A top kill is a procedure used as a means of regaining control over an oil well that has been producing or is experiencing well control issues with crude oil or natural gas in the well. It is not a procedure where control has been lost over the well, like a blowout. The process involves pumping heavyweight drilling mud into the well. This procedure is expected to stop the flow of oil and gas from the well. A further step could be sealing the well completely, often with cement.[1]

In use

The top kill procedure was used to plug flaming oil wells, blown up by retreating Iraqi forces, in 1991, during the Gulf War.[2]

This technique came to prominence during the 2010 Deepwater Horizon oil spill when it was used in an attempt to seal a seafloor oil well after the failure of the blowout preventer.[1] However, it failed to block the flow of oil.[3]