
London Gateway Thurrock 2013 Port/Terminal [88]
Maritime Southampton 1972 Terminal/Port [89]
Millbrook Southampton January 1968 Terminal [90]
Port of Southampton Southampton 2017 Port [91]
Port of Tilbury Tilbury 1970 Port [92]
Purfleet East London May 1997 [93]
Rotherham South Yorkshire 2015 Terminal Opened in 2015 as an alternative site to that at Selby. GBRf containers were all diverted to here instead of Selby. [94]
Rugby Warwickshire Terminal
Seaforth Liverpool 1979 Port/terminal Services had ceased by 2008, but the terminal remained open for other port traffic. Intermodal trains were started again in 2018, mostly destined for Mossend. [95][96]
Stourton Leeds, West Yorkshire 1967 Terminal
Teesport Teesport Port Freightliner moved to this site in 2014, closing their previous site at Wilton at the same time. Other operators use Teesport, such as GBRf services to Doncaster iPort. [97]
Teesside Rail Intermodal Park (TRIP) Middlesbrough 2013 Terminal [98]
Tilbury2 Port East London May 2020 Port Newer port terminal which replaced TIRFT in 2020 [99]
Telford International Rail Freight Park (TIRFP) Telford 2009- Terminal Intended as an intermodal terminal, but the traffic failed to materialise. Some containers are delivered via the Ministry of Defence trains that use the site, but the bulk of this traffic is non-intermodal. [100]
Trafford Park Greater Manchester 1969 Terminal Opened as a second terminal to Longsight, it became the main Freightliner depot in Manchester when operations at Longsight ceased in 1987. [101]
Trafford Park Euroterminal Greater Manchester 1993 Terminal [102]
Wakefield Europort West Yorkshire 1996 Terminal Originally operated by EWS. has the capacity to handle 175,000 TEUs annually. [102]
Wembley (EFOC) North London 1993 Node Wembley European Freight Operating Centre; it was built on the former London North Western Railway Sudbury yard. Whilst it was designed with a capacity of 70 trains per day, not all of this traffic would be intermodal in nature. Trains would arrive from other parts of the UK and be remarshalled into specific destinations on the continent. [103][104][105]
Wentloog Cardiff February 2001 Terminal Opened to replace the previous site at Pengam; site occupies over 25 acres (10 ha), twice the size of Pengam [106]

Mothballed/unused terminals

The following are either not in use as intermodal terminals at present, but remain connected to the national network. Most will still be in use for rail business, but not handling containers.

Name Location Dates of operation Notes Refs
ARIFT Isle of Anglesey 2018 Has been used to accept new passenger trains onto the network [107][108]
Bristol West Bristol 2010–2019 Opened to transport wine in containers. The cessation of tolls for vehicles on the Severn Bridge(s), meant that the traffic was diverted to Wentloog at Cardiff and sent to Bristol via lorry. [109]
Burton-on-Trent Burton-on-Trent –2009 [110]
Griffin Wharf Ipswich 1970–2013 Container terminal used sporadically by EWS/DB Cargo, until economic pressures forced a relocation to loading at Felixstowe. Terminal is available for other traffics, such as sand and sea-dredged aggregates. [111]
Harwich Essex Much of the intermodal traffic at Harwich as hauled by Freightliner was lost when the Channel Tunnel opened. It has been used sporadically since then. [112]
Ripple Lane East London c. 1970–2007/2008 Used up to 2007 for various Freightliner flows, but was notable for being used in the Sugarliner service, conveying sugar to Daventry. [113]
Selby North Yorkshire 2002–2018 The terminal at Selby was run by the Potter group, but traffic to Selby was later diverted to South Yorkshire; first to Rotherham, and occasionally to Sheffield Tinsley. [114]
Thamesport Isle of Grain 1991–2016 Closed in 2016 due to downturn in container handling. Other terminals, specifically the Port of Southampton, and London Gateway, took most of Thamesport's business. [111][115][116]

Closed terminals

This section relates to former terminals which had dedicated services, and infrastructure such as gantry cranes, which have now closed. It does not include such terminals such as those at ports which operated a service previously. For example, in the early part of the 2000s, containers of car parts were transferred from Avonmouth to Tyne Dock for Nissan.[117] Both these freight terminals still operate, but not necessarily in an intermodal capacity.

Name Location Dates Notes Refs
Aberdeen 1966–1987 [118][119]
Aintree Liverpool 1969–1986 The site was dedicated from the outset to international traffic delivered to and from Aintree via Southampton. [120][118]
Barton Dock Manchester 1969–2013 The site was dedicated from the outset to international traffic delivered to and from Barton Dock via Southampton. [120][121]
Beeston Nottingham 1969–1986 [122][20]
Caernarfon North Wales 1970–1972 Used as an alternative port after the Menai Bridge burnt down in 1970. The track was reinstated between Bangor and Caernarvon for the traffic to access the branch.[note 6] [123]
Dudley West Midlands 1967–1986 Closed completely; traffic transferred to Lawley Street in Birmingham [122][118]
Dundee 1972–1987 [118][124]
Follingsby Newcastle 1967–1987 [20]
Greenock –1986 [118]
Gushetfaulds Glasgow 1965–1993 [125]
Heysham 1967– [126]
Holyhead Anglesey –1991 Spent two years idle (1970 – 1972), when containers were sent to Caernarfon after the Menai Bridge Fire of 1970. [127]
Immingham 1999 Used sporadically for feeder services during British Rail days. EWS ran a service between Immingham and Ditton in 1999. [128]
Hull 1967–1987 (1997) Closed in 1987. Freightliner ran some containers trains to Hull from Trafford Park in 1997, but the service was deemed uneconomic.[129] The port of hull has intermodal transfer facilities, but this only exists between sea and road transport.[94] [20]
King's Cross
(York Way)
London 1968–1986 Also known as Maiden Lane [118][12]
Longsight Manchester 1966–1987 [130][20]
Par Cornwall 1968–1970 Service from Park Royal (London), only lasted two years. [131][126]
Pengam Cardiff 1967 – 2001 Closed in February 2001, replaced by Wentloog terminal further east [122]
Plymouth 1968–1970 Service from Park Royal (London), only lasted two years. [131][126]
Portobello Edinburgh 1965–1987 [118]
Sheffield 1967– [126]
Stockton 1967–1989 Closed in 1989; replaced by Wilton on South Teesside [132]
Stratford London 1968–1994 [125][133]
Danygraig Swansea 1969–1987 [20][87]
TIRFT Tilbury 1997–2020 Tilbury International Railfreight Terminal, built on the former Tilbury Riverside station, was replaced by a new site, Tilbury2 Port, built on the old Tilbury Power Station site [134][99]
Wilton Teesside 1989–2014 Closed in 2014; replaced by a new site within Teesport [135]

Future and proposed sites

Name Location Date Notes Ref
Avonmouth Container Terminal Avonmouth Docks A new deep sea terminal to cater for an increase in container traffic. The share of containers travelling by rail is estimated to be 40%. [136][137]
East Midlands Intermodal Park Toyota Manufacturing UK plant, Burnaston A NSIP (nationally significant infrastructure project) first proposed in 2014, in 2021 it was announced that the site would be included in proposals to create an East Midlands Freeport. [138][139]
Four Ashes Four Ashes, Staffordshire Site will be adjacent to the West Coast Main Line and Junction 12 of the M6 Motorway. Site was approved by the Secretary of State for transport in May 2020. The proposed capability is for ten trains per day. [140][141][142]
Mossend International Railfreight Park (MIRP) Mossend 2021 Site is under construction with an expected opening date of 2021. It will be operated by P D Stirling [143]
Northampton Gateway Roade (near Northampton) 2023 Site under construction since January 2021. The site is on land between the Northampton Loop Line and the M1 Motorway, and is only 18 miles (29 km) from Daventry SRFI. [144][145]
Radlett Airfield Radlett 2013 Approval granted in 2013, but St Albans Council zoned the area as housing, which has slowed the process. The campaigns for and against the SRFI have been protracted. [142]
Rail Central Blisworth Proposed site between the West Coast Main Line and the Northampton Loop line [146]

There are proposals to also open SRFIs (Strategic Rail Freight Interchanges) at Skypark in Devon, Parkside in Lancashire, Etwall in Derbyshire, Burbage, Peterborough and SIFE (Slough International Freight Exchange) with a connection on the Colnbrook branch.[144][147]

Operators

Class 90s, no 90024 and 90036 pass Atherstone railway station with an intermodal train from Mossend to Daventry

Intermodal trains were operated by British Rail from its inception until Privatisation in 1996.[9] Immediately after Privatisation, the main company providing intermodal services was Freightliner, though EWS carried containers on their Enterprise wagonload service,[148] and had started an initial service between Harwich and Doncaster to rival services run by Freightliner from Felixstowe.[149] Later, other operators took on their own services, oftentimes running to their own unique locations, though with the gradual increase in Strategic Railfreight Interchanges (SFRI), many operators would rail containers to the same destinations from the same point of origin.[18][150]

DIRFT, which opened in 1997, had ten departures daily operated by Freightliner, DB Cargo (previously EWS), and Direct Rail Services. Five of those trains went to Scotland going to their own loading points for each company; typically Coatbridge for Freightliner, Mossend for DB Cargo and either Mossend, Elderslie or Grangemouth for DRS.[151]

  • Advenza Freight; 2004–2009[note 7][152]
  • British Rail 1967–1997
  • Direct Rail Services 2001–present[106]
  • DB Cargo 1996–present[153]
  • Fastline Freight 2006–2010[154]
  • Freightliner 1995–present[155]
  • GB Railfreight 2002–present[156]

See also

  • Rail freight in Great Britain

Notes

  1. Geographically, this includes Northern Ireland, however, the term Great Britain, refers only to England, Scotland and Wales, or, occasionally, to the mainland United Kingdom. As it is perceived that containers are not moved in Northern Ireland by rail, the 25% share of containers moved by Railfreight must be within the mainland UK only.
  2. Railfreight as a whole, had been projected to be carrying over 6,000,000 tonnes (6,600,000 tons) of freight per year by 1997, but in reality less than half that was being carried.[26]
  3. Delays were typically around several months; after the 2008 fire, the tunnel was closed for five months.[28]
  4. The drop in billion tonne kilometres was attributed to the large-scale loss of coal transported by rail in the United Kingdom.[51]
  5. Opened for traffic in early 2020; officially opened 28 February 2020.[75]
  6. The name Caernarfon is used, but until 1974, the anglicised version of Caernarvon was used by British Rail.
  7. Whilst the company was in operation between those dates, its intermodal services lasted, weeks or months only.

References

  1. "UK Port Freight Statistics: 2018". August 2019. p. 2. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/826446/port-freight-statistics-2018.pdf. 
  2. Downie, George (1974). "Freightliner". Jane's Freight Containers (London: Jane's): 111. ISSN 0075-3033. 
  3. Shannon 2010, p. 8.
  4. Ratcliffe 2019, p. 36.
  5. Shannon 2010, p. 7.
  6. Casserley 1972, p. 73.
  7. Wilson, G Lloyd (September 1936). "The Use of Freight Containers by British Railways". The Annals of the American Academy of Political and Social Science (Philadelphia: Sage) 187: 173–177. doi:10.1177/000271623618700125. ISSN 0002-7162. 
  8. FARCM 1969, p. 80.
  9. 9.0 9.1 Shannon 2013, p. 109.
  10. FARCM 1969, p. 67.
  11. Jones, P N; North, J (January 1982). "Unit loads through Britain's ports: a further revolution". Geography (Geographical Association) 67 (1): 29. ISSN 0016-7487. 
  12. 12.0 12.1 "The Freightliner initiative - CRHT Web site". http://www.crht1837.org/join/draft-history-page/great-northern-railway/the-freightliner-initiative. 
  13. Roth & Divall 2015, p. 137.
  14. Fowkes & Nash 2004, p. 4.
  15. Collins 1985, p. 99.
  16. Shannon, Paul (22 April 2020). "Felixstowe: is 47 trains a day achievable?". Rail (Peterborough: Bauer Media) (903): 48–49. ISSN 0953-4563. 
  17. Shannon 2013, p. 19.
  18. 18.0 18.1 Shannon 2013, p. 111.
  19. Shannon 2010, pp. 22–23.
  20. 20.0 20.1 20.2 20.3 20.4 20.5 Shannon 2010, p. 22.
  21. Abbot, James (December 1994). "Freightliner: who will buy it?". Modern Railways (Surrey: Ian Allan) 47 (555): 749–752. ISSN 0026-8356. 
  22. Woodburn, Allan G. (July 2006). "The non-bulk market for railfreight in Great Britain". Journal of Transport Geography 14 (4): 309. doi:10.1016/j.jtrangeo.2005.06.002. http://westminsterresearch.wmin.ac.uk/1933/1/Woodburn_2006_final.pdf. 
  23. Fowkes & Nash 2004, pp. 3–4.
  24. Moore, Rowan; critic, architecture (15 April 2018). "A shed the size of a town: what Britain's giant distribution centres tell us about modern life". The Observer. https://www.theguardian.com/artanddesign/2018/apr/15/shed-the-size-of-town-what-britains-giant-distribution-centres-tell-us-about-modern-life. 
  25. Shannon, Paul (4 April 2012b). "Railfreight Distribution - BR's last stand". Rail (Peterborough: Bauer Media) (693): 57. ISSN 0953-4563. 
  26. Shannon 2012a, p. 74.
  27. Hope, Richard (1 November 2003). "Eurotunnel's plan to boost intermodal freight" (in en). Railway Gazette International. https://www.railwaygazette.com/news/eurotunnels-plan-to-boost-intermodal-freight/31664.article. 
  28. Frary, Mark (23 January 2009). "Faster Eurostar services after fire damage repair" (in en). The Times. https://www.thetimes.co.uk/article/faster-eurostar-services-after-fire-damage-repair-tgx8j02g2zv. 
  29. "Disused Stations: Calvert Station". http://www.disused-stations.org.uk/c/calvert/. 
  30. "Rubbish by rail wastes no time restarting". RailFreight.com. 26 February 2020. https://www.railfreight.com/railfreight/2020/02/26/rubbish-by-rail-wastes-no-time-restarting/. 
  31. Bennett 2017, p. 55.
  32. Ratcliffe 2012a, p. 76.
  33. Shannon 2008, p. 53.
  34. Ratcliffe 2012a, p. 78.
  35. Shannon 2008, pp. 53–55.
  36. Shannon 2012a, p. 56.
  37. Ratcliffe 2019, p. 46.
  38. Ratcliffe, David (13 May 2019). "Freight Focus: Fragrant world of the 'Binliner' - The Railway Hub". The Railway Hub. https://www.therailwayhub.co.uk/3643/freight-focus-fragrant-world-of-the-binliner/. 
  39. Buck 2005, pp. 59, 69.
  40. Shannon, Paul (April 2011b). "No Gypsum Curse". Railways Illustrated (Shepperton: Ian Allan) 9 (4): 65. ISSN 1479-2230. 
  41. Shannon 2014a, p. 110.
  42. "UK Port Freight Statistics: 2018". August 2019. p. 17. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/826446/port-freight-statistics-2018.pdf. 
  43. "Freight Network Study". April 2017. p. 19. https://www.networkrail.co.uk/wp-content/uploads/2017/04/Freight-Network-Study-April-2017.pdf. 
  44. Shannon 2009, p. 92.
  45. Coward, Andy (21 October 2020). "iPort Rail builds on an impressive start". Rail Magazine (Peterborough: Bauer Media) (916): 50. ISSN 0953-4563. 
  46. "Short Haul Rail Freight on Track for Profits in Scotland". 2010. p. 4. https://www.transport.gov.scot/media/14380/short_haul_rail_freight_on_track_for_profits_in_scotland.pdf. 
  47. Fowkes & Nash 2004, p. 28.
  48. 48.0 48.1 48.2 48.3 48.4 48.5 48.6 Woodburn, Allan (August 2007). "The role for rail in port-based container freight flows in Britain". Maritime Policy & Management 34 (4): 33. doi:10.1080/03088830701539032. http://westminsterresearch.wmin.ac.uk/4434/1/Woodburn_2007_-_Feb_2009.pdf. 
  49. 49.0 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 "National Railways freight moved by commodity, annual from 1996/97" (ODS). December 2019. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/851676/rai0401.ods. 
  50. 50.0 50.1 50.2 "2014-15 Quarter 1 Statistical Release Freight Rail Usage". p. 6. https://orr.gov.uk/__data/assets/pdf_file/0020/14708/freight-rail-usage-2014-15-q1.pdf. 
  51. Weedy, Simon (6 September 2017). "Steep decline in coal demand sees UK rail freight down". RailFreight.com. https://www.railfreight.com/business/2017/06/09/steep-decline-in-coal-demand-sees-uk-rail-freight-plummet/. 
  52. "MULTI-MILLION POUND RAIL PROJECT TAKES A WEIGHT OFF OUR ROADS" (in en). Network Rail Media Centre. 1 June 2009. https://www.networkrailmediacentre.co.uk/news/multi-million-pound-rail-project-takes-a-weight-off-our-roads. 
  53. Shannon 2010, pp. 38–39,55.
  54. Iggulden 2018, p. 25.
  55. Huebeck, Peter (September 2020). "Getting projects right". Modern Railways (Stamford: Key Publishing) 77 (864): 54. ISSN 0026-8356. 
  56. "Freight Network Study". April 2017. p. 41. https://www.networkrail.co.uk/wp-content/uploads/2017/04/Freight-Network-Study-April-2017.pdf. 
  57. Shannon 2011a, p. 17.
  58. Lowe 2016, p. 42.
  59. Shannon 2010, p. 46.
  60. Shannon, Paul (June 2011b). "Fighting for a share". Railways Illustrated (Shepperton: Ian Allan) 9 (6): 67. ISSN 1479-2230. 
  61. "Chords separate freight and inter-city trains" (in en). Railway Gazette International. 15 November 2012. https://www.railwaygazette.com/freight/chords-separate-freight-and-inter-city-trains/37487.article. 
  62. "Ipswich Chord rail link opens for Felixstowe freight". BBC News. 29 March 2014. https://www.bbc.co.uk/news/uk-england-suffolk-26790530. 
  63. Stacey, Mungo (1 May 2014). "Ipswich chord and freight yard | Rail Engineer". Rail Engineer. https://www.railengineer.co.uk/ipswich-chord-freight/. 
  64. Sherratt, Philip, ed (September 2020). "York to Newcastle; options for expansion". Modern Railways (Stamford: Key Publishing) 77 (864): 77. ISSN 0026-8356. 
  65. Lea, Robert (3 February 2020). "A mile of track shows how Britain came off the rails". The Sunday Times. https://www.thetimes.co.uk/article/a-mile-of-track-shows-how-britain-came-off-the-rails-263fc0dwx. 
  66. "Railfuture | Relieving Castlefield". https://www.railfuture.org.uk/article1855-Relieving-Castlefield. 
  67. "'China freight train' on way to Barking". BBC News. 3 January 2017. https://www.bbc.co.uk/news/business-38497997. 
  68. Shannon 2013, p. 13.
  69. Shannon 2013, p. 97.
  70. Shannon, Paul (April 2012c). "Thinning red lines". The Railway Magazine (Horncastle: Mortons Media) 158 (((1,334))): 41. ISSN 0033-8923. 
  71. Nicholls, Mark, ed (October 2020). "Daventry Expansion". Railways Illustrated (Stamford: Key Publishing) 18 (10): 14. ISSN 1479-2230. 
  72. "£1bn freight terminal signed off". BBC News. 4 July 2014. https://www.bbc.co.uk/news/uk-england-northamptonshire-28158334. 
  73. "9,000 jobs on the way with new DIRFT expansion near Rugby" (in en). Rugby Advertiser. 20 January 2016. https://www.rugbyadvertiser.co.uk/news/9000-jobs-way-new-dirft-expansion-near-rugby-802757. 
  74. Buck 2005, p. 67.
  75. Harris, Nigel, ed (11 March 2020). "East Midlands Gateway Launches". Rail Magazine (Peterborough: Bauer Media) (900): 12. ISSN 0953-4563. 
  76. Simpson, Maggie, ed (November 2019). "East Midlands gateway on track for completion". RFG News (London: Rail Freight Group) (138): 14. OCLC 863531257. 
  77. Shannon 2010, p. 48.
  78. Jones, Ben (December 2020). "iPort gains new Scottish route". The Railway Magazine (Horncastle: Mortons Media) 166 (((1,437))): 70. ISSN 0033-8923. 
  79. "Malcolm rail enjoys 10 years growth". Global Railway Review. 22 March 2011. https://www.globalrailwayreview.com/news/8585/malcolm-rail-enjoys-10-years-growth/. 
  80. "GB Railfreight launches Port of Felistowe's 31st daily rail freight service" (in en). Ipswich Star. 2 September 2015. https://www.ipswichstar.co.uk/news/business/gb-railfreight-launches-port-of-felistowe-s-31st-daily-rail-freight-service-1-4217623. 
  81. Shannon 2020, p. 113.
  82. "Disused Stations: Church Road Garston". http://disused-stations.org.uk/g/garston_church_road/index.shtml. 
  83. Buck 2005, p. 89.
  84. Buck 2005, p. 45.
  85. Simpson, Maggie, ed (September 2018). "A day '15 years in the making'; iPort Rail opens for business". RFG News (London: Rail Freight Group) (131): 4. OCLC 863531257. 
  86. Spaven, David (27 December 2018). "Time is ripe for rail freight to expand and grow" (in en). The Scotsman. https://www.scotsman.com/news/environment/david-spaven-time-ripe-rail-freight-expand-and-grow-1424076. 
  87. 87.0 87.1 European Conference of Ministers of Transport 1970, p. 163.
  88. Shannon 2019, p. 45.
  89. Bendall, Simon, ed (December 2015). "Scenecraft receives a big lift". Rail Express Modeller (Horncastle: Morton's Media) (235): M26. ISSN 1362-234X. 
  90. Bendall, Simon, ed (December 2015). "Container terminals through the years". Rail Express Modeller (Horncastle: Morton's Media) (235): M28. ISSN 1362-234X. 
  91. Clinnick, Richard (8 November 2017). "GBRf starts serving Southampton" (in en). Rail Magazine. https://www.railmagazine.com/news/network/gbrf-starts-serving-southampton. 
  92. Shannon 2013, p. 12.
  93. Buck 2005, p. 42.
  94. 94.0 94.1 Iggulden 2018, p. 27.
  95. Ratcliffe 2019, p. 37.
  96. Shannon 2019, p. 105.
  97. "Teesport to get new £3m rail terminal". BBC News. 18 July 2014. https://www.bbc.co.uk/news/uk-england-tees-28361691. 
  98. Hugill, Steven (31 January 2013). "Logistics company launches £2.6m rail terminal" (in en). The Northern Echo. https://www.thenorthernecho.co.uk/business/10194712.av-dawson-middlesbrough-opens-first-phase-rail-terminal-increase-business/. 
  99. 99.0 99.1 Scotchman, Ian C (September 2020). "Major changes for rail as Tilbury2 port opens". The Railway Magazine (Horncastle: Mortons Media) 166 (((1,434))): 64. ISSN 0033-8923. 
  100. Shannon 2010, p. 54.
  101. Shannon 2020, p. 54.
  102. 102.0 102.1 Lowe 2016, p. 145.
  103. Lowe 2016, p. 146.
  104. Buck 2005, p. 9.
  105. Shannon 2019, p. 139.
  106. 106.0 106.1 Buck 2005, p. 96.
  107. "ARiFT handles first Holyhead rail freight operation". International Bulk Journal. 28 August 2018. https://www.ibj-online.com/arift-handles-first-holyhead-rail-freight-operation/326. 
  108. Simpson, Maggie, ed (September 2018). "Anglesey gets rail freight terminal". RFG News (London: Rail Freight Group) (131): 11. OCLC 863531257. 
  109. "City's new 'wine train' terminal". BBC News. 29 July 2010. https://www.bbc.co.uk/news/uk-england-bristol-10805870. 
  110. Shannon, Paul (August 2010b). "Getting to the hub of the matter". Railways Illustrated (Shepperton: Ian Allan) 8 (8): 59. ISSN 1479-2230. 
  111. 111.0 111.1 Shannon, Paul (February 2014b). "Freight review:gains and losses". Railways Illustrated (Stamford: Key Publishing) 12 (2): 67. ISSN 1479-2230. 
  112. Fowkes & Nash 2004, p. 5.
  113. Shannon, Paul (March 2010d). "North Thamesside Freight". Railways Illustrated (Shepperton: Ian Allan) 8 (3): 81. ISSN 1479-2230. 
  114. Shannon 2011a, p. 15.
  115. Porter, Janet (11 May 2016). "Thamesport to be redeveloped as breakbulk facility - Lloyd's Loading List". Lloyds Loading List. https://www.lloydsloadinglist.com/freight-directory/news/Thamesport-to-be-redeveloped-as-breakbulk-facility/66376.htm#.XuaETEVKjIU. 
  116. Shannon 2010, p. 27.
  117. Buck 2005, p. 78.
  118. 118.0 118.1 118.2 118.3 118.4 118.5 118.6 Shannon 2010, p. 17.
  119. Shannon 2010, p. 20.
  120. 120.0 120.1 Ratcliffe 2012b, p. 79.
  121. Ratcliffe 2019, p. 38.
  122. 122.0 122.1 122.2 Bendall, Simon, ed (December 2015). "Container terminals through the years". Rail Express Modeller (Horncastle: Morton's Media) (235): M28. ISSN 1362-234X. 
  123. Baughan 1991, p. 105.
  124. "United Kingdom". International Railway Progress (London: Tothill Press): 30. 1972. OCLC 907901561. 
  125. 125.0 125.1 Shannon 2010, p. 29.
  126. 126.0 126.1 126.2 126.3 Roth & Divall 2015, p. 139.
  127. "Disused Stations: Caernarvon Station". http://www.disused-stations.org.uk/c/caernarvon/. 
  128. Ratcliffe, David (November 2020). "EWS Intermodals". Traction Magazine (Lincolnshire: Warners Group) (260): 42. ISSN 1354-2680. 
  129. Skoyles, James (September 2014). "To Hull and back". Rail Express (Horncastle: Mortons Media) (220): 21. ISSN 1362-234X. 
  130. Ratcliffe 2019, p. 39.
  131. 131.0 131.1 Shannon 2013, p. 11.
  132. Chapman 2007, p. 24.
  133. Shannon 2013, p. 110.
  134. Buck 2005, p. 56.
  135. "Port operator's £3m expansion" (in en). The Northern Echo. 17 July 2014. https://www.thenorthernecho.co.uk/business/11346894.port-operators-pound-3m-expansion/. 
  136. Johnson, Howard (25 March 2020). "Regional News". Rail Magazine (Peterborough: Bauer Media) (901): 26. ISSN 0953-4563. 
  137. "Deep Sea Container Terminal | The Bristol Port Company". https://www.bristolport.co.uk/trades/containers/deep-sea-container-terminal. 
  138. "East Midlands Intermodal Park". National Infrastructure Planning. https://infrastructure.planninginspectorate.gov.uk/projects/east-midlands/east-midlands-intermodal-park/#. 
  139. "East Midlands Intermodal Park". https://uk.goodman.com/east-midlands-intermodal-park?. 
  140. Simpson, Maggie, ed (September 2018). "Four Ashes DCO to be examined by planning inspectorate". RFG News (London: Rail Freight Group) (131): 13. OCLC 863531257. 
  141. Harris, Nigel, ed (3 June 2020). "Green light for Four Ashes freight". Rail Magazine (Peterborough: Bauer Media) (906): 13. ISSN 0953-4563. 
  142. 142.0 142.1 Comfort, Nick (July 2020). "West Midlands Rail Freight Interchange approved". Today's Railways UK (Sheffield: Platform 5) (221): 18. ISSN 1475-9713. 
  143. Cross, David (September 2019). "An update on one of Scotland's most exciting railfreight developments". RFG News (London: Rail Freight Group) (137): 21. OCLC 863531257. 
  144. 144.0 144.1 Milner, Chris (November 2019). "Strategic Rail Freight Interchanges". The Railway Magazine (Horncastle: Mortons Media) 165 (((1,424))): 48. ISSN 0033-8923. 
  145. Horgan, Rob (5 January 2021). "Main work begins on huge logistics hub and rail freight interchange". New Civil Engineer. https://www.newcivilengineer.com/latest/main-work-begins-on-huge-logistics-hub-and-rail-freight-interchange-05-01-2021/. 
  146. Dunn, Elisabeth (November 2018). "Planning update". RFG News (London: Rail Freight Group) (132): 17. OCLC 863531257. 
  147. "Consulting Structural and Civil Engineers | Fairhurst". http://www.fairhurst.co.uk/project/slough-international-freight-exchange-sife/. 
  148. Shannon 2012a, p. 68.
  149. Shannon 2013, p. 41.
  150. Buck 2005, pp. 108, 136.
  151. Heaton, John (December 2009). "The Supermarket Run". Modern Railways (Stamford: Key Publishing) 66 (735): 53. ISSN 0026-8356. 
  152. Clinnick, Richard. "UK's stored locomotives" (in en). Rail Magazine. https://www.railmagazine.com/trains/current-trains/uk-s-stored-locomotives. 
  153. Shannon 2012a, p. 4.
  154. Shannon, Paul (May 2010). "Fastline's four year freight adventure". Rail Express (King's Cliffe, Peterborough: Foursight Publications) (168): 16. ISSN 1362-234X. 
  155. "G&W agrees to buy Freightliner Group" (in en). Railway Gazette International. 25 February 2015. https://www.railwaygazette.com/freight/gandw-agrees-to-buy-freightliner-group/40567.article. 
  156. Shannon 2011a, pp. 17–20.

Sources

External links