Company:Canadian Pacific Railway

From HandWiki
Short description: Class I railroad in Canada and United States
Canadian Pacific Railway
Chemin de fer Canadien Pacifique
Canadian Pacific Railway logo 2014.svg
Canadian Pacific System Railmap.PNG
Canadian Pacific system map (does not include DM&E, CMQ, or KCS trackage)
CP 8137 at Chesterton (31292201928).jpg
CP 8137, a rebuilt GE AC4400CWM, in Chesterton, Indiana
Overview
Headquarters7550 Ogden Dale Road SE, Calgary, Alberta (Global Headquarters)
Canadian Pacific Plaza, 120 South Sixth Street, Minneapolis, Minnesota (US Headquarters/Headquarters of Soo Line Railroad)
Reporting markCP, CPAA, MILW, SOO, DME, ICE, DH
LocaleCanada and the United States
Dates of operation16 February 1881–present
Technical
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Length20,100 kilometres (12,500 mi)
Other
Website{{{1}}}
Canadian Pacific Railway Limited
TypePublic
TSXCP
NYSECP
S&P/TSX 60 component
IndustryRail transport
Founded16 February 1881; 143 years ago (1881-02-16)
Headquarters
Calgary, Alberta
,
Area served
Canada
Contiguous United States
Key people
Andrew Reardon (chairman)
Keith Creel (president and CEO)
RevenueDecreaseCA$7.710 billion (2020)[1]
IncreaseCA$3.311 billion (2020)
IncreaseCA$2.444 billion (2020)
Total assetsDecreaseCA$19.221 billion (2020)
Total equityIncreaseCA$4.626 billion (2020)
Number of employees
11,904 (2020)
SubsidiariesList of subsidiary railways of the Canadian Pacific Railway, TTX Company, Dakota, Minnesota and Eastern Railroad, Minneapolis, St. Paul and Sault Ste. Marie Railroad, St. Lawrence and Hudson Railway
Website{{{1}}}
An alternative CP logo, featuring a beaver, Canada's national animal
An eastbound CPR freight train at Stoney Creek Bridge descending from Rogers Pass

The Canadian Pacific Railway (French: Chemin de fer Canadien Pacifique) (reporting marks CP, CPAA, MILW, SOO), also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), is a Canadian Class I railway incorporated in 1881. The railway is owned by Canadian Pacific Railway Limited, which began operations as legal owner in a corporate restructuring in 2001.[2]

Headquartered in Calgary, Alberta, the railway owns approximately 20,100 kilometres (12,500 mi) of track in seven provinces of Canada and into the United States,[2] stretching from Montreal to Vancouver , and as far north as Edmonton. Its rail network[3] also serves Minneapolis–St. Paul, Milwaukee, Detroit, Chicago , and Albany, New York, in the United States.

The railway was first built between eastern Canada and British Columbia between 1881 and 1885 (connecting with Ottawa Valley and Georgian Bay area lines built earlier), fulfilling a commitment extended to British Columbia[4] when it entered Confederation in 1871; the CPR was Canada's first transcontinental railway. Primarily a freight railway, the CPR was for decades the only practical means of long-distance passenger transport in most regions of Canada and was instrumental in the settlement and development of Western Canada. The CPR became one of the largest and most powerful companies in Canada, a position it held as late as 1975.[5]

The company acquired two American lines in 2009: the Dakota, Minnesota and Eastern Railroad (DM&E) and the Iowa, Chicago and Eastern Railroad (IC&E). The trackage of the IC&E was at one time part of CP subsidiary Soo Line and predecessor line The Milwaukee Road. The combined DM&E/IC&E system spanned North Dakota, South Dakota, Minnesota, Wisconsin, Nebraska and Iowa, with two short stretches into Kansas City, Missouri, and Chicago , Illinois. Also, the company owns the Indiana Harbor Belt Railroad, a Hammond, Indiana-based terminal railroad along with Conrail Shared Assets Operations. CP's ownership of that railroad traces back to the Soo Line's ownership, inherited from the Milwaukee Road.

The CPR is publicly traded on both the Toronto Stock Exchange and the New York Stock Exchange under the ticker CP. Its U.S. headquarters are in Minneapolis.[6] As of January 14, 2022, the largest shareholder of Canadian Pacific stock is TCI Fund Management Limited, a London-based hedge fund that owns 8.38% of the company.[7]

(As of 2022), the railroad is attempting to purchase the Kansas City Southern Railway. If approved, the combined railroad will be the first and only to directly serve Canada, Mexico and the United States.

History

Together with the Canadian Confederation, the creation of the Canadian Pacific Railway was a task originally undertaken as the National Dream by the Conservative government of Prime Minister John A. Macdonald (1st Canadian Ministry).[8] He was helped by Alexander Tilloch Galt, who was the owner of the North Western Coal and Navigation Company. British Columbia, a four-month sea voyage away from the East Coast, had insisted upon a land transport link to the East as a condition for joining Confederation (initially requesting a wagon road).[9]

John A. Macdonald

In 1873, John A. Macdonald and other high-ranking politicians, bribed in the Pacific Scandal, granted federal contracts to Hugh Allan's Canada Pacific Railway Company (which was unrelated to the current company) rather than to David Lewis Macpherson's Inter-Ocean Railway Company which was thought to have connections to the American Northern Pacific Railway Company. Because of this scandal, the Conservative Party was removed from office in 1873. The new Liberal prime minister, Alexander Mackenzie, ordered construction of segments of the railway as a public enterprise under the supervision of the Department of Public Works led by Sandford Fleming. Surveying was carried out during the first years of a number of alternative routes in this virgin territory followed by construction of a telegraph along the lines that had been agreed upon.[10] The Thunder Bay section linking Lake Superior to Winnipeg was commenced in 1875. By 1880, around 1,000 kilometres (700 mi) was nearly complete, mainly across the troublesome Canadian Shield terrain, with trains running on only 500 kilometres (300 mi) of track.[11]

C.P.R. 2-6-0 locomotive no. 2000 and employees

With Macdonald's return to power on 16 October 1878, a more aggressive construction policy was adopted. Macdonald confirmed that Port Moody would be the terminus of the transcontinental railway, and announced that the railway would follow the Fraser and Thompson rivers between Port Moody and Kamloops. In 1879, the federal government floated bonds in London and called for tenders to construct the 206 km (128 mi) section of the railway from Yale, British Columbia, to Savona's Ferry, on Kamloops Lake. The contract was awarded to Andrew Onderdonk, whose men started work on 15 May 1880. After the completion of that section, Onderdonk received contracts to build between Yale and Port Moody, and between Savona's Ferry and Eagle Pass.[12]

On 21 October 1880, a new syndicate, unrelated to Hugh Allan's, signed a contract with the Macdonald government. Fleming was dismissed and replaced with Collingwood Schreiber as chief engineer and general manager of all government railways. They agreed to build the railway in exchange for $25 million (approximately $625 million in modern Canadian dollars) in credit from the Canadian government and a grant of 25 million acres (100,000 km2) of land. The government transferred to the new company those sections of the railway it had constructed under government ownership, on which it had already spent at least $25 million. But its estimates of the cost of the Rocky Mountain section alone was over $60 million.[13] The government also defrayed surveying costs and exempted the railway from property taxes for 20 years. The Montreal-based syndicate officially comprised five men: George Stephen, James J. Hill, Duncan McIntyre, Richard B. Angus and John Stewart Kennedy. Donald A. Smith[14] and Norman Kittson were unofficial silent partners with a significant financial interest. On 15 February 1881, legislation confirming the contract received royal assent, and the Canadian Pacific Railway Company was formally incorporated the next day.[15] Critics claimed that the government gave too large a subsidy for the proposed project but this was to incorporate uncertainties of risk and irreversibility of insurance. The large subsidy also needed to compensate the CPR for not constructing the line in the future, but rather right away even though demand would not cover operational costs.[16]

A beaver was chosen as the railway's logo in honour of Donald Smith, 1st Baron Strathcona and Mount Royal, who had risen from factor to governor of the Hudson's Bay Company over a lengthy career in the beaver fur trade. Smith was a principal financier of the CPR.[14] staking much of his personal wealth to the venture. In 1885, he drove the last spike to complete the transcontinental line.[14]

Building the railway, 1881–1886

Canadian Pacific Railway Crew laying tracks at lower Fraser Valley, 1883

Building the railway took over four years. James J. Hill in 1881 sent Alpheus Beede Stickney to be construction superintendent for the Canadian Pacific Railway. The Canadian Pacific Railway began its westward expansion from Bonfield, Ontario (previously called Callander Station), where the first spike was driven into a sunken railway tie. Bonfield was inducted into Canadian Railway Hall of Fame in 2002 as the CPR first spike location. That was the point where the Canada Central Railway extension ended.[17] The CCR was owned by Duncan McIntyre, who amalgamated it with the CPR, and became one of the handful of officers of the newly formed CPR. The CCR started in Brockville and extended to Pembroke. It then followed a westward route along the Ottawa River passing through places like Cobden, Deux-Rivières and eventually to Mattawa at the confluence of the Mattawa and Ottawa rivers. It then proceeded cross-country towards its final destination of Bonfield. Duncan McIntyre and his contractor James Worthington piloted the CPR expansion. Worthington continued on as the construction superintendent for the CPR past Bonfield. He remained with the CPR for about a year after which he left the company. McIntyre was uncle to John Ferguson who staked out future North Bay and who became the town's wealthiest inhabitant and mayor for four successive terms.[18]

Unidentified engineers of the Canadian Pacific Railway Survey, 1872

It was presumed that the railway would travel through the rich "Fertile Belt" of the North Saskatchewan River Valley and cross the Rocky Mountains via the Yellowhead Pass, a route suggested by Fleming based on a decade of work. However, the CPR quickly discarded this plan in favour of a more southerly route across the arid Palliser's Triangle in Saskatchewan and via Kicking Horse Pass and down the Field Hill to the Rocky Mountain Trench. This route was more direct and closer to the Canada–US border, making it easier for the CPR to keep American railways from encroaching on the Canadian market. However, this route also had several disadvantages.

One was that the CPR would need to find a route through the Selkirk Mountains in British Columbia while, at the time, it was not known whether a route even existed. The job of finding a pass was assigned to a surveyor named Major Albert Bowman Rogers. The CPR promised him a cheque for $5,000 and that the pass would be named in his honour. Rogers became obsessed with finding the pass that would immortalize his name. He discovered the pass in April 1881[19][20] and, true to its word, the CPR named it "Rogers Pass" and gave him the cheque. However, he at first refused to cash it, preferring to frame it, saying he did not do it for the money. He later agreed to cash it with the promise of an engraved watch.[21]

Map from 1890 showing system of land survey and the lines of the Canadian Pacific Railway in Manitoba, Alberta, Assiniboia, and Saskatchewan. First Nations reserves are marked throughout with "I.R." for "Indian Reserve."

Another obstacle was that the proposed route crossed land in Alberta that was controlled by the Blackfoot First Nation. This difficulty was overcome when a missionary priest, Albert Lacombe, persuaded the Blackfoot chief Crowfoot that construction of the railway was inevitable. In return for his assent, Crowfoot was famously rewarded with a lifetime pass to ride the CPR.

A more lasting consequence of the choice of route was that, unlike the one proposed by Fleming, the land surrounding the railway often proved too arid for successful agriculture. The CPR may have placed too much reliance on a report from naturalist John Macoun, who had crossed the prairies at a time of very high rainfall and had reported that the area was fertile.[22]

The greatest disadvantage of the route was in Kicking Horse Pass, at the Alberta-British Columbia border on the continental divide. In the first 6 km (3.7 mi) west of the 1,625 metres (5,331 feet) high summit, the Kicking Horse River drops 350 metres (1,150 feet). The steep drop would force the cash-strapped CPR to build a 7 km (4.3 mi) long stretch of track with a very steep 4​12 percent gradient once it reached the pass in 1884. This was over four times the maximum gradient recommended for railways of this era, and even modern railways rarely exceed a two-percent gradient. However, this route was far more direct than one through the Yellowhead Pass and saved hours for both passengers and freight. This section of track was the CPR's Big Hill. Safety switches were installed at several points, the speed limit for descending trains was set at 10 km per hour (6 mph), and special locomotives were ordered. Despite these measures, several serious runaways still occurred including the first locomotive, which belonged to the contractors, to descend the line. CPR officials insisted that this was a temporary expediency, but this state of affairs would last for 25 years until the completion of the Spiral Tunnels in the early 20th century.[23]

William Cornelius Van Horne

In 1881, construction progressed at a pace too slow for the railway's officials who, in 1882, hired the renowned railway executive William Cornelius Van Horne to oversee construction with the inducement of a generous salary and the intriguing challenge of handling such a difficult railway project. Van Horne stated that he would have 800 km (500 mi) of main line built in 1882. Floods delayed the start of the construction season, but over 672 km (418 mi) of main line, as well as sidings and branch lines, were built that year. The Thunder Bay branch (west from Fort William) was completed in June 1882 by the Department of Railways and Canals and turned over to the company in May 1883, permitting all-Canadian lake and railway traffic from Eastern Canada to Winnipeg for the first time. By the end of 1883, the railway had reached the Rocky Mountains, just eight kilometres (five miles) east of Kicking Horse Pass. The construction seasons of 1884 and 1885 would be spent in the mountains of British Columbia and on the north shore of Lake Superior.

CPR trestle bridge

Many thousands of navvies worked on the railway. Many were European immigrants. In British Columbia, government contractors eventually hired 17,000 workers from China, known as "coolies". A navvy received between $1 and $2.50 per day, but had to pay for his own food, clothing, transport to the job site, mail and medical care. After 2​12 months of hard labour, they could net as little as $16. Chinese labourers in British Columbia made only between 75 cents and $1.25 a day, paid in rice mats, and not including expenses, leaving barely anything to send home. They did the most dangerous construction jobs, such as working with explosives to clear tunnels through rock.[24] The exact number of Chinese workers who died is unknown but historians estimate the number is between 600 and 800. The victims of sickness and accidents were not given proper funerals. Most of the remains were buried into the railway and the families of the Chinese who were killed received no compensation, or even notification of loss of life. Many of the men who survived did not have enough money to return to their families in China, although Chinese labour contractors had promised that as part of their responsibilities.[25] Many spent years in isolated and often poor conditions. Yet the Chinese were hard working and played a key role in building the Western stretch of the railway; even some boys as young as twelve years old served as tea-boys. In 2006, the then-Prime Minister offered an apology for the treatment of Chinese workers, both during and following the construction of the CPR.[26]

By 1883, railway construction was progressing rapidly, but the CPR was in danger of running out of funds. In response, on 31 January 1884, the government passed the Railway Relief Bill, providing a further $22.5 million in loans to the CPR. The bill received royal assent on 6 March 1884.[27]

Donald Smith, later known as Lord Strathcona, drives the last spike of the Canadian Pacific Railway, at Craigellachie, 7 November 1885. Completion of the transcontinental railway was a condition of BC's entry into Confederation.

In March 1885, the North-West Rebellion broke out in the District of Saskatchewan. Van Horne, in Ottawa at the time, suggested to the government that the CPR could transport troops to Qu'Appelle, Assiniboia, in 10 days. Some sections of track were incomplete or had not been used before, but the trip to Winnipeg was made in nine days and the rebellion quickly suppressed. Perhaps because the government was grateful for this service, they subsequently reorganized the CPR's debt and provided a further $5 million loan. This money was desperately needed by the CPR. However, this government loan later became controversial. Even with Van Horne's support with moving troops to Qu'Appelle, the government still delayed in giving its support to CPR. This was due to Macdonald putting pressure on George Stephen for additional benefits. Stephen himself later did admit to spending $1 million between 1881 and 1886 to ensure government support. This money went to buying a £40,000 necklace for Lady MacDonald and numerous other "bonifications" to government members.[28]

Telegram to Prime Minister John A. Macdonald announcing the completion of the Canadian Pacific Railway, 7 November 1885

On 7 November 1885, the last spike was driven at Craigellachie, British Columbia, making good on the original promise. Four days earlier, the last spike of the Lake Superior section was driven in just west of Jackfish, Ontario. While the railway was completed four years after the original 1881 deadline, it was completed more than five years ahead of the new date of 1891 that Macdonald gave in 1881. The successful construction of such a massive project, although troubled by delays and scandal, was considered an impressive feat of engineering and political will for a country with such a small population, limited capital, and difficult terrain. It was by far the longest railway ever constructed at the time. It had taken 12,000 men and 5,000 horses to construct the Lake section alone.[29]

Meanwhile, in Eastern Canada, the CPR had created a network of lines reaching from Quebec City to St. Thomas, Ontario, by 1885 – mainly by buying the Quebec, Montreal, Ottawa & Occidental Railway from the Quebec government and by creating a new railway company, the Ontario and Quebec Railway (O&Q). It also launched a fleet of Great Lakes ships to link its terminals. Through the O&Q, the CPR had effected purchases and long-term leases of several railways, and built a line between Perth, Ontario, and Toronto (completed on 5 May 1884) to connect these acquisitions. The CPR obtained a 999-year lease on the O&Q on 4 January 1884. In 1895, it acquired a minority interest in the Toronto, Hamilton and Buffalo Railway, giving it a link to New York and the Northeast United States.[30]

1886–1900

The system in 1906, soon after the construction of the transcontinental railway

The last spike in the CPR was driven on 7 November 1885, by one of its directors, Donald Smith.[14]

The first transcontinental passenger train departed from Montreal 's Dalhousie Station, located at Berri Street and Notre Dame Street at 8 pm on 28 June 1886, and arrived at Port Moody at noon on 4 July 1886. This train consisted of two baggage cars, a mail car, one second-class coach, two immigrant sleepers, two first-class coaches, two sleeping cars and a diner (several dining cars were used throughout the journey, as they were removed from the train during the night, with another one added the next morning).[31]

First Transcontinental Train arrives in Port Arthur on 30 June 1886

By that time, however, the CPR had decided to move its western terminus from Port Moody to Granville, which was renamed "Vancouver" later that year. The first official train destined for Vancouver arrived on 23 May 1887, although the line had already been in use for three months. The CPR quickly became profitable, and all loans from the Federal government were repaid years ahead of time. In 1888, a branch line was opened between Sudbury and Sault Ste. Marie where the CPR connected with the American railway system and its own steamships. That same year, work was started on a line from London, Ontario, to the Canada–US border at Windsor, Ontario. That line opened on 12 June 1890.[32]

The CPR also leased the New Brunswick Railway in 1891 for 991 years,[33] and built the International Railway of Maine, connecting Montreal with Saint John, New Brunswick, in 1889. The connection with Saint John on the Atlantic coast made the CPR the first truly transcontinental railway company in Canada and permitted trans-Atlantic cargo and passenger services to continue year-round when sea ice in the Gulf of St. Lawrence closed the port of Montreal during the winter months. By 1896, competition with the Great Northern Railway for traffic in southern British Columbia forced the CPR to construct a second line across the province, south of the original line. Van Horne, now president of the CPR, asked for government aid, and the government agreed to provide around $3.6 million to construct a railway from Lethbridge, Alberta, through Crowsnest Pass to the south shore of Kootenay Lake, in exchange for the CPR agreeing to reduce freight rates in perpetuity for key commodities shipped in Western Canada.[citation needed]

The controversial Crowsnest Pass Agreement effectively locked the eastbound rate on grain products and westbound rates on certain "settlers' effects" at the 1897 level. Although temporarily suspended during the First World War, it was not until 1983 that the "Crow Rate" was permanently replaced by the Western Grain Transportation Act which allowed for the gradual increase of grain shipping prices. The Crowsnest Pass line opened on 18 June 1898, and followed a complicated route through the maze of valleys and passes in southern British Columbia, rejoining the original mainline at Hope after crossing the Cascade Mountains via Coquihalla Pass.[34]

The Southern Mainline, generally known as the Kettle Valley Railway in British Columbia, was built in response to the booming mining and smelting economy in southern British Columbia, and the tendency of the local geography to encourage and enable easier access from neighbouring US states than from Vancouver or the rest of Canada, which was viewed to be as much of a threat to national security as it was to the province's control of its own resources. The local passenger service was re-routed to this new southerly line, which connected numerous emergent small cities across the region. Independent railways and subsidiaries that were eventually merged into the CPR in connection with this route were the Shuswap and Okanagan Railway, the Kaslo and Slocan Railway, the Columbia and Kootenay Railway, the Columbia and Western Railway and various others.[33]

CPR and the settlement of western Canada

One of the CPR's land offerings, 1883

The CPR had built a railway that operated mostly in the wilderness. The usefulness of the prairies was questionable in the minds of many. The thinking prevailed that the prairies had great potential. Under the initial contract with the Canadian government to build the railway, the CPR was granted 25 million acres (100,000 km2). Proving already to be a very resourceful organization, Canadian Pacific began an intense campaign to bring immigrants to Canada. Canadian Pacific agents operated in many overseas locations. Immigrants were often sold a package that included passage on a CP ship, travel on a CP train and land sold by the CP railway. Land was priced at $2.50 an acre and up but required cultivation.[35] To transport immigrants, Canadian Pacific developed a fleet of over a thousand Colonist cars, low-budget sleeper cars designed to transport immigrant families from eastern Canadian seaports to the west.[36]

1901–1928

CPR advertisement highlighting "Free Farms for the Million" in western Canada, circa 1893

During the first decade of the 20th century, the CPR continued to build more lines. In 1908, the CPR opened a line connecting Toronto with Sudbury. Previously, westbound traffic originating in southern Ontario took a circuitous route through eastern Ontario. Several operational improvements were also made to the railway in Western Canada. In 1909 the CPR completed two significant engineering accomplishments. The most significant was the replacement of the Big Hill, which had become a major bottleneck in the CPR's main line, with the Spiral Tunnels, reducing the grade to 2.2 percent from 4.5 percent. The Spiral Tunnels opened in August. In April 1908, the CPR started work to replace the Old Calgary-Edmonton Rail Bridge across the Red Deer River with a new standard steel bridge that was completed by March 1909.[37]

Lethbridge Viaduct

On 3 November 1909, the Lethbridge Viaduct over the Oldman River valley at Lethbridge, Alberta, was opened. It is 1,624 metres (5,328 feet) long and, at its maximum, 96 metres (315 feet) high, making it one of the longest railway bridges in Canada. In 1916, the CPR replaced its line through Rogers Pass, which was prone to avalanches (the most serious of which killed 62 men in 1910) with the Connaught Tunnel, an eight-kilometre-long (5-mile) tunnel under Mount Macdonald[38] that was, at the time of its opening, the longest railway tunnel in the Western Hemisphere.[39][40]

C.P.R. railway locomotive 2860

On 21 January 1910, a passenger train derailed on the CPR line at the Spanish River bridge at Nairn, Ontario (near Sudbury), killing at least 43.[41][42]

The CPR acquired several smaller railways via long-term leases in 1912. On 3 January 1912, the CPR acquired the Dominion Atlantic Railway, a railway that ran in western Nova Scotia. This acquisition gave the CPR a connection to Halifax, a significant port on the Atlantic Ocean. The Dominion Atlantic was isolated from the rest of the CPR network and used the CNR to facilitate interchange; the DAR also operated ferry services across the Bay of Fundy for passengers and cargo (but not rail cars) from the port of Digby, Nova Scotia, to the CPR at Saint John, New Brunswick. DAR steamships also provided connections for passengers and cargo between Yarmouth, Boston and New York City . On 1 July 1912, the CPR acquired the Esquimalt and Nanaimo Railway, a railway on Vancouver Island that connected to the CPR using a railcar ferry. The CPR acquired the Quebec Central Railway on 14 December 1912.[33]

During the late 19th century, the railway undertook an ambitious programme of hotel construction, building Glacier House in Glacier National Park, Mount Stephen House at Field, British Columbia, the Château Frontenac in Quebec City and the Banff Springs Hotel. By then, the CPR had competition from three other transcontinental lines, all of them money-losers. In 1919, these lines were consolidated, along with the track of the old Intercolonial Railway and its spurs, into the government-owned Canadian National Railways. The CPR suffered its greatest loss of life when one of its steamships, the Empress of Ireland, sank after a collision with the Norway collier SS Storstad. On 29 May 1914, the Empress (operated by the CPR's Canadian Pacific Steamship Company) went down in the St. Lawrence River with the loss of 1,024 lives, of which 840 were passengers.[43]

First World War

During the First World War CPR put the entire resources of the "world's greatest travel system" at the disposal of the British Empire, not only trains and tracks, but also its ships, shops, hotels, telegraphs and, above all, its people. Aiding the war effort meant transporting and billeting troops; building and supplying arms and munitions; arming, lending and selling ships. Fifty-two CPR ships were pressed into service during World War I, carrying more than a million troops and passengers and four million tons of cargo. Twenty seven survived and returned to CPR. CPR also helped the war effort with money and jobs. CPR made loans and guarantees to the Allies of some $100 million. As a lasting tribute, CPR commissioned three statues and 23 memorial tablets to commemorate the efforts of those who fought and those who died in the war.[44] After the war, the Federal government created Canadian National Railways (CNR, later CN) out of several bankrupt railways that fell into government hands during and after the war. CNR would become the main competitor to the CPR in Canada. In 1923, Henry Worth Thornton replaced David Blyth Hanna becoming the second president of the CNR, and his competition spurred Edward Wentworth Beatty, the first Canadian-born president of the CPR, to action.[45] During this time the railway land grants were formalized.[46]

Great Depression and the Second World War, 1929–1945

Strikers from unemployment relief camps climbing on boxcars as part of the On-to-Ottawa Trek, 1935

The Great Depression, which lasted from 1929 until 1939, hit many companies heavily. While the CPR was affected, it was not affected to the extent of its rival CNR because it, unlike the CNR, was debt-free. The CPR scaled back on some of its passenger and freight services, and stopped issuing dividends to its shareholders after 1932. Hard times led to the creation of new political parties such as the Social Credit movement and the Cooperative Commonwealth Federation, as well as popular protest in the form of the On-to-Ottawa Trek.[47]

One highlight of the late 1930s, both for the railway and for Canada, was the visit of King George VI and Queen Elizabeth during their 1939 royal tour of Canada, the first time that the reigning monarch had visited the country. The CPR and the CNR shared the honours of pulling the royal train across the country, with the CPR undertaking the westbound journey from Quebec City to Vancouver. Later that year, the Second World War began. As it had done in World War I, the CPR devoted much of its resources to the war effort. It retooled its Angus Shops in Montreal to produce Valentine tanks and other armoured vehicles, and transported troops and resources across the country. As well, 22 of the CPR's ships went to war, 12 of which were sunk.[48]

1946–1978

The Multimark logo was used from 1968 to 1987, when it fell out of favour. It was sometimes referred to as the 'Pac-Man' logo, after the popular 1980s video game of the same name.
CPR train step stool (Calgary station) c. 1950

After the Second World War, the transportation industry in Canada changed. Where railways had previously provided almost universal freight and passenger services, cars, trucks and airplanes started to take traffic away from railways. This naturally helped the CPR's air and trucking operations, and the railway's freight operations continued to thrive hauling resource traffic and bulk commodities. However, passenger trains quickly became unprofitable. During the 1950s, the railway introduced new innovations in passenger service. In 1955, it introduced The Canadian, a new luxury transcontinental train. However, in the 1960s, the company started to pull out of passenger services, ending services on many of its branch lines. It also discontinued its secondary transcontinental train The Dominion in 1966, and in 1970, unsuccessfully applied to discontinue The Canadian. For the next eight years, it continued to apply to discontinue the service, and service on The Canadian declined markedly. On 29 October 1978, CP Rail transferred its passenger services to Via Rail, a new federal Crown corporation that is responsible for managing all intercity passenger service formerly handled by both CP Rail and CN. Via eventually took almost all of its passenger trains, including The Canadian, off CP's lines.[49]

In 1968, as part of a corporate reorganization, each of the major operations, including its rail operations, were organized as separate subsidiaries. The name of the railway was changed to CP Rail, and the parent company changed its name to Canadian Pacific Limited in 1971. Its air, express, telecommunications, hotel and real estate holdings were spun off, and ownership of all of the companies transferred to Canadian Pacific Investments. The slogan was: "TO THE FOUR CORNERS OF THE WORLD" The company discarded its beaver logo, adopting the new Multimark (which, when mirrored by an adjacent "multi-mark" creates a diamond appearance on a globe) that was used – with a different colour background – for each of its operations.[50]

1979–2001

The 1979 Mississauga train derailment

On 10 November 1979, a derailment of a hazardous materials train in Mississauga, Ontario, led to the evacuation of 200,000 people; there were no fatalities.[51][52] Hazel McCallion threatened to sue Canadian Pacific for the derailment. Part of the compromise was to accept GO Transit commuter rail service along the Galt Subdivision corridor up to Milton, Ontario. Limited trains ran along the Milton line on weekdays only. Expansions to Cambridge, Ontario may be coming in the future.

In 1984, CP Rail commenced construction of the Mount Macdonald Tunnel to augment the Connaught Tunnel under the Selkirk Mountains. The first revenue train passed through the tunnel in 1988. At 14.7 km (nine miles), it is the longest tunnel in the Americas. During the 1980s, the Soo Line Railroad, in which CP Rail still owned a controlling interest, underwent several changes. It acquired the Minneapolis, Northfield and Southern Railway in 1982. Then on 21 February 1985, the Soo Line obtained a controlling interest in the bankrupt Milwaukee Road, merging it into its system on 1 January 1986. Also in 1980, Canadian Pacific bought out the controlling interests of the Toronto, Hamilton and Buffalo Railway (TH&B) from Conrail and molded it into the Canadian Pacific System, dissolving the TH&B's name from the books in 1985. In 1987, most of CPR's trackage in the Great Lakes region, including much of the original Soo Line, were spun off into a new railway, the Wisconsin Central, which was subsequently purchased by CN. Influenced by the Canada-U.S. Free Trade Agreement of 1989, which liberalized trade between the two nations, the CPR's expansion continued during the early 1990s: CP Rail gained full control of the Soo Line in 1990, and bought the Delaware and Hudson Railway in 1991. These two acquisitions gave CP Rail routes to the major American cities of Chicago (via the Soo Line and Milwaukee Road as part of its historically logical route) and New York City (via the D&H).[53]

During the 1990s, both CP Rail and CN attempted unsuccessfully to buy out the eastern assets of the other, so as to permit further rationalization. In 1996, CP Rail moved its head office from Windsor Station in Montreal to Gulf Canada Square in Calgary and changed its name back to Canadian Pacific Railway.[54]

A new subsidiary company, the St. Lawrence and Hudson Railway, was created to operate its money-losing lines in eastern North America, covering Quebec, Southern and Eastern Ontario, trackage rights to Chicago, Illinois, (on Norfolk Southern lines from Detroit) as well as the Delaware and Hudson Railway in the northeastern United States. However, the new subsidiary, threatened with being sold off and free to innovate, quickly spun off money-losing track to short lines, instituted scheduled freight service, and produced an unexpected turn-around in profitability. On 1 January 2001 the StL&H was formally amalgamated with the CP Rail system.[55]

2001 to present

In 2001, the CPR's parent company, Canadian Pacific Limited, spun off its five subsidiaries, including the CPR, into independent companies. Most of the company's non-railway businesses at the time of the split were operated by a separate subsidiary called Canadian Pacific Limited. Canadian Pacific Railway formally (but, not legally) shortened its name to Canadian Pacific in early 2007, dropping the word "railway" in order to reflect more operational flexibility. Shortly after the name revision, Canadian Pacific announced that it had committed to becoming a major sponsor and logistics provider to the 2010 Olympic Winter Games in Vancouver .[56]

On 4 September 2007, CPR announced it was acquiring the Dakota, Minnesota and Eastern Railroad from London-based Electra Private Equity.[57] The transaction was an "end-to-end" consolidation and gave CPR access to United States shippers of agricultural products, ethanol and coal. CPR stated its intention to use this purchase to gain access to the rich coalfields of Wyoming's Powder River Basin. The purchase price was US$1.48 billion with future payments of over US$1 billion contingent on commencement of construction on the smaller railway's Powder River extension and specified volumes of coal shipments from the Powder River Basin. The transaction was subject to approval of the U.S. Surface Transportation Board (STB), which was expected to take about a year. On 4 October 2007, CPR announced that it had completed financial transactions required for the acquisition, placing the DM&E and IC&E in a voting trust with Richard Hamlin appointed as trustee.[58] The merger was completed as of 31 October 2008.[59]

In 2010, four repainted Canadian Pacific AC4400CWs were used in the filming of the movie Unstoppable.

Canadian Pacific A1e class 4-4-0 No. 29 on static display in front of the railway's headquarters in Calgary, Alberta, 2012

On 28 October 2011, in a Schedule 13D filing, the U.S. hedge fund Pershing Square Capital Management (PSCM) indicated it owned 12.2 percent of Canadian Pacific.[60][61] PSCM began acquiring Canadian Pacific shares in 2011. The stake eventually increased to 14.2 percent, making PSCM the railway's largest shareholder. At a meeting with the company that month, Pershing's head Bill Ackman proposed replacing Fred Green as CP's chief executive. Just hours before the railway's annual shareholder meeting on Thursday, 17 May 2012, Green and five other board members, including chairman John Cleghorn, resigned. The seven nominees, including Ackman and his partner, Paul Hilal, were then elected. The reconstituted board, having named Stephen Tobias (former vice president and chief operating officer of Norfolk Southern Railroad) as interim CEO, initiated a search for a new CEO, eventually settling on E. Hunter Harrison, former president of Canadian National Railway, on 29 June 2012.[62][63]

Canadian Pacific Railway Ltd. trains resumed regular operations on 1 June 2012 after a nine-day strike by some 4,800 locomotive engineers, conductors and traffic controllers who walked off the job on 23 May, stalling Canadian freight traffic and costing the economy an estimated CA$80 million (US$77 million). The strike ended with a government back-to-work bill forcing both sides to come to a binding agreement.[64][65]

On 6 July 2013, a unit train of crude oil which CP had subcontracted to short-line operator Montreal, Maine and Atlantic Railway derailed in Lac-Mégantic, killing 47.[66] On 14 August 2013, the Quebec government added the CPR, along with lessor World Fuel Services (WFS), to the list of corporate entities from which it seeks reimbursement for the environmental cleanup of the Lac-Mégantic derailment.[66] On 15 July, the press reported that CP would appeal the legal order. Railway spokesman Ed Greenberg stated "Canadian Pacific has reviewed the notice. As a matter of fact, in law, CP is not responsible for this cleanup."[67] In February 2014, Harrison called for immediate action to phase-out DOT-111 tank cars, known to be more dangerous in cases of derailment.[68]

On 12 October 2014 it was reported that Canadian Pacific had tried to enter into a merger with American railway CSX, but was unsuccessful.[69]

In 2015–16 Canadian Pacific sought to merge with American railway Norfolk Southern.[70] and wanted to have a shareholder vote on it.[71][72][73][74] Canadian Pacific created a website to persuade people that the Canadian Pacific/Norfolk Southern merger would benefit the rail industry.[75][76][77] However, this proposed merger would come under scrutiny by the U.S. Department of Justice over antitrust concerns created by the proposed merger. Canadian Pacific filed a complaint against the U.S. DOJ and dropped their proposed proxy fight in the proposed merger with Norfolk Southern.[78][79] The proposed merger was also opposed by rival freight company, the United Parcel Service (UPS), who spoke out about the rail merger and said they were against the Canadian Pacific/Norfolk Southern merger.[80] CP ultimately terminated its efforts to merge on 11 April 2016.[81]

On 18 January 2017 it was announced that Hunter Harrison was retiring from CP and that Keith Creel would become president and chief executive officer of the company effective 31 January 2017.[82]

On 4 February 2019, a loaded grain train ran away from the siding at Partridge just above the Upper Spiral Tunnel in Kicking Horse Pass. The 112-car grain train with three locomotives derailed into the Kicking Horse River just after the Trans Canada Highway overpass. The three crew members on the lead locomotive were killed.[83] The Canadian Pacific Police Service (CPPS) investigated the fatal derailment. It later came to light that, although Creel said that the RCMP "retain jurisdiction" over the investigation, the RCMP wrote that "it never had jurisdiction because the crash happened on CP property".[84] On 26 January 2020, Canadian current affairs program The Fifth Estate broadcast an episode on the derailment, and the next day the Canadian Transportation Safety Board (TSB) called for the RCMP to investigate as lead investigator Don Crawford said, "There is enough to suspect there's negligence here and it needs to be investigated by the proper authority".[85]

On 4 February 2020, the TSB demoted its lead investigator in the crash probe after his superiors decided these comments were "completely inappropriate". The TSB stated that it "does not share the view of the lead safety investigator". The CPPS say they did a thorough investigation into the actions of the crew, which is now closed and resulted in no charges, while the Alberta Federation of Labour and the Teamsters Canada Rail Conference called for an independent police probe.[86]

On 20 November 2019, it was announced that Canadian Pacific would purchase the Central Maine and Quebec Railway from Fortress Transportation and Infrastructure Investors.[87] The line had had a series of different owners since being spun off of the Canadian Pacific in 1995. The first operator was the Canadian American Railroad a division of Iron Road Railways. In 2002 the Montreal, Maine & Atlantic took over operations after CDAC declared bankruptcy. The Central, Maine and Quebec Railway started operations in 2014 after the MMA declared bankruptcy due to the Lac-Mégantic derailment. On this new acquisition, CP CEO Keith Creel remarked that this gives CP a true coast-to-coast network across Canada and an increased presence in New England. On June 4, 2020; Canadian Pacific bought the Central Maine and Quebec.

In March 2021, the CP offered US$29 billion to purchase the Kansas City Southern Railway, which would allow the CP to own rail lines across the entire North American continent. Kansas City Southern CEO Patrick Ottensmeyer stated that the United States–Mexico–Canada Agreement signed a year earlier created a unique opportunity amid the recovery from the COVID-19 pandemic.[88][89][90] On May 21, Canadian National Railway surpassed CP's bid with Kansas City Southern engaging with CN.[91] However, on August 31, the US Surface Transportation Board (STB) denied a voting trust between CN and KCS.[92] With the decision by the STB, KCS re-engaged with CP on CP's original offer.[93][94]

On 8 December 2021, Canadian Pacific shareholders voted to approve the railway's proposed merger with Kansas City Southern. In the same vote shareholders also approved a special resolution to change CP's corporate name to Canadian Pacific Kansas City Limited.[95] Two days later on 10 December 2021, Kansas City Southern stockholders also gave their support for the planned combination with Canadian Pacific.[96] On 14 December 2021, Kansas City Southern's sale to Canadian Pacific was officially complete, allowing the KCS shares to be placed into a voting trust while the deal is reviewed by federal regulators.[97]

Freight trains

CP EMD SD90MAC locomotive in Thunder Bay, Ontario
GE ES44AC CP 8863 in Campbellville, Ontario
Soo Line 6022, an EMD SD60, pulls a train through Wisconsin Dells, WI, 20 June 2004.

Over half of CP's freight traffic is in grain (24% of 2016 freight revenue[98]), intermodal freight (22%), and coal (10%) and the vast majority of its profits are made in western Canada. A major shift in trade from the Atlantic to the Pacific has caused serious drops in CPR's wheat shipments through Thunder Bay. It also ships chemicals and plastics (12% of 2016 revenue), automotive parts and assembled automobiles (6%), potash (6%), sulphur and other fertilizers (5%), forest products (5%), and various other products (11%). The busiest part of its railway network is along its main line between Calgary and Vancouver. Since 1970, coal has become a major commodity hauled by CPR. Coal is shipped in unit trains from coal mines in the mountains, most notably Sparwood, British Columbia, to terminals at Roberts Bank and North Vancouver, from where it is then shipped to Japan.[citation needed]

Grain is hauled by the CPR from the prairies to ports at Thunder Bay (the former cities of Fort William and Port Arthur), Quebec City and Vancouver, where it is then shipped overseas. The traditional winter export port was Saint John, New Brunswick, when ice closed the St. Lawrence River. Grain has always been a significant commodity hauled by the CPR; between 1905 and 1909, the CPR double-tracked its section of track between Fort William, Ontario (part of present-day Thunder Bay) and Winnipeg to facilitate grain shipments. For several decades this was the only long stretch of double-track mainline outside of urban areas on the CPR. Today, though the Thunder Bay-Winnipeg section is now single tracked, the CPR still has two long distance double track lines serving rural areas, including a 121-kilometre (75 mi) stretch between Kent, British Columbia, and Vancouver which follows the Fraser River into the Coast Mountains, as well as the Canadian Pacific Winchester Sub, a 160-kilometre (100 mi) stretch of double track mainline which runs from Smiths Falls, Ontario, through downtown Montreal which runs through many rural farming communities. However, CPR is in the midst of partially dismantling the stretch of double track mainline on the Winchester Sub. There are also various long stretches of double track between Golden and Kamloops, British Columbia, and portions of the original Winnipeg-Thunder Bay double track (such as 30 kilometres (20 mi) through Kenora and Keewatin, Ontario) are still double track.[citation needed]

Passenger trains

The train was the primary mode of long-distance transport in Canada until the 1960s. Among the many types of people who rode CPR trains were new immigrants heading for the prairies, military troops (especially during the two world wars) and upper class tourists. It also custom-built many of its passenger cars at its CPR Angus Shops to be able to meet the demands of the upper class.

An Angus Shops building converted into an SAQ liquor store

The CPR also had a line of Great Lakes ships integrated into its transcontinental service. From 1885 until 1912, these ships linked Owen Sound on Georgian Bay to Fort William. Following a major fire in December 1911 that destroyed the grain elevator, operations were relocated to a new, larger port created by the CPR at Port McNicoll opening in May 1912. Five ships allowed daily service, and included the S.S. Assiniboia and S.S. Keewatin built in 1908 which remained in use until the end of service. Travellers went by train from Toronto to that Georgian Bay port, then travelled by ship to link with another train at the Lakehead. After World War II, the trains and ships carried automobiles as well as passengers. This service featured what was to become the last boat train in North America. The Steam Boat was a fast, direct connecting train between Toronto and Port McNicoll. The passenger service was discontinued at the end of season in 1965 with one ship, the Keewatin, carrying on in freight service for two more years. It later became a marine museum at Douglas, Michigan, in the United States, before returning to its original homeport of Port McNicoll, Canada in 2013.[99]

After the Second World War, passenger traffic declined as automobiles and airplanes became more common, but the CPR continued to innovate in an attempt to keep passenger numbers up. Beginning 9 November 1953, the CPR introduced Budd Rail Diesel Cars (RDCs) on many of its lines. Officially called "Dayliners" by the CPR, they were always referred to as Budd Cars by employees. Greatly reduced travel times and reduced costs resulted, which saved service on many lines for a number of years. The CPR went on to acquire the second largest fleet of RDCs totalling 52 cars. Only the Boston and Maine Railroad had more. This CPR fleet also included the rare model RDC-4 (which consisted of a mail section at one end and a baggage section at the other end with no formal passenger section). On 24 April 1955, the CPR introduced a new luxury transcontinental passenger train, The Canadian. The train provided service between Vancouver and Toronto or Montreal (east of Sudbury; the train was in two sections). The train, which operated on an expedited schedule, was pulled by diesel locomotives, and used new, streamlined, stainless steel rolling stock.[100] This service was initially heavily promoted by the company and many images of the train, especially as it traversed the Canadian Rockies, were captured by CPR's official photographer Nicholas Morant. Featured in numerous advertising promotions worldwide, several such images have gained iconic status.

Starting in the 1960s, however, the railway started to discontinue much of its passenger service, particularly on its branch lines. For example, passenger service ended on its line through southern British Columbia and Crowsnest Pass in January 1964, and on its Quebec Central in April 1967, and the transcontinental train The Dominion was dropped in January 1966. On 29 October 1978, CP Rail transferred its passenger services to Via Rail, a new federal Crown corporation that was now responsible for intercity passenger services in Canada. Canadian Prime Minister Brian Mulroney presided over major cuts in Via Rail service on 15 January 1990. This ended service by The Canadian over CPR rails, and the train was rerouted on the former Super Continental route via Canadian National without a change of name. Where both trains had been daily prior to the 15 January 1990 cuts, the surviving Canadian was only a three-times-weekly operation. In October 2012, The Canadian was reduced to twice-weekly for the six-month off-season period, and currently operates three-times-weekly for only six months a year. In addition to inter-city passenger services, the CPR also provided commuter rail services in Montreal. CP Rail introduced Canada's first bi-level passenger cars here in 1970. On 1 October 1982, the Montreal Urban Community Transit Commission (STCUM) assumed responsibility for the commuter services previously provided by CP Rail. It continues under the Metropolitan Transportation Agency (AMT).[citation needed]

West Coast Express at Waterfront station in Vancouver

Canadian Pacific Railway currently operates two commuter services under contract. GO Transit contracts CPR to operate six return trips between Milton and central Toronto in Ontario. In Montreal, 59 daily commuter trains run on CPR lines from Lucien-L'Allier Station to Candiac, Hudson and Blainville–Saint-Jérôme on behalf of the AMT. CP no longer operates Vancouver's West Coast Express on behalf of TransLink, a regional transit authority. Bombardier Transportation assumed control of train operations on 5 May 2014.[101] Although CP Rail no longer owns the track nor operates the commuter trains, it handles dispatching of Metra trains on the Milwaukee District/North and Milwaukee District/West Lines in Chicago, on which the CP also provides freight service via trackage rights.

Sleeping, Dining and Parlour Car Department

Sleeping cars were operated by a separate department of the railway that included the dining and parlour cars and aptly named as the Sleeping, Dining and Parlour Car Department. The CPR decided from the very beginning that it would operate its own sleeping cars, unlike railways in the United States that depended upon independent companies that specialized in providing cars and porters, including building the cars themselves. Pullman was long a famous name in this regard; its Pullman porters were legendary. Other early companies included the Wagner Palace Car Company. Bigger-sized berths and more comfortable surroundings were built by order of the CPR's General Manager, William Van Horne, who was a large man himself. Providing and operating their own cars allowed better control of the service provided as well as keeping all of the revenue received, although dining-car services were never profitable. But railway managers realized that those who could afford to travel great distances expected such facilities, and their favourable opinion would bode well to attracting others to Canada and the CPR's trains.[102]

Express

W. C. Van Horne decided from the very beginning that the CPR would retain as much revenue from its various operations as it could. This translated into keeping express, telegraph, sleeping car and other lines of business for themselves, creating separate departments or companies as necessary. This was necessary as the fledgling railway would need all the income it could get, and in addition, he saw some of these ancillary operations such as express and telegraph as being quite profitable. Others such as sleeping and dining cars were kept in order to provide better control over the quality of service being provided to passengers. Hotels were likewise crucial to the CPR's growth by attracting travellers.[citation needed]

Dominion Express Company was formed independently in 1873 before the CPR itself, although train service did not begin until the summer of 1882 at which time it operated over some 500 kilometres (300 mi) of track from Rat Portage (Kenora) Ontario west to Winnipeg, Manitoba. It was soon absorbed into the CPR and expanded everywhere the CPR went. It was renamed Canadian Express Company on 1 September 1926, and the headquarters moved from Winnipeg, to Toronto. It was operated as a separate company with the railway charging them to haul express cars on trains. Express was handled in separate cars, some with employees on board, on the headend of passenger trains to provide a fast scheduled service for which higher rates could be charged than for LCL (Less than Carload Lot), small shipments of freight which were subject to delay. Aside from all sorts of small shipments for all kinds of businesses such products as cream, butter, poultry and eggs were handled along with fresh flowers, fish and other sea foods some handled in separate refrigerated cars. Horses and livestock along with birds and small animals including prize cattle for exhibition were carried often in special horse cars that had facilities for grooms to ride with their animals.[citation needed]

Automobiles for individuals were also handled by express in closed boxcars. Gold and silver bullion as well as cash were carried in large amounts between the mint and banks and Express messengers were armed for security. Small business money shipments and valuables such as jewellery were routinely handled in small packets. Money orders and travellers' cheques were an important part of the express company's business and were used worldwide in the years before credit cards. Canadian Express Cartage Department was formed in March 1937 to handle pickup and delivery of most express shipments including less-than-carload freight. Their trucks were painted Killarney (dark) green while regular express company vehicles were painted bright red. Express routes using highway trucks beginning in November 1945 in southern Ontario and Alberta co-ordinated railway and highway service expanded service to better serve smaller locations especially on branchlines. Trucking operations would go on to expand across Canada making it an important transport provider for small shipments. Deregulation in the 1980s, however, changed everything and trucking services were ended [when?] after many attempts to change with the times.[citation needed]

Special trains

Silk trains

Between the 1890s and 1933, the CPR transported raw silk from Vancouver, where it had been shipped from the Orient, to silk mills in New York and New Jersey. A silk train could carry several million dollars' worth of silk, so they had their own armed guards. To avoid train robberies and so minimize insurance costs, they travelled quickly and stopped only to change locomotives and crews, which was often done in under five minutes. The silk trains had superior rights over all other trains; even passenger trains (including the Royal Train of 1939) would be put in sidings to make the silk trains' trip faster. At the end of World War II, the invention of nylon made silk less valuable, so the silk trains died out.[103]

Funeral trains

Funeral train of Prime Minister Sir John A. Macdonald

Funeral trains would carry the remains of important people, such as prime ministers. As the train would pass, mourners would be at certain spots to show respect. Two of the CPR's funeral trains are particularly well-known. On 10 June 1891, the funeral train of Prime Minister Sir John A. Macdonald ran from Ottawa to Kingston, Ontario. The train consisted of five heavily draped passenger cars and was pulled by 4-4-0 No. 283. On 14 September 1915, the funeral train of former CPR president Sir William Cornelius Van Horne ran from Montreal to Joliet, Illinois, pulled by 4-6-2 No. 2213.[104]

Royal trains

King George VI and Queen Elizabeth at Hope, British Columbia

The CPR ran a number of trains that transported members of the Canadian royal family when they toured the country, taking them through Canada's scenery, forests, and small towns, and enabling people to see and greet them. Their trains were elegantly decorated; some had amenities such as a post office and barber shop. The CPR's most notable royal train was in 1939, when the CPR and the CNR had the honour of carrying King George VI and Queen Elizabeth during their coast-to-coast-and-back tour of Canada; one company took the royal couple from Quebec City to Vancouver and the other company took them on the return journey to Halifax. This was the first tour of Canada by its reigning monarch. The steam locomotives used to pull the train included CPR 2850, a Hudson (4-6-4) built by Montreal Locomotive Works in 1938, CNR 6400, a U-4-a Northern (4-8-4) and CNR 6028 a U-1-b Mountain (4-8-2) type. They were specially painted royal blue, with the exception of CNR 6028 which was not painted, with silver trim as was the entire train. The locomotives ran 5,189 km (3,224 mi) across Canada, through 25 changes of crew, without engine failure. The King, somewhat of a railbuff, rode in the cab when possible. After the tour, King George gave the CPR permission to use the term "Royal Hudson" for the CPR locomotives and to display Royal Crowns on their running boards. This applied only to the semi-streamlined locomotives (2820–2864), not the "standard" Hudsons (2800–2819).[105]

Better Farming Train

CPR provided the rolling stock for the Better Farming Train which toured rural Saskatchewan between 1914 and 1922 to promote the latest information on agricultural research. It was staffed by the University of Saskatchewan and operating expenses were covered by the Department of Agriculture.[106]

School cars

Between 1927 and the early 1950s, the CPR ran a school car to reach children who lived in Northern Ontario, far from schools. A teacher would travel in a specially designed car to remote areas and would stay to teach in one area for two to three days, then leave for another area. Each car had a blackboard and a few sets of chairs and desks. They also contained miniature libraries and accommodation for the teacher.[107]

Silver Streak

Major shooting for the 1976 film Silver Streak, a fictional comedy tale of a murder-ridden train trip from Los Angeles to Chicago, was done on the CPR, mainly in the Alberta area with station footage at Toronto's Union Station. The train set was so lightly disguised as the fictional "AMRoad" that the locomotives and cars still carried their original names and numbers, along with the easily identifiable CP Rail red-striped paint scheme. Most of the cars are still in revenue service on Via Rail Canada; the lead locomotive (CP 4070) and the second unit (CP 4067) were sold to Via Rail and CTCUM respectively.[108]

Holiday Train

Holiday Train in Montreal, November 2009

Starting in 1999, CP runs a Holiday Train along its main line during the months of November and December. The Holiday Train celebrates the holiday season and collects donations for community food banks and hunger issues.[109][110] The Holiday Train also provides publicity for CP and a few of its customers. Each train has a box car stage for entertainers who are travelling along with the train.[111]

The train is a freight train, but also pulls vintage passenger cars which are used as lodging/transportation for the crew and entertainers. Only entertainers and CP employees are allowed to board the train aside from a coach car that takes employees and their families from one stop to the next. All donations collected in a community remain in that community for distribution.[112]

There are two Holiday Trains that cover 150 stops in Canada and the United States Northeast and Midwest.[113] Each train is roughly 1,000 feet (300 m) in length with brightly decorated railway cars, including a modified box car that has been turned into a travelling stage for performers. They are each decorated with hundred of thousands of LED Christmas lights. In 2013 to celebrate the program's 15th year, three signature events were held in Hamilton, Ontario, Calgary, Alberta, and Cottage Grove, Minnesota, to further raise awareness for hunger issues.[114]

A crowd watches entertainers perform out of the CP Holiday Train

The trains feature different entertainers each year; in 2016, one train featured Dallas Smith and the Odds, while the other featured Colin James and Kelly Prescott.[115] After its 20th anniversary tour in 2018, which hosted Terri Clark, Sam Roberts Band, The Trews and Willy Porter, the tour reported to have raised more than CA$15.8 million and collected more than 4.5 million pounds (2,000 t) of food since 1999.[116]

Royal Canadian Pacific

On 7 June 2000, the CPR inaugurated the Royal Canadian Pacific, a luxury excursion service that operates between the months of June and September. It operates along a 1,050 km (650 mi) route from Calgary, through the Columbia Valley in British Columbia, and returning to Calgary via Crowsnest Pass. The trip takes six days and five nights. The train consists of up to eight luxury passenger cars built between 1916 and 1931 and is powered by first-generation diesel locomotives.

Steam train

Canadian Pacific 2816 Empress at Sturtevant, Wisconsin, 1 September 2007

In 1998, the CPR repatriated one of its former passenger steam locomotives that had been on static display in the United States following its sale in January 1964, long after the close of the steam era. CPR Hudson 2816 was re-designated Empress 2816 following a 30-month restoration that cost in excess of $1 million. It was subsequently returned to service to promote public relations. It has operated across much of the CPR system, including lines in the U.S. and been used for various charitable purposes; 100% of the money raised goes to the nationwide charity Breakfast for Learning — the CPR bears all of the expenses associated with the operation of the train. 2816 is the subject of Rocky Mountain Express, a 2011 IMAX film which follows the locomotive on an eastbound journey beginning in Vancouver, and which tells the story of the building of the CPR. 2816 has been stored indefinitely since 2012 after CEO E. Hunter Harrison discontinued the steam program.[117]

The locomotive was fired up on November 13, 2020, for a steam test and moved around the Ogden campus yard. At the time, CP only had plans to utilize the locomotive for a special Holiday Train at Home broadcast,[118][119] after which it was put in storage. However, in mid 2021, CEO Keith Creel announced intentions to bring 2816 back to full operational status, for a tour from their Calgary headquarters to Mexico City, if the merger with Kansas City Southern Railway is approved by the Surface Transportation Board in the United States. Work on the needed overhaul began in earnest in late 2021 for a planned date in 2023.[120]

Spirit Train

In 2008, Canadian Pacific partnered with the 2010 Olympic and Paralympic Winter Games to present a "Spirit Train" tour that featured Olympic-themed events at various stops. Colin James was a headline entertainer. Several stops were met by protesters who argued that the games were slated to take place on stolen indigenous land.[121][122][123][124]

CP Canada 150 Train

In 2017, CP ran the CP Canada 150 Train from Port Moody to Ottawa to celebrate Canada's 150th year since Confederation. The train stopped in 13 cities along its 3-week summer tour, offering a free block party and concert from Dean Brody, Kelly Prescott[125] and Dallas Arcand.[126] The heritage train drew out thousands to sign the special "Spirit of Tomorrow" car, where children were invited to write their wishes for the future of Canada and send them to Ottawa. Prime Minister Justin Trudeau and daughter Ella-Grace Trudeau also visited the train and rode it from Revelstoke to Calgary.[127]

Non-railway services

Historically, Canadian Pacific operated several non-railway businesses. In 1971, these businesses were split off into the separate company Canadian Pacific Limited, and in 2001, that company was further split into five companies. CP no longer provides any of these services.[128]

Telegraph

The original charter of the CPR granted in 1881 provided for the right to create an electric telegraph and telephone service including charging for it. The telephone had barely been invented but telegraph was well established as a means of communicating quickly across great distances. Being allowed to sell this service meant the railway could offset the costs of constructing and maintaining a pole line along its tracks across vast distances for its own purposes which were largely for dispatching trains. It began doing so in 1882 as the separate Telegraph Department. It would go on to provide a link between the cables under the Atlantic and Pacific oceans when they were completed. Before the CPR line, messages to the west could be sent only via the United States.[129]

Paid for by the word, the telegram was an expensive way to send messages, but they were vital to businesses. An individual receiving a personal telegram was seen as being someone important except for those that transmitted sorrow in the form of death notices. Messengers on bicycles delivered telegrams and picked up a reply in cities. In smaller locations, the local railway station agent would handle this on a commission basis. To speed things, at the local end messages would first be telephoned. In 1931, it became the Communications Department in recognition of the expanding services provided which included telephones lines, news wire, ticker quotations for capital stocks and eventually teleprinters. All were faster than mail and very important to business and the public alike for many decades before mobile phones and computers came along. It was the coming of these newer technologies especially cellular telephones that eventually resulted in the demise of these services even after formation in 1967 of CN-CP Telecommunications in an effort to effect efficiencies through consolidation rather than competition. Deregulation in the 1980s, brought about mergers and the sale of remaining services and facilities.[130]

Radio

On 17 January 1930, the CPR applied for licences to operate radio stations in 11 cities from coast-to-coast for the purpose of organising its own radio network in order to compete with the CNR Radio service. The CNR had built a radio network with the aim of promoting itself as well as entertaining its passengers during their travels. The onset of the Great Depression hurt the CPR's financial plan for a rival project and in April they withdrew their applications for stations in all but Toronto, Montreal and Winnipeg. CPR did not end up pursuing these applications but instead operated a phantom station in Toronto known as "CPRY," with initials standing for "Canadian Pacific Royal York"[131] which operated out of studios at CP's Royal York Hotel and leased time on CFRB and CKGW.[132] A network of affiliates carried the CPR radio network's broadcasts in the first half of the 1930s, but the takeover of CNR's Radio service by the new Canadian Radio Broadcasting Commission removed CPR's need to have a network for competitive reasons and CPR's radio service was discontinued in 1935.[133]

CPR programming included a series of concert broadcasts from Montreal with an orchestra conducted by Douglas Clarke and a series called Concert Orchestra broadcast from the Royal York Hotel featuring conductor Rex Battle, and another series of concerts, this time sponsored by Imperial Oil and featuring conductor Reginald Stewart with a 55-piece orchestra and some of the leading soloists of the day, also performing at the Royal York.[134]

Steamships

Steamships played an important part in the history of CP from the very earliest days. During construction of the line in British Columbia even before the private CPR took over from the government contractor, ships were used to bring supplies to the construction sites. Similarly, to reach the isolated area of Superior in northern Ontario ships were used to bring in supplies to the construction work. While this work was going on there was already regular passenger service to the West. Trains operated from Toronto to Owen Sound where CPR steamships connected to Fort William where trains once again operated to reach Winnipeg. Before the CPR was completed the only way to reach the West was through the United States via St. Paul and Winnipeg. This Great Lakes steam ship service continued as an alternative route for many years and was always operated by the railway. Canadian Pacific passenger service on the lakes ended in 1965.[135]

In 1884, CPR began purchasing sailing ships as part of a railway supply service on the Great Lakes. Over time, CPR became a railway company with widely organized water transportation auxiliaries including the Great Lakes service, the trans-Pacific service, the Pacific coastal service, the British Columbia lake and river service, the trans-Atlantic service and the Bay of Fundy Ferry service. In the 20th century, the company evolved into an intercontinental railway which operated two transoceanic services which connected Canada with Europe and with Asia. The range of CPR services were aspects of an integrated plan.[136]

Advertisement for Canadian Pacific steamships to the Far East, 1936

Once the railway was completed to British Columbia, the CPR chartered and soon bought their own passenger steamships as a link to the Orient. These sleek steamships were of the latest design and christened with "Empress" names (e. g., RMS Empress of Britain, Empress of Canada, Empress of Australia, and so forth). Travel to and from the Orient and cargo, especially imported tea and silk, were an important source of revenue, aided by Royal Mail contracts. This was an important part of the All-Red Route linking the various parts of the British Empire.

The other ocean part was the Atlantic service to and from the United Kingdom, which began with acquisition of two existing lines, Beaver Line, owned by Elder Dempster and Allan Lines. These two segments became Canadian Pacific Ocean Services (later, Canadian Pacific Steamships) and operated separately from the various lake services operated in Canada, which were considered to be a direct part of the railway's operations. These trans-ocean routes made it possible to travel from Britain to Hong Kong using only the CPR's ships, trains and hotels. CP's 'Empress' ships became world-famous for their luxury and speed.[citation needed] They had a practical role, too, in transporting immigrants from much of Europe to Canada, especially to populate the vast prairies. They also played an important role in both world wars with many of them being lost to enemy action, including Empress of Britain.[135]

There were also a number of rail ferries operated over the years as well including, between Windsor, Ontario, and Detroit from 1890 until 1915. This began with two paddle-wheelers capable of carrying 16 cars. Passenger cars were carried as well as freight. This service ended in 1915 when the CPR made an agreement with the Michigan Central to use their Detroit River tunnel opened in 1910. Pennsylvania-Ontario Transportation Company was formed jointly with the PRR in 1906 to operate a ferry across Lake Erie between Ashtabula, Ohio, and Port Burwell, Ontario, to carry freight cars, mostly of coal, much of it to be burned in CPR steam locomotives. Only one ferry boat was ever operated, Ashtabula, a large vessel which eventually sank in a harbour collision in Ashtabula on 18 September 1958, thus ending the service.[135]

Canadian Pacific Car and Passenger Transfer Company was formed by other interest in 1888 linking the CPR in Prescott, Ontario, and the NYC in Ogdensburg, New York. Service on this route had actually begun very early, in 1854, along with service from Brockville. A bridge built in 1958 ended passenger service however, freight continued until Ogdensburg's dock was destroyed by fire 25 September 1970, thus ending all service. CPC&PTC was never owned by the CPR. Bay of Fundy ferry service was operated for passengers and freight for many years linking Digby, Nova Scotia, and Saint John, New Brunswick. Eventually, after 78 years, with the changing times the scheduled passenger services would all be ended as well as ocean cruises. Cargo would continue on both oceans with a change over to containers. CP was an intermodal pioneer especially on land with road and railway mixing to provide the best service. CP Ships was the final operation, and in the end it too left CP ownership when it was spun off in 2001. CP Ships was merged with Hapag-Lloyd in 2005.[137]

British Columbia Coast Steamships

The Canadian Pacific Railway Coast Service (British Columbia Coast Steamships or BCCS) was established when the CPR acquired in 1901 Canadian Pacific Navigation Company (no relation) and its large fleet of ships that served 72 ports along the coast of British Columbia including on Vancouver Island. Service included the Vancouver-Victoria-Seattle Triangle Route, Gulf Islands, Powell River, as well as Vancouver-Alaska service. BCCS operated a fleet of 14 passenger ships made up of a number of Princess ships, pocket versions of the famous oceangoing Empress ships along with a freighter, three tugs and five railway car barges. Popular with tourists, the Princess ships were famous in their own right especially Princess Marguerite (II) which operated from 1949 until 1985 and was the last coastal liner in operation. The best known[by whom?] of the princess ships, however, is Princess Sophia, which sank with no survivors in October 1918 after striking the Vanderbilt Reef in Alaska's Lynn Canal, constituting the largest maritime disaster in the history of the Pacific Northwest. These services continued for many years until changing conditions in the late 1950s brought about their decline and eventual demise at the end of season in 1974. Princess Marguerite was acquired by the province's British Columbia Steamship (1975) Ltd.[138] and continued to operate for a number of years. In 1977 although BCCSS was the legal name, it was rebranded as Coastal Marine Operations (CMO). By 1998 the company was bought by the Washington Marine Group which after purchase was renamed Seaspan Coastal Intermodal Company and then subsequently rebranded in 2011 as Seaspan Ferries Corporation. Passenger service ended in 1981.[139]

British Columbia Lake and River Service

The Canadian Pacific Railway Lake and River Service (British Columbia Lake and River Service) developed slowly and in spurts of growth. CP began a long history of service in the Kootenays region of southern British Columbia beginning with the purchase in 1897 of the Columbia and Kootenay Steam Navigation Company which operated a fleet of steamers and barges on the Arrow Lakes and was merged into the CPR as the CPR Lake and River Service which also served the Arrow Lakes and Columbia River, Kootenay Lake and Kootenai River, Lake Okanagan and Skaha Lake, Slocan Lake, Trout Lake, and Shuswap Lake and the Thompson River/Kamloops Lake.[135]

All of these lake operations had one thing in common, the need for shallow draft therefore sternwheelers were the choice of ship. Tugs and barges handled railway equipment including one operation that saw the entire train including the locomotive and caboose go along. These services gradually declined and ended in 1975 except for a freight barge on Slocan Lake. This was the one where the entire train went along since the barge was a link to an isolated section of track. The Iris G tug boat and a barge were operated under contract to CP Rail until the last train ran late in December 1988. The sternwheel steamship Moyie on Kootenay Lake was the last CPR passenger boat in BC lake service, having operated from 1898 until 1957. She became a beached historical exhibit, as are also the Sicamous and Naramata at Penticton on Lake Okanagan.[140][141]

Hotels

To promote tourism and passenger ridership the Canadian Pacific established a series of first class hotels. These hotels became landmarks famous in their own right. They include the Algonquin in St. Andrews, Château Frontenac in Quebec, Royal York in Toronto, Minaki Lodge in Minaki Ontario, Hotel Vancouver, Empress Hotel in Victoria and the Banff Springs Hotel and Chateau Lake Louise in the Canadian Rockies. Several signature hotels were acquired from its competitor Canadian National during the 1980s, including the Jasper Park Lodge. The hotels retain their Canadian Pacific heritage, but are no longer operated by the railway. In 1998, Canadian Pacific Hotels acquired Fairmont Hotels, an American company, becoming Fairmont Hotels and Resorts, Inc.; the combined corporation operated the historic Canadian properties as well as the Fairmont's U.S. properties until merged with Raffles Hotels and Resorts and Swissôtel in 2006.[142]

Airline

Canadian Pacific Airlines, also called CP Air, operated from 1942 to 1987 and was the main competitor of Canadian government-owned Air Canada. Based at Vancouver International Airport, it served Canadian and international routes until it was purchased by Pacific Western Airlines which merged PWA and CP Air to create Canadian Airlines.[143]

Locomotives

Steam locomotives

Countess of Dufferin
CPR 2816 Locomotive

In the CPR's early years, it made extensive use of American-type 4-4-0 steam locomotives, and such examples of this are the Countess of Dufferin or No. 29. Later, considerable use was also made of the 4-6-0 type for passenger and 2-8-0 type for freight. Starting in the 20th century, the CPR bought and built hundreds of Ten-Wheeler-type 4-6-0s for passenger and freight service and similar quantities of 2-8-0s and 2-10-2s for freight. 2-10-2s were also used in passenger service on mountain routes. The CPR bought hundreds of 4-6-2 Pacifics between 1906 and 1948 with later versions being true dual-purpose passenger and fast-freight locomotives.[144]

CPR 2317, a G-3-c 4-6-2 Pacific-type locomotive built at the CPR's Angus Shops in 1923

The CPR built hundreds of its own locomotives at its shops in Montreal, first at the "New Shops", as the DeLorimer shops were commonly referred to, and at the massive Angus Shops that replaced them in 1904. Some of the CPR's best-known locomotives were the 4-6-4 Hudsons. First built in 1929, they began a new era of modern locomotives with capabilities that changed how transcontinental passenger trains ran, eliminating frequent changes en route. What once took 24 changes of engines in 1886, all of them 4-4-0s except for two of 2-8-0s in the mountains, for 4,640 kilometres (2,883 mi) between Montreal and Vancouver became 8 changes.[citation needed] The 2800s, as the Hudson type was known, ran from Toronto to Fort William, a distance of 1,305 kilometres (811 mi), while another lengthy engine district was from Winnipeg to Calgary 1,339 kilometres (832 mi). Especially notable were the semi-streamlined H1 class Royal Hudsons, locomotives that were given their name because one of their class hauled the royal train carrying King George VI and Queen Elizabeth on the 1939 royal tour across Canada without change or failure. That locomotive, No. 2850, is preserved in the Exporail exhibit hall of the Canadian Railway Museum in Saint-Constant, Quebec. One of the class, No. 2860, was restored by the British Columbia government and used in excursion service on the British Columbia Railway between 1974 and 1999.[citation needed]

The CPR also made many of their older 2-8-0s, built in the turn of the century, into 2-8-2s.

In 1929, the CPR received its first 2-10-4 Selkirk locomotives, the largest steam locomotives to run in Canada and the British Empire. Named after the Selkirk Mountains where they served, these locomotives were well suited for steep grades. They were regularly used in passenger and freight service. The CPR would own 37 of these locomotives, including number 8000, an experimental high pressure engine. The last steam locomotives that the CPR received, in 1949, were Selkirks, numbered 5930–5935.

Diesel locomotives

A CP passenger train heads east towards Calgary circa 1973
A westbound CP freight train pulls away from a passing siding after track clearance in Bolton, Ontario. It is headed by four GE AC4400CW locomotives (8627, 9615, 8629, and 8609).

In 1937, the CPR acquired its first diesel-electric locomotive, a custom-built one-of-a-kind switcher numbered 7000. This locomotive was not successful and was not repeated. Production-model diesels were imported from American Locomotive Company (Alco) starting with five model S-2 yard switchers in 1943 and followed by further orders. In 1949, operations on lines in Vermont were dieselized with Alco FA1 road locomotives (eight A and four B units), five ALCO RS-2 road switchers, three Alco S-2 switchers and three EMD E8 passenger locomotives. In 1948 Montreal Locomotive Works began production of ALCO designs.[145]

In 1949, the CPR acquired 13 Baldwin-designed locomotives from the Canadian Locomotive Company for its isolated Esquimalt and Nanaimo Railway and Vancouver Island was quickly dieselized. Following that successful experiment, the CPR started to dieselize its main network. Dieselization was completed 11 years later, with its last steam locomotive running on 6 November 1960. The CPR's first-generation locomotives were mostly made by General Motors Diesel and Montreal Locomotive Works (American Locomotive Company designs), with some made by the Canadian Locomotive Company to Baldwin and Fairbanks Morse designs.

CP was the first railway in North America to pioneer alternating current (AC) traction diesel-electric locomotives in 1984. In 1995, CP turned to GE Transportation for the first production AC traction locomotives in Canada, and now has the highest percentage of AC locomotives in service of all North American Class I railways.

On 16 September 2019, Progress Rail rolled out two SD70ACU rebuilds in Canadian Pacific heritage paint schemes; 7010 wears a Tuscan red and grey paint scheme with script writing, and the 7015 wears a similar paint scheme with block lettering.[146]

CP 7028, an EMD SD70ACU, in Nashotah, Wisconsin

On 11 November 2019, five SD70ACU units with commemorative military themes were unveiled during CPR's Remembrance Day ceremony. These units are numbered 7020–7023, with 7024 being renumbered to 6644 to commemorate the date of D-Day: 6 June 1944.[147]

In 2021 Canadian Pacific repainted two locomotives orange: ES44AC 8757 which was unveiled for National Day for Truth and Reconciliation in September 2021,[148] and ES44AC 8781 to commemorate shipper Hapag-Lloyd.[149]

The fleet includes these types:[150][151]

Active diesel roster

Builder Model Horsepower Build date Quantity Numbers Notes
EMD FP9A 1750 1958 1 1401 Acquired 1998, used on the Royal Canadian Pacific
EMD F9B 1750 1958 1 1900 Acquired 1998, used on the RCP
EMD GP20C-ECO 2000 2012–2014 130 2200–2329
EMD GP38AC 2000 1970–1971 21 3000–3020
EMD GP38-2 2000 1983–1986 115 3021–3135
EMD GP40-3 3000 1966–1968 2 4007–4008 Ex-MILW/SOO
EMD FP9A 1750 1957 2 4106–4107 Acquired 2006, used on the RCP
EMD GP38-2 2000 1974–1983 74 4400–4452, 4506–4515 Acquired 1990, ex-SOO, 4500 series are ex-MILW
EMD GP39-2 2300 1978 1 4599 Ex-KCCX/SOO
EMD SD30C-ECO 3000 2013–2015 50 5000–5049
EMD SD40-3 3000 1980–1984 10 5100–5109 Rebuilt 2017
EMD SD40-2 3000 1972–1984 508 5565–5879, 5900–6092
EMD SD60 3800 1989 37 6221–6257 Acquired 1990, ex-SOO
EMD SD60M 3800 1989 5 6258–6262 Acquired 1990, ex-SOO
EMD SD60-3 3800 1989 10 6300–6309 Rebuilt 2017, ex-SOO
EMD SD40-2 3000 1972–1984 23 6601–6623 Ex-SOO
EMD SD40-2F 3000 1989 10 9004, 9010–9011, 9014, 9017, 9020-9024 Many sold to CMQ. After the purchase of CMQ in June 2020, the remaining SD40-2Fs returned to CP Property.
EMD SD70ACU 4300 1998–1999 60 6644, 7000–7023, 7025-7059 Rebuilt 2019–2020 from SD90MACs, 7010–7019 in heritage paint schemes. 6644, 7020–7023 in five distinct commemorative military paint schemes.
EMD GP38-2 2000 1972 10 7303–7312 Acquired 1991, ex-DH
GE AC4400CWM 4400 1995–1998 262 8000–8080, 8100–8199, 8200–8280 Rebuilt 2017–2021.
GE AC4400CW 4400 2001–2004 173 8600–8655, 9700–9740, 9750–9784, 9800–9840
GE ES44AC 4400 2005–2012 291 8700–8960, 9350–9379 8757 painted into an Every Child Matters livery for National Day for Truth & Reconciliation[152]

Retired diesel roster

Builder Model Horsepower Build date Retirement Quantity Numbers Notes
GMD FP7A 1750 1951–1953 1978 24 1400–1404, 1416–1434 Renumbered from 4099 to 4103
GMD FP9A 1750 1954–1953 1978 11 1405–1415,
EMD E8A 2250 1949 1978 3 1800–1802 1800 and 1802 sold to Via Rail
GMD F7B 1500 1951–1954 1978 51 1900, 1909–1919, 4424–4448, 4459–4462 Many sold to Via Rail
GMD F9B 1750 1951–1954 1978 8 1901–1908 Many sold to Via Rail
Railpower GG20B 2000 2005–2006 2006 6 1700–1707 Order cancelled before completion
Alco/MLW FA-1 1500 1949–1950 1977 28 4000–4027
MLW FA-2 1500 1951–1953 1977 20 4042–4051, 4084–4093
CLC CPA16-4 1600 1951–1954 1975 11 4052–4057, 4064–4065, 4104–4105
CLC CFA16-4 1600 1953 1975 6 4076–4081
MLW FPA-2 1500 1953 1975 7 4082–4083, 4094–4098
MLW C424 2400 1963–1966 1998 51 4200–4250 4200 originally numbered 8300
MLW M-630 3000 1968–1970 1995 37 4500–4515, 4550–4581
MLW M-636 3600 1969–1970 1995 44 4700–4743
MLW M-640 4000 1971 1998 1 4744 Rebuilt in 1984 as an AC Traction test unit[153]
GMD GP30 2250 1963 1998 2 5000–5001 Originally numbered 8200–8201
GMD GP35 2500 1964–1966 1999 23 5002–5025 Some converted to control cabs
GMD SD40 3000 1966–1967 2001 65 5500–5564
MLW S-3 1000 1951–1959 1984 101 6500–6600
MLW S-10 1000 1958 1983 13 6601–6613
MLW S-10 660 1959 1985 10 6614–6623
GMD SW8 800 1950–1951 1994 10 6700–6709
GMD SW900 900 1955 1994 11 6710–6720 6711 used as a track mobile
Alco/MLW S-2 1000 1943–1947 1986 78 7010–7064, 7076–7098
Baldwin DS-4-4-1000 1000 1948 1979 11 7065–7075
Baldwin DRS-4-4-1000 1000 1948–1949 1979 13 8000–8012
MLW RS-23 1000 1959–1960 1997 35 8013–8046
GMD SW1200RS 1200 1958–1960 2012 72 8100–8171 Many rebuilt into SW1200RSUs in the 1980s
Alco/MLW RS-2 1500 1949–1950 1983 9 8400–8408
GMD GP7 1500 1952 2013 17 8409–8425 Many rebuilt into GP7Us in the 1980s
MLW RS-3 1600 1954 1983 36 8426–8461
GMD GP9 1750 1954–1959 2015 200 8483–8546, 8611–8708, 8801–8839 Many rebuilt into GP9Us in the 1980s
MLW RS-10 1600 1956 1984 65 8462–8482, 8557–8600
CLC H-16-44 1600 1955–1957 1976 40 8547–8556, 8601–8610, 8709–8728
MLW RS-18 1800 1957–1958 1998 74 8729–8800, 8824 Many rebuilt into RS18Us in the 1980s
CLC/FM H-24-66 2400 1955 1976 21 8900–8920 8905[154] Preserved at the Canadian Railway Museum
MLW RSD-17 2400 1957 1995 1 8921 Preserved at Elgin County Railway Museum[155]
GMD SD40-2F 3000 1989 2016 25 9000–9003, 9005–9009, 9012–9013, 9015–9016, 9018–9019 Scrapped, The rest not numbered here went to Central Maine and Quebec Railway
Budd RDC-3 550 1953–1956 1978 5 9020–9024 Many sold to Via Rail
Budd RDC-1 550 1955–1958 1978 24 9049–9072 Many sold to Via Rail
GMD SD90MAC 4300 1998–1999 2019 61 9100–9160 Rebuilt into SD70ACUs
Budd RDC-2 550 1951–1956 1978 23 9100–9199 Many sold to Via Rail
Budd RDC-4 550 1955–1956 1978 3 9200–9251 Sold to Via Rail
Budd RDC-5 550 1955–1956 1982 8 9300–9309 Many sold to Via Rail
GMD SD90MAC-H 6000 1998 2008 4 9300–9303 All have been scrapped

Corporate structure

Canadian Pacific Railway Limited (TSXCP NYSECP) is a Canadian railway transportation company that operates the Canadian Pacific Railway. It was created in 2001 when the CPR's former parent company, Canadian Pacific Limited, spun off its railway operations. On 3 October 2001, the company's shares began to trade on the New York Stock Exchange and the Toronto Stock Exchange under the "CP" symbol. During 2003, the company earned CA$3.5 billion in freight revenue. In October 2008, Canadian Pacific Railway Ltd was named one of "Canada's Top 100 Employers" by Mediacorp Canada Inc., and was featured in Maclean's. Later that month, CPR was named one of Alberta's Top Employers, which was reported in both the Calgary Herald[156] and the Edmonton Journal.[157]

Presidents

Term(s) Name
1881–1888 Sir George Stephen United Kingdom/Canada
1889–1899 Sir William Cornelius Van Horne United States/Canada
1899–1918 The Lord Shaughnessy United States/Canada
1918–1942 Sir Edward Wentworth Beatty Canada
1942–1947 D'Alton Corry Coleman Canada
1947–1948 William Neal Canada
1948–1955 William Allen Mather Canada
1955–1964, 1966 Norris Roy "Buck" Crump Canada
1964–1966 Robert A. "Bob" Emerson Canada
1966–1972 Ian David Sinclair Canada
1972–1981 Fred Burbidge Canada
1981–1984 William "Bill" Stinson Canada
1984–1990 Russell S. Allison Canada
1990–2006 Robert J. "Rob" Ritchie Canada
2006–2012 Fred Green Canada
2012 Stephen C. Tobias (Interim) United States
2012–2017 E. Hunter Harrison United States
2017–Present Keith Creel United States

Major facilities

CP owns a large number of large yards and repair shops across their system, which are used for many operations ranging from intermodal terminals to classification yards. Below are some examples of these.

Hump yards

Hump yards work by using a small hill over which cars are pushed, before being released down a slope and switched automatically into cuts of cars, ready to be made into outbound trains. Many of these yards were closed in 2012 and 2013 under Hunter Harrison's company-wide restructuring; only the St. Paul Yard hump remains open.[158]

  • Calgary, Alberta – 68-hectare (168-acre) Alyth Yard; handles 2,200 cars daily (closed)
  • Franklin Park, Illinois – Bensenville Yard (closed)
  • Montreal , Quebec – St. Luc Yard; active since 1950. Flat switching since the mid-1980s. (closed)
  • St. Paul, Minnesota – Pig's Eye Yard / St. Paul Yard[159]
  • Toronto, Ontario – Toronto Yard (also known as "Toronto Freight Yard or Agincourt Yard"); opened in 1964
  • Winnipeg, Manitoba – Rugby Yard (also known as "Weston Yard") (active)

Aircraft

As of February 2023, Transport Canada lists the following aircraft in its database and operate as ICAO airline designator CRR, and telephony RAILCAR.[160][161]

Joint partnership

See also

  • Canadian Pacific Air Lines Flight 21
  • Canadian Pacific Air Lines Flight 402
  • Canadian Pacific Building (London)
  • Canadian Pacific Building (New York City)
  • Canadian Pacific Building (Toronto)
  • Facilities of the Canadian Pacific Railway
  • History of Chinese immigration to Canada


References

  1. "Annual Report 2020". CP Rail. https://s21.q4cdn.com/736796105/files/doc_financials/2020/ar/CP_AnnualReport2020_SECURED.pdf. 
  2. 2.0 2.1 Canadian Pacific Railway (28 January 2011). "Canadian Pacific trains across North America pause for day of mourning". http://www8.cpr.ca/cms/English/Media/News/General/2009/Day+of+Mourning.htm. 
  3. Ellinger, Elaine (2021-03-14). "Canadian Pacific Map". http://www.acwr.com/economic-development/rail-maps/canadian-pacific. 
  4. "Railway History in Canada". June 18, 2020. https://www.thecanadianencyclopedia.ca/en/article/railway-history. 
  5. "The Top 200: Canada's Largest Companies (c. 1973–74)". Western Libraries, University of Western Ontario (6 Side). 2008. http://www.lib.uwo.ca/business/200TopCompanies.html. 
  6. "Canadian Pacific's U.S. HQ moves to new digs". http://www.startribune.com/canadian-pacific-s-u-s-hq-moves-to-new-digs/167371215/. 
  7. "Canadian Pacific Railway Limited". 14 January 2022. https://www.msn.com/en-us/money/stockdetails/ownership/fi-aaxl52?ownershipType=institutional. 
  8. "Railways: The Road to Confederation". http://histoiredurailhistory.ca/confederation_en.html. 
  9. Berton, Pierre (2001). The National Dream: The Great Railway, 1871–1881. Anchor Canada. ISBN 978-0-385-67355-6. https://books.google.com/books?id=Lnss_5c9OmoC&q=%22The+government+had+promised+the+railway+to+British+Columbia%22&pg=PT18. 
  10. Fleming, Sandford (1877). Report on Surveys and Preliminary Operations on the Canadian Pacific Railway up to January 1877. ISBN 9780665301834. https://archive.org/details/cihm_30183. Retrieved 25 January 2013. 
  11. Fleming, Sandford (1880), Report and Documents in Reference to the Canadian Pacific Railway, ISBN 9780665301858, https://archive.org/details/cihm_30185, retrieved 25 January 2013 
  12. Cook, Ramsay; Hamelin, Jean (1966) (in en). Dictionary of Canadian Biography. Springer Science & Business Media. ISBN 9780802039989. https://books.google.com/books?id=cxK0A0FUvZgC&q=Onderdonk+received+contracts+to+build+between+Yale+and+Port+Moody%2C+and+between+Savona%27s+Ferry+and+Eagle+Pass&pg=PA786. 
  13. Fleming 1880
  14. 14.0 14.1 14.2 14.3 Martin, Joseph E. (Oct–Nov 2017). "Titans". Canada's History 97 (5): 47–53. ISSN 1920-9894. 
  15. David J Gagnon. "An Act Respecting the Canadian Pacific Railway". kos.net. http://members.kos.net/sdgagnon/cpa.html. 
  16. McKenzie, Kenneth J. (May 1996). "Damned if you do, Damned if you don't: An option valve to evaluating the subsidy of the CPR Mainline". Canadian Journal of Economics: 255. 
  17. "Canada Central Railway". http://www.railways.incanada.net/Articles/Article2005_2.html. 
  18. Berton, Pierre. "The Last Spike: The Great Railway 1881–1885". McClelland and Stewart Limited, Toronto. 1971, p. 280
  19. Martin, Edward J. (1980). The Railway Stations of Western Canada: an Architectural History. White Rock, British Columbia: Studio E Martin. ISBN 0920716008. https://archive.org/details/railwaystationso0000mart. Retrieved November 20, 2020. 
  20. Downs, Art (1980). Incredible Rogers Pass (2 ed.). Surrey, BC: Heritage. p. 49. ISBN 978-0-919214-08-8. 
  21. "CPR / My Neighbour to the West". 21 November 2008. https://www.flickr.com/photos/wdwbarber/3046860680. 
  22. Lamb, W. Kaye. "History of the Canadian Pacific Railway". Macmillan Publishing Co., Inc., New York (1977), p. 79.
  23. "Spiral Tunnels". Old Time Trains. http://www.trainweb.org/oldtimetrains/CPR/spiral.htm. 
  24. "History: Building the Canadian Pacific Railway". http://www.collectionscanada.gc.ca/settlement/kids/021013-2031.3-e.html. 
  25. Beyond the Sterile Mountains: the Chinese in British Columbia, Joseph Morton (1976)
  26. Prime Minister Harper's 22 June 2006 speech to the Canadian Parliament . Retrieved 27 April 2014.
  27. Berton, Pierre. "The Last Spike: The Great Railway 1881–1885", Random House, 14th edition (1983), p. 267
  28. Cruise, David (1988). The men who built the CPR: Lords of the Line. New York: Penguin Group. p. 157. 
  29. Canadian Pacific Facts and Figures (1937), p. 15.
  30. Toronto, Hamilton & Buffalo Railway Historical Society, Historical Outline. Retrieved 27 April 2014.
  31. CPConnecting Canada, Timeline. Retrieved 8 July 2022
  32. Wilson, Donald M., The Ontario & Quebec Railway. Mika Publishing, Belleville, Ontario (1984). p. 72.
  33. 33.0 33.1 33.2 Dorman, Robert and Stoltz, D.E. "A Statutory History of Railways in Canada 1836-1986". The Canadian Institute of Guided Ground Transport, Queen's University, 1987, pp. 109–110, 213, 293, 374, 421.
  34. Canadian Pacific Railway, "Prairie & Pacific Regions Subdivision Chart and Historical Record" (1943).
  35. "The Canadian Pacific Railway Co". The Week: A Canadian Journal of Politics, Literature, Science and Arts 8: 127. 24 January 1884. https://archive.org/stream/weekcanadianjour01toro#page/n63/mode/1up. 
  36. Jonathan Hanna, "Colonist Cars Helped Build the West", Momentum Fall 2008
  37. Dawe, Michael (19 March 2010). "Canadian Pacific Railway Bridge now 100 years old". Red Deer Advocate. p. 34. http://www.forthjunction.com/dawe-cpr-bridge.htm. 
  38. Tom Murray (2011). Rails Across Canada: The History of Canadian Pacific and Canadian National Railways. MBI Publishing Company. p. 67. ISBN 978-1-61060-139-9. https://books.google.com/books?id=vf7efnxi1XwC. 
  39. "Rogers Pass a History of the Canadian Pacific Railway and Trans-Canada Highway crossing.". http://cdnrail.railfan.net/RogersPass/RogersPasstext.htm. 
  40. "Canadian Railway Hall of Fame". http://www.railfame.ca/sec_ind/technology/en_2003_MountMacdonaldTunnel.asp#. 
  41. "Soo train goes into the river", Evening Sentinel, 22 January 1910
  42. "Train derailed on bridge", The Age, 25 January 1910.
  43. Pointe-au-Père Site historique maritime profike . Retrieved 27 April 2014.
  44. Canadian Pacific Our History. See "History of CPR & War" pdf. ("Canadian Pacific - Our history". http://www.cpr.ca/EN/ABOUT-CP/OUR-PAST-PRESENT-AND-FUTURE/Pages/our-history.aspx. )
  45. "The Canadian Pacific Railway in Western Canada", Atlas of Alberta Railways.
  46. "Railway Land Grants in the Prairie Provinces", Atlas of Alberta Railways.
  47. On to Ottawa Trek website. Retrieved 27 April 2014.
  48. Canadian Pacific: Our History , cpr.ca. Retrieved 27 April 2014.
  49. "1977: VIA Rail Canada is born". http://www.cbc.ca/archives/categories/economy-business/transport/transport-general/via-rail-canada-is-born.html. 
  50. Garden, John F., "Nicholas Morant's Canadian Pacific", Footprint Publishing, 1992, p. 55, ISBN:978-0969162131
  51. "Mississauga Train Derailment (1979)". Local history. City of Mississauga. http://www.mississauga.ca/portal/residents/localhistory?paf_gear_id=9700018&itemId=5500001. 
  52. "The Mississauga Evacuation, Final Report, November 1981". Ministry of the Solicitor General of Ontario. http://cidbimena.desastres.hn/docum/crid/Diciembre2004/pdf/eng/doc4131/doc4131.htm. 
  53. Canadian Pacific Subsidiaries website . Retrieved 27 April 2014.
  54. Branchline Canada's Rail Newsmagazine. May 1996. https://bytownrailwaysociety.ca/phocadownload/branchline/1996/1996-05.pdf. Retrieved January 27, 2021. 
  55. "Annual Information Form – Canadian Pacific Railway Limited". 1 March 2002. https://www.cpr.ca/en/investors-site/Lists/FinancialReports/cp-aif-2001.pdf. [yes|permanent dead link|dead link}}]
  56. "News – 2010 Commerce Centre". http://www.2010commercecentre.gov.bc.ca/businessplanning/News.aspx. 
  57. "CP Rail to buy Dakota, Minnesota and Eastern for US$1.48B" , Financial Post. 5 September 2007.
  58. "CP completes acquisition of DM&E" , newswire.ca. Retrieved 27 April 2014.
  59. "CP completes Dakota, Minnesota & Eastern takeover". Railway Gazette International. 31 October 2008. http://www.railwaygazette.com/news/single-view/view//cp-completes-dakota-minnesota-eastern-takeover.html. Retrieved 31 October 2008. 
  60. Brent Jang and Jacquie Mcnish. ""Activist hedge fund takes major stake in CP Rail", Globe and Mail, 28 October 2011". The Globe and Mail. https://www.theglobeandmail.com/globe-investor/activist-hedge-fund-takes-major-stake-in-cp-rail/article2217958. 
  61. "Pershing Square CEO looks to move fast on CP Rail" , The Globe and Mail, 30 October 2011.
  62. Austen, Ian (17 May 2012). "Ackman wins proxy battle for Canadian Pacific". Dealbook. https://dealbook.nytimes.com/2012/05/17/canadian-pacific-c-e-o-and-five-directors-step-down. 
  63. Canada (29 June 2012). "As Harrison takes CP's top job, Ackman's coup is complete". The Globe and Mail. https://www.theglobeandmail.com/globe-investor/hunter-harrison-tapped-as-canadian-pacific-ceo/article4379406/comments. 
  64. Strike ends at Canadian Pacific Railway , Reuters, 1 June 2012.
  65. "CBC coverage of rail strike at Canadian Pacific", Canadian Broadcasting Corporation, 1 June 2012.
  66. 66.0 66.1 Quebec targets CP Railway for Lac-Mégantic cleanup costs. The Globe and Mail (14 August 2013). Retrieved 2013-10-05.
  67. "CP Rail refuses to pay for Lac-Mégantic cleanup", Canadian Broadcasting Corporation, 15 August 2013. Retrieved 5 October 2013.
  68. Stephenson, Amanda (19 February 2014). "CP boss calls for halt to hazardous tankers: 'Almighty dollar' behind reluctance to take action". Calgary Herald. http://www2.canada.com/calgaryherald/news/business/story.html?id=1103c232-5607-4053-9efa-3b7b54220203. 
  69. Dana Mattioli, Liz Hoffman and David George-Cosh (13 October 2014). "Canadian Pacific Approached CSX About Merger Deal". The Wall Street Journal. https://www.wsj.com/articles/canadian-pacific-approached-csx-about-merger-deal-1413141950?KEYWORDS=CSX. 
  70. "Canadian Pacific Railway, Norfolk Southern don't agree on much, Chicago Business Journal, 10 February 2016
  71. "Canadian Pacific pursues merger talks with Norfolk Southern". Manila Bulletin. 12 February 2016. http://www.mb.com.ph/canadian-pacific-pursues-merger-talks-with-norfolk-southern/. 
  72. "Canadian Pacific argues for Norfolk Southern takeover in new report". CYV News
  73. News, ABC. "Business Index". ABC News
  74. "CP to seek shareholder support for Norfolk takeover talks". 10 February 2017 – Reuters.com
  75. "DEV CP Emerg Response". http://cpconsolidation.com/?password-protected=login&redirect_to=http%3A%2F%2Fcpconsolidation.com%2F. 
  76. "Canadian Pacific creates website to argue for Norfolk merger". The Globe and Mail. The Associated Press. 11 February 2016. https://www.theglobeandmail.com/report-on-business/canadian-pacific-creates-website-to-argue-for-norfolk-merger/article28730726/. 
  77. Press, Associated (11 February 2016). "Canadian Pacific creates website to argue for rail merger"
  78. Neely, Luke (28 November 2016). "Canadian Pacific Files a Complaint With the DOJ -- The Motley Fool". 2016 02 11.
  79. scottdeveau, Frederic Tomesco Scott Deveau (9 February 2016). "CP Drops Possible Proxy Fight as It Pursues Norfolk Southern" – Bloomberg.com. 2016 02 09.
  80. Stevens, Laura (11 February 2016). "UPS Opposes Rail Merger Between Norfolk Southern and Canadian Pacific"The Wall Street Journal
  81. "Canadian Pacific terminates efforts to merge with Norfolk Southern". http://www.cpr.ca/en/investors/canadian-pacific-terminates-efforts-to-merge-with-norfolk-southern. 
  82. "Keith Creel becomes CEO of Canadian Pacific; affirms commitment to safety, best-in-class service". http://www.cpr.ca/en/investors/keith-creel-becomes-ceo-of-canadian-pacific. 
  83. "Three CP Rail workers killed in massive derailment near Field, B.C. | Calgary Herald". 5 February 2019. https://calgaryherald.com/news/local-news/three-cp-rail-workers-killed-in-massive-derailment-near-field-b-c. 
  84. "Police officer suspects internal 'coverup' by CP Rail in fatal B.C. mountain crash". CBC. 24 January 2020. https://www.cbc.ca/news/canada/cp-derailment-investigation-coverup-alleged-1.5436018. 
  85. "Train safety investigator wants RCMP to probe fatal CP mountain crash". CBC. 27 January 2020. https://www.cbc.ca/news/canada/cp-rail-crash-call-investigation-1.5441955. 
  86. "Rail disaster video surfaces on anniversary of CP crash amid controversy over police probe". CBC. 4 February 2020. https://www.cbc.ca/news/canada/video-derailment-canadian-pacific-railway-field-1.5449758. 
  87. "CP to acquire Central Maine & Quebec Railway from FTAI". 20 November 2019. https://www.cpr.ca/en/media/cp-to-acquire-central-maine-quebec-railway-from-ftai. 
  88. "Canadian Pacific, Kansas City Southern Will Merge into 'The First USMCA Railroad,' CPKC". Railway Age. March 21, 2021. https://www.railwayage.com/freight/class-i/canadian-pacific-kansas-city-southern-will-merge-into-the-first-usmca-railroad-cpkc/. 
  89. McNish, Jacquie (2021-03-21). "Railroads Strike a $25 Billion Merger" (in en-US). The Wall Street Journal. ISSN 0099-9660. https://www.wsj.com/articles/railroads-strike-a-25-billion-merger-11616330332. 
  90. "Canadian Pacific and Kansas City Southern Agree to Combine to Create the First U.S.-Mexico-Canada Rail Network" (in en). 2021-03-21. https://www.businesswire.com/news/home/20210321005013/en/Canadian-Pacific-and-Kansas-City-Southern-Agree-to-Combine-to-Create-the-First-U.S.-Mexico-Canada-Rail-Network. 
  91. "CN to combine with Kansas City Southern" (in en). BusinessWire. 2021-05-21. https://www.businesswire.com/news/home/20210521005364/en/CN-to-Combine-With-Kansas-City-Southern. 
  92. Stephens, Bill (31 August 2021). "Federal regulators reject CN plan to put KCS in voting trust" (in en). https://www.trains.com/trn/news-reviews/news-wire/federal-regulators-reject-cn-plan-to-put-kcs-in-voting-trust/. 
  93. Stephens, Bill (4 September 2021). "Kansas City Southern moves toward a merger agreement with Canadian Pacific" (in en). https://www.trains.com/trn/news-reviews/news-wire/kansas-city-southern-moves-toward-a-merger-agreement-with-canadian-pacific/. 
  94. Vantuono, William C. (4 September 2021). "CP, KCS rekindle relationship" (in en). https://www.railwayage.com/freight/class-i/cp-kcs-rekindle-relationship/. 
  95. "CP shareholders back Kansas City Southern merger – Trains". https://www.trains.com/trn/news-reviews/news-wire/cp-shareholders-back-kansas-city-southern-merger/. 
  96. "KCS Stockholders Back CPKC – Railway Age". 10 December 2021. https://www.railwayage.com/freight/class-i/kcs-stockholders-back-cpkc/?RAchannel=home. 
  97. "Kansas City Southern enters voting trust – Trains". https://www.trains.com/trn/news-reviews/news-wire/kansas-city-southern-enters-voting-trust/. 
  98. "Canadian Pacific - Financials". http://investor.cpr.ca/financials/default.aspx?section=annual. 
  99. "S.S. Keewatin fires up its engine", CTVnews.ca. Retrieved 27 April 2014.
  100. Mitchell, David J., "All aboard! The Canadian Rockies by Train". Douglas & McIntyre, 1995. p. 134.
  101. "Bombardier Wins Train Operations Contract in British Columbia". Bombardier. 23 December 2013. http://www.bombardier.com/en/media-centre/newsList/details.bombardier-transportation20131223bombardierwinstrainoperationsco.html. 
  102. Lamb, W. Kaye. "History of the Canadian Pacific Railway". Macmillan Publishing Co., Inc., New York. 1977. pp. 142–143 [ISBN missing]
  103. Webber, Bernard. "Silk Trains The Romance of Canadian Silk Trains or 'The Silks'", The Word Works Publications (1993), pp. 103–107 [ISBN missing]
  104. Regehr, T.D. (1998). "Van Horne, Sir William Cornelius". Dictionary of Canadian Biography. http://www.biographi.ca/en/bio/van_horne_william_cornelius_14E.html. 
  105. Shaak, Larry. "Royalty Rides the Rails: A railroading perspective of the 1939 Canada/USA Royal Tour". Larry Shaak (2009), p. 189. [ISBN missing]
  106. Dominion aid to agricultural instruction in Canada: A review of the work performed by the Provinces with the moneys granted under the Agricultural Instruction Act during the four year period, 1913–1917. Department of Agriculture. 1917. p. 6. 
  107. Exporail. "Travelling schools". http://histoiredurailhistory.ca/ecole_en.html. 
  108. Canadian Trackside Guide 2012. Bytown Railway Society (2012) [page needed][ISBN missing]
  109. "Local food drive to coincide with Holiday Train passing" . The News-Herald, by Dave Herndon
  110. "Thousands come out to see CP Holiday Train roll through Saskatoon". CBC News 6 December 2015
  111. "Canadian Pacific - Entertainers". http://www.cpr.ca/en/in-your-community/holiday-train/entertainers/Pages/default.aspx. 
  112. "18th edition of the Canadian Pacific Holiday Train on track to raise $1.2M and 250,000 pounds of food". http://www.cpr.ca/en/community/18th-edition-of-the-cp-holiday-train-on-track-to-raise-1-2m-and-250-000-pounds-of-food. 
  113. "CP holiday train on track Springwater". By Ian McInroy, Barrie Examiner, 1 December 2015
  114. "A-list musicians to headline CP Holiday Train events in Hamilton, Calgary and Cottage Grove". http://www.cpr.ca/en/community/holiday-train-signature-events. 
  115. "18th edition of the CP Holiday Train ready to support communities and raise awareness". http://www.cpr.ca/en/community/18th-cp-holiday-train-ready-to-support-communities-and-raise-awareness. 
  116. "CP Holiday Train completes 20th journey across North America, raises more than $1.3 million and collects 200,000 pounds of food". https://www.cpr.ca/en/media/cp-holiday-train-completes-20th-journey-across-north-america. 
  117. Gunnoe, Chase (19 November 2015). CP or NS: which has a soul for preservation?. Trains. http://trn.trains.com/news/news-wire/2015/11/19-cp-ns-preservation. Retrieved 27 February 2019. 
  118. Franz, Justin (November 14, 2020). "Update: CP Fires Up Steam Locomotive For First Time in Eight Years". http://railfan.com/canadian-pacific-fires-up-2816-for-first-time-in-eight-years/. 
  119. Glischinski, Steve (November 14, 2020). "Canadian Pacific No. 2816 to steam again for Holiday Train video (corrected)". Kalmbach Media. https://trn.trains.com/news/news-wire/2020/11/canadian-pacific-no-2816-to-steam-again-for-holiday-train-video. 
  120. "2022 Railroaders of the Year: Keith Creel and Pat Ottensmeyer, 'Transnational Team'" (in en-US). 2022-01-13. https://www.railwayage.com/freight/class-i/2022-railroaders-of-the-year-keith-creel-and-pat-ottensmeyer-transnational-team/. 
  121. Rod Mickleburgh, "Protests are fine, but can the obnoxious profanity", The Globe and Mail, 26 September 2003, S3
  122. Denis St. Pierre, "Protest greets Spirit Train", Sudbury Star, 13 October 2008, p. A9
  123. Mark Klichling, "Protests don't derail Olympic Spirit Train", North Bay Nugget, 14 October 2008, A5
  124. Stephanie Levitz, "Winter Olympic supporters and opponents both claim success from Spirit Train", The Canadian Press, 19 October 2008
  125. "Kelly Prescott". http://www.kellyprescottmusic.com/. 
  126. "Dallas Arcand". http://www.dallasarcand.ca/. 
  127. "CP Canada 150 train connects Canada, draws thousands to celebrate CP's history and Canada's sesquicentennial". http://www.cpr.ca/en/community/cp-canada-150-train-connects-canada-draws-thousands. 
  128. "Canadian Pacific Railway Ltd. (CP) | Canadian company". Encyclopædia Britannica. https://www.britannica.com/topic/Canadian-Pacific-Railway-Ltd. 
  129. Canadian Pacific Facts and Figures (1937), p. 106
  130. Burnet, Robert. "Canadian Railway Telegraph History". Telegraph Key & Sounder, Etobicoke, 1996. p. 181
  131. Pacher, Susanne (30 August 2007). "Presenting: A Behind-The-Scenes Look at the Historic Royal York Hotel – One of Toronto's Crown Jewels (part I)". Advisor.d6cn.com. http://advisor.d6cn.com/Travel/ttttqc/Presenting_A_Behind_The_Scenes_Look_At_The_Historic_Royal_York_Hotel_One_Of_Toronto_s_Crown_Jewels_part_I.html. 
  132. "The Radio Broadcast that Fulfilled the Promise". http://www.broadcasting-history.ca/networks/networks_CNR8.html. 
  133. Buck, George H. (Spring 2006). "The First Wave: The Beginnings of Radio in Canadian Distance Education". Journal of Distance Education 21 (1): 75–88. https://files.eric.ed.gov/fulltext/EJ807814.pdf. Retrieved September 6, 2020. 
  134. "Broadcasting". Historica Canada. https://www.thecanadianencyclopedia.ca/en/article/broadcasting-emc. 
  135. 135.0 135.1 135.2 135.3 Musk, George. Canadian Pacific The Story of the Famous Shipping Line. David & Charles Publishers plc, 2nd edition (1989), pp. 47–55, 101–123, 130, 213. [ISBN missing]
  136. Smith, Joseph Russell (1908). The Ocean Carrier: a History and Analysis of the Service and a Discussion of the Rates of Ocean Transportation, p. 186, at Google Books
  137. Hapag-Lloyd website , "Breakthrough of the container". Retrieved 27 April 2014.
  138. "Prince George Citizen". 6 Nov 1975. p. 26. http://pgnewspapers.pgpl.ca/fedora/repository/pgc:1975-11-06-26. 
  139. "Seaspan Ferries History" , Seaspan Ferries website. Retrieved 27 April 2014.
  140. Kootenay Lake Historical Society . Retrieved 27 April 2014.
  141. SS Sicamous Heritage Society website. Retrieved 27 April 2014.
  142. FRHI Hotels & Resorts website. Retrieved 27 April 2014.
  143. "Pacific Western Airlines Ltd | The Canadian Encyclopedia". https://www.thecanadianencyclopedia.ca/en/article/pacific-western-airlines-ltd#PacificWesternAirlinesLtd. 
  144. Lavallée, Omer. "Canadian Pacific Steam Locomotives". Railfare, 1985, pp. 226340.
  145. Dean, Murray W. and Hanna, David B. "Canadian Pacific Diesel Locomotives". Railfare, Toronto, 1981. p. 36
  146. Canadian Pacific releases two SD70ACU heritage locomotives | Trains Magazine. http://trn.trains.com/news/news-wire/2019/09/16-canadian-pacific-releases-two-sd70acu-heritage-units. Retrieved 16 September 2019. 
  147. "CP details paint schemes on commemorative locomotives". Trains Magazine. 12 November 2019. http://trn.trains.com/news/news-wire/2019/11/12-cp-details-paint-schemes-on-commemorative-locomotives. Retrieved 2019-11-13. 
  148. "Every Child Matters Locomotive". https://www.cpr.ca/en/community/every-child-matters-locomotive. 
  149. "News photo: Canadian Pacific locomotive honors shipper". Trains. November 5, 2021. https://www.trains.com/trn/news-reviews/news-wire/news-photo-canadian-pacific-locomotive-honors-shipper/. 
  150. Trains Magazine - Trains News Wire, Railroad News, Railroad Industry News, Web Cams, and Forms. http://trn.trains.com/railroads/rosters/canadian-pacific. Retrieved 30 August 2019. 
  151. "Home". http://www.cprdieselroster.com/Index.htm. 
  152. Vantuono, William C. (2021-09-30). "CP Supports 'Orange Shirt Day' With 'Every Child Matters' Locomotive" (in en-US). https://www.railwayage.com/freight/class-i/cp-supports-orange-shirt-day-with-every-child-matters-locomotive/. 
  153. "Photo". http://collections.exporail.org/emfc/#browse=enarratives.91. 
  154. "Photo". http://collections.exporail.org/emfc/#browse=enarratives.94. 
  155. "Canadian Pacific Railway RSD-17 #8921". http://ecrm5700.org/canadian-pacific-railway-rsd-17-8921/. 
  156. "Calgary Herald, "Alberta's top 40 places to work"". 18 October 2008. http://www.canada.com/calgaryherald/story.html?id=02b19397-2fdf-4039-ba29-b93eaf908adb. 
  157. "Alberta's best focus on attracting, keeping staff" , Canada.com, 31 October 2008.
  158. "MFAC - Canadian Pacific". http://www.dot.state.mn.us/ofrw/mfac/pdf/mfacsept2018-CP.pdf. 
  159. "North America's Hump Yards". Trains Magazine. 8 July 2006. http://www.trains.com/trn/default.aspx?c=a&id=537. Retrieved 27 June 2008. 
  160. Template:CanICAOD
  161. Template:TCregister

Further reading

External links