Physics:Experimental Breeder Reactor I

From HandWiki
Short description: Historic decommissioned nuclear reactor in southeast Idaho, United States
Short description: United States historic place
Experimental Breeder Reactor No. 1
EBR-1, August 2012.jpg
Experimental Breeder Reactor Number 1 in Idaho, the first power reactor
Lua error in Module:Location_map at line 522: Unable to find the specified location map definition: "Module:Location map/data/Idaho" does not exist.
LocationButte County, Idaho, US
Nearest cityArco, Idaho
Coordinates [ ⚑ ] : 43°30′41″N 113°00′23″W / 43.51132°N 113.0064°W / 43.51132; -113.0064
Built1950
ArchitectAtomic Energy Commission
NRHP reference #66000307
Significant dates
Added to NRHPOctober 15, 1966[1]
Designated NHLDecember 21, 1965[2]

Experimental Breeder Reactor I (EBR-I) is a decommissioned research reactor and U.S. National Historic Landmark located in the desert about 18 miles (29 km) southeast of Arco, Idaho. It was the world's first breeder reactor.[3] At 1:50 p.m. on December 20, 1951, it became one of the world's first electricity-generating nuclear power plants when it produced sufficient electricity to illuminate four 200-watt light bulbs.[4][5] EBR-I subsequently generated sufficient electricity to power its building, and continued to be used for experimental purposes until it was decommissioned in 1964. The museum is open for visitors from late May until early September[citation needed].

History

As part of the National Reactor Testing Station (since 2005 Idaho National Laboratory), EBR-I's construction started in late 1949. The reactor was designed and constructed by a team led by Walter Zinn at the Argonne National Laboratory[6] Idaho site, known as Argonne-West. In its early stages, the reactor plant was referred to as Chicago Pile 4 (CP-4) and Zinn's Infernal Pile.[7] Installation of the reactor at EBR-I took place in early 1951 (the first reactor in Idaho) and it began power operation on August 24, 1951. On December 20 of that year, atomic energy was successfully harvested at EBR-1 for the first time. The following day, the reactor produced enough power to light the whole building. The power plant produced 200 kW of electricity out of 1.4 MW of heat generated by the reactor.[8]

Part of the core after the 1955 partial meltdown

The design purpose of EBR-I was not to produce electricity but instead to validate nuclear physics theory that suggested that a breeder reactor should be possible. In 1953, experiments revealed the reactor was producing additional fuel during fission, thus confirming the hypothesis. On November 29, 1955, the reactor at EBR-I suffered a partial meltdown during a coolant flow test. The flow test was trying to determine the cause of unexpected reactor responses to changes in coolant flow. It was subsequently repaired for further experiments, which determined that thermal expansion of the fuel rods and the thick plates supporting the fuel rods was the cause of the unexpected reactor response.[9]

Although EBR-I produced the first electricity available in-house, a nearby experimental boiling water reactor plant called BORAX-III (also designed, built, and operated by Argonne National Laboratory) was connected to external loads, powering the nearby city of Arco, Idaho in 1955, the first time a city had been powered solely by nuclear power.[10]

Besides generating the world's first electricity from atomic energy, EBR-I was also the world's first breeder reactor and the first to use plutonium fuel to generate electricity (see also the Clementine nuclear reactor). Correction: The world's first electricity from atomic energy was generated 3 years earlier in September 1948 at the X-10 Graphite Reactor at the Oak Ridge National Lab in Tennessee. EBR-I's initial purpose was to prove Enrico Fermi's fuel breeding principle, a principle that showed a nuclear reactor producing more fuel atoms than consumed. Along with generating electricity, EBR-1 would also prove this principle.[11]

Design

EBR-I used uranium metal fuel and NaK primary coolant.[12] It was in this identical to the initial configuration of the later Dounreay Fast Reactor which first went critical in 1959.

The primary liquid metal coolant flows by gravity from the supply tank through the reactor core, where it absorbs heat. Then, the coolant flows to heat the exchanger, where it gives up this heat to the secondary coolant, another liquid metal. The primary coolant is returned to the supply tank by an electromagnetic pump. The secondary coolant is pumped to the boiler, where it gives up its heat to water, generating steam. This steam passes to the turbine, which is how electricity is produced. This steam the condenses and returned to the boiler by a water pump.[13]

Decommission and legacy

EBR-I was deactivated by Argonne in 1964 and replaced with a new reactor, Experimental Breeder Reactor II.

It was declared a National Historic Landmark in 1965[2][14] with its dedication ceremony held on August 25, 1966, led by President Lyndon Johnson and Glenn T. Seaborg.[15] It was also declared an IEEE Milestone in 2004.[16]

Gallery

See also

References

Citations
  1. "Experimental Breeder Reactor No. 1". NPGallery. National Park Service. https://npgallery.nps.gov/AssetDetail/NRIS/66000307. 
  2. 2.0 2.1 "Experimental Breeder Reactor No. 1". National Historic Landmark summary listing. National Park Service. http://tps.cr.nps.gov/nhl/detail.cfm?ResourceId=198&ResourceType=Building. 
  3. "Breeder reactor" (in en). Breeder reactor. https://www.britannica.com/technology/breeder-reactor. Retrieved 2017-12-31. 
  4. "EBR-I (Experimental Breeder Reactor-I)". Argonne National Laboratory. http://www.ne.anl.gov/About/reactors/frt.shtml. 
  5. Rick Michal (November 2001). "Fifty years ago in December: Atomic reactor EBR-I produced first electricity". Nuclear News. American Nuclear Society. http://www.ans.org/pubs/magazines/nn/docs/2001-11-2.pdf. 
  6. Nuclear Reactors Built, Being Built, or Planned in the United States as of June 30, 1970. U.S. Department of Energy, Office of Scientific and Technical Information. October 31, 1970. doi:10.2172/4115425. https://www.osti.gov/servlets/purl/4115425. 
  7. Argonne’s Nuclear Science and Technology Legacy: Chicago Pile reactors create enduring research legacy part of the Argonne National Laboratory Highlights in the period 1942–1949
  8. "Nuclear energy for peace: the birth of nuclear energetics". http://www.straipsniai.lt/en/Energetics/page/5238. 
  9. The Story of the Borax Nuclear Reactor and the EBR-I Meltdown — Ray Haroldsen ISBN:978-1-56684-706-3
  10. "AEC Press release for BORAX-III lighting Arco, Idaho". U.S. Department of Energy, Argonne National Laboratory. 1999. http://www.ne.anl.gov/About/reactors/borax3/index.shtml. 
  11. "Experimental Breeder Reactor I". ASME. https://www.asme.org/about-asme/who-we-are/engineering-history/landmarks/39-experimental-breeder-reactor-i. 
  12. "Experimental Breeder Reactor I". ASME. https://www.asme.org/wwwasmeorg/media/resourcefiles/aboutasme/who%20we%20are/engineering%20history/landmarks/39-experimental-breeder-reactor-i-1951.pdf. 
  13. "EBR-1 in Photos" (in en). https://www.ans.org/news/article-2096/ebr-1-in-photos/. 
  14. Blanche Higgins Schroer (June 12, 1976). "Experimental Breeder Reactor #1" (PDF). National Register of Historic Places Inventory Nomination Form. National Park Service. https://npgallery.nps.gov/NRHP/GetAsset/NHLS/66000307_text.  and Accompanying 4 photos, from 1975. (1.43 MB)
  15. "EBR-I now open to the public for tours". Idaho National Laboratory. May 26, 2016. https://www.inl.gov/article/experimental-breeder-reactor-i-opens-memorial-day-weekend-for-summer-tours/. 
  16. "Milestones:Experimental Breeder Reactor I, 1951". IEEE Global History Network. IEEE. http://www.ieeeghn.org/wiki/index.php/Milestones:Experimental_Breeder_Reactor_I,_1951. 
Bibliography

External links