Engineering:Top kill
A top kill is a procedure used as a means of regaining control over an oil well that has been producing or is experiencing well control issues with crude oil or natural gas in the well. It is not a procedure where control has been lost over the well, like a blowout. The process involves pumping heavyweight drilling mud into the well. This procedure is expected to stop the flow of oil and gas from the well. A further step could be sealing the well completely, often with cement.[1]
In use
The top kill procedure was used to plug flaming oil wells, blown up by retreating Iraqi forces, in 1991, during the Gulf War.[2]
This technique came to prominence during the 2010 Deepwater Horizon oil spill when it was used in an attempt to seal a seafloor oil well after the failure of the blowout preventer.[1] However, it failed to block the flow of oil.[3]
References
- ↑ 1.0 1.1 Rohrer, Finlo (27 May 2010). "What is a 'top kill'?". BBC. http://news.bbc.co.uk/1/hi/world/us_and_canada/10159626.stm. Retrieved 27 May 2010.
- ↑ Brett Calnton (5 May 2010). "New tactic might seal leaking well sooner, BP CEO says". Houston Chronicle. http://www.chron.com/disp/story.mpl/business/6991278.html. Retrieved 29 May 2010.
- ↑ John Harlow (30 May 2010). "BP struggles to stem gush of reproach". The Times. http://www.timesonline.co.uk/tol/news/world/us_and_americas/article7140280.ece. Retrieved 30 May 2010.
See also
- Well kill
- Blowout preventer
Original source: https://en.wikipedia.org/wiki/Top kill.
Read more |