Engineering:MV Isla Bella

From HandWiki
History
United States
Name: Isla Bella
Owner: TOTE Maritime[1]
Operator: TOTE Services
Port of registry: United States
Route: Jacksonville, Florida to Puerto Rico
Builder: National Steel and Shipbuilding Company
Christened: 18 April 2015[2]
Completed: October 2015
Maiden voyage: 18 April 2015[2]
In service: 19 October 2015[3]
Identification:
Status: Operational
Notes: [4]
General characteristics
Class and type: Marlin
Tonnage: 36,751 GT
Length: 764 feet
Beam: 106 feet

Isla Bella and her sister ship Perla del Caribe are the world's first liquefied natural gas (LNG)-powered container ships. Isla Bella is currently used as part of the Florida-Puerto Rico trade, sailing out of Jacksonville, Florida and arriving in San Juan, Puerto Rico on a weekly basis. Both ships were built by NASSCO for TOTE Maritime Puerto Rico and replaced the last of the Ponce-class ships that were previously used for the route. They cost US$324 million to build and each is propelled by a single slow-speed engine capable of 25,191 kW at 104 rpm, which propels the ships at a maximum speed of 22 knots.[citation needed]

Isla Bella has a length of 764 feet and is 106 feet in width. It has a capacity of 3,100 TEU but can carry 20-foot, 30-foot, 40-foot, 45-foot and 53-foot containers. Isla Bella was christened on April 18 before a crowd of 3,400 people. The name Isla Bella is Spanish for “beautiful island”. The name of the vessel comes from Paola Dominguez as part of a partnership with The Puerto Rico Boys & Girls Club and TOTE.[citation needed]

Engine and fuel

Isla Bella's engine is powered by a single slow-speed MAN B&W 8L70ME-GI dual fuel gas engine.[5] This engine operates on a mixture of LNG and diesel fuel oil, the latter of which is used to ignite the natural gas. The engines are designed to run on as little as 3 percent pilot oil. The result is a 97 percent reduction in sulfur oxides and a 98 percent nitrogen oxide reduction in particulate matter coming from the exhausts.[6] To fuel this engine two 900 cubic meter cryogenic tanks are located aft of the house. The combined weight of these two tanks is 760 tons. These eighty-four-foot-long tanks hold a combined total of 475,000 gallons of LNG.[citation needed]

For the first few years, the ship was refueled from trucks. As of 2018, a dedicated LNG bunker barge and a LNG liquefication plant are being built for the Isla Bella and Perla del Caribe.[citation needed]

References