Engineering:HTV-X
HTV-X, also known as the New Space Station Resupply Vehicle (Japanese: 新型宇宙ステーション補給機 Hepburn: Shingata Uchū Sutēshon Hokyūki), is a Japanese cargo spacecraft of the Japan Aerospace Exploration Agency (JAXA). Designed as the successor to the H-II Transfer Vehicle (HTV) for International Space Station (ISS) resupply missions, it was first launched on 26 October 2025.[1]
Background
The HTV-X is manufactured by Mitsubishi Heavy Industries with contributions from Mitsubishi Electric.[2] IHI Aerospace provides the propulsion system[3] and American company Sierra Nevada Corporation provides the Common Berthing Mechanism and hatch kit.[4]
Design
HTV-X consists of three main modules, arranged from top to bottom on the launch pad:
- Unpressurised Cargo Module: A 3.8-metre-long (12 ft 6 in) open-top cylinder with shelving for payload attachment. Cargo is mounted externally rather than inside the spacecraft, allowing larger items limited only by the launch vehicle fairing and increasing capacity compared to the original HTV.
- Service Module: A 2.7-metre-long (8 ft 10 in) unit capable of independent operation. It includes two deployable solar arrays generating 1 kW of power (replacing the original HTV’s 200 W side-mounted panels), batteries with a 3 kW peak output (up from 2 kW), and upgraded communications with a 1 Mbit/s link alongside the previous 8 kbit/s channel. HTV-X omits a main engine, using a ring of reaction control system (RCS) thrusters for propulsion, and mounts some components externally for easier astronaut access.[5]
- Pressurised Logistics Module: A 3.5-metre-long (11 ft 6 in) section with an internal volume of 39.6 cubic metres (1,400 cu ft)[6] and a payload capacity of 4,070 kilograms (8,970 lb).[7] Identical in design to the original HTV, it is positioned at the bottom of the stack to improve mass distribution. An early concept included a side hatch for late cargo loading, but the final 2021 design removed it; late access now uses the ISS docking hatch, requiring a new Payload Adapter Fitting (PAF) on the H3 rocket’s upper stage.[8]
The HTV-X measures 8 metres (26 ft 3 in) in length. The H3 rocket’s payload fairing and dispenser were widened to 4.4 metres (14 ft 5 in) to allow alternate modules, increase structural strength, and accommodate the originally planned side hatch.[7][9]
Reusing the pressurised logistics module design reduces development cost and risk. Concentrating RCS thrusters and solar arrays on the service module simplifies wiring and piping, lowering weight and manufacturing cost. External loading of unpressurised cargo enables larger payloads, limited only by the fairing. The goal is to halve costs while maintaining or extending HTV capabilities.[10] Simplification was expected to reduce launch mass to 15,500 kilograms (34,200 lb) from HTV’s 16,500 kilograms (36,400 lb), while increasing maximum cargo mass to 5,850 kilograms (12,900 lb) from 4,000 kilograms (8,800 lb).[9]
Other proposed payloads for replacing the unpressurised cargo module during ISS resupply missions include external sensor packages, an IDSS connector for automated docking, satellite rendezvous trials, piggyback small satellites, station return capsules, assembly of lunar mission modules, and acting as a space tug to store resources such as recyclable materials, excess propellant, and spare parts in orbit for future use.[9]
History
In May 2015, Japan's Ministry of Education, Culture, Sports, Science and Technology announced a proposal to replace the HTV with an improved, cost-reduced version preliminarily called HTV-X.[11][12] The proposal of HTV-X in 2015 was as follows:[10]
- To re-use the design of HTV's Pressurised Logistics Carrier (PLC) as much as possible, except for adding a side hatch for late cargo access after the spacecraft-launch vehicle integration.
- To replace the Unpressurised Logistics Carrier (ULC), Avionics Module, and Propulsion Module with a new Service Module.
- To load the unpressurised cargo on top of the Service Module rather than inside the spacecraft.
In December 2015, the plan to develop HTV-X was approved by the Strategic Headquarters for Space Policy of the Cabinet Office, targeting launch in fiscal year 2021 for the flight of HTV-X1 (Technical Demonstration Vehicle) by the H3 Launch Vehicle.[13][9] As of June 2019[update], NASA's Flight Planning Integration Panel had set the launch of HTV-X1 for February 2022.[14]
With the Japan-US Open Platform Partnership Program (JP-US OP3) agreement in December 2015 to extend cooperation on ISS operations through 2024, Japan will provide its share of ISS operation costs with the form of transportation by HTV-X, and also be given an opportunity to develop a possible small return capsule.[15]
A design change in 2021 removed the side hatch of the pressurised module.[8]
As of 2021[update], an evolved version of HTV-X called HTV-XG is being considered for transporting cargo to the Lunar Gateway as part of the Artemis program.[16]
Flights
As of April 2025[update], three flights are planned to resupply the ISS.[8]
| HTV | Launch date/time (UTC) | Berth date/time (UTC) | Carrier rocket | Reentry date/time (UTC) | Outcome |
|---|---|---|---|---|---|
| HTV-X1 | 26 October 2025, 00:00:15[1] | 30 October 2025, 11:10[17] | H3-24W | January 2026 (planned) | In progress |
| HTV-X2 | JFY2026[18] | H3-24W | Planned | ||
| HTV-X3 | JFY2026[18] | H3-24W | Planned |
As of December 2024[update], HTV-X4 and HTV-X5 are tentatively planned for launch in JFY2027–JFY2029.[19]
See also
References
- ↑ 1.0 1.1 "H3ロケット7号機による新型宇宙ステーション補給機1号機(HTV-X1)の 打上げ結果" [Launch result of new unmanned cargo transfer spacecraft HTV-X1 aboard H3 rocket flight 7] (Press release) (in 日本語). JAXA. 26 October 2025.
- ↑ Tsujita, Daisuke; Fujiwara, Satoshi; Uchida, Takeshi; Nakajima, Atsushi (December 2021). "Development Status and Future Plans of Next Generation Cargo Transfer Spacecraft HTV-X". Mitsubishi Heavy Industries Technical Review 58 (4). https://www.mhi.co.jp/technology/review/pdf/e584/e584060.pdf.
- ↑ "Error: no
|title=specified when using {{Cite web}}" (in ja). JAXA. 12 December 2024. https://humans-in-space.jaxa.jp/news/detail/004376.html. - ↑ "Ozmens' Sierra Nevada Corporation to Provide Hardware for Japanese HTV-X International Space Station Missions". Sierra Nevada Corporation (Press release). May 31, 2019. Retrieved 2024-09-06.
- ↑ "新型宇宙ステーション補給機(HTV-X(仮称))プロジェクト移行審査の結果について" (in ja). 6 December 2017. http://www.jaxa.jp/press/2017/12/files/20171206_HTV-X.pdf.
- ↑ Sakashita, Tetsuya; Kamiya, Takashi (July 11, 2010). "How the HTV Cargo Vehicle Is Fully Stuffed – Cargo Loading Capability Enhancement and Related Issues" (in en). 40th International Conference on Environmental Systems (American Institute of Aeronautics and Astronautics). doi:10.2514/6.2010-6046. ISBN 978-1-60086-957-0. https://arc.aiaa.org/doi/10.2514/6.2010-6046.
- ↑ 7.0 7.1 "HTV-X". JAXA. https://humans-in-space.jaxa.jp/en/htv-x/.
- ↑ 8.0 8.1 8.2 "Error: no
|title=specified when using {{Cite web}}" (in Japanese). Ministry of Education, Culture, Sports, Science. 9 February 2021. https://www.mext.go.jp/kaigisiryo/content/20210209-mxt_uchukai01-000012703_10.pdf. - ↑ 9.0 9.1 9.2 9.3 JAXA (14 July 2016). "Error: no
|title=specified when using {{Cite web}}" (in ja). http://www.jaxa.jp/press/2016/07/files/20160714_htv-x_01_j.pdf. - ↑ 10.0 10.1 "Error: no
|title=specified when using {{Cite web}}" (in ja). July 2, 2015. http://www.mext.go.jp/b_menu/shingi/gijyutu/gijyutu2/059/shiryo/__icsFiles/afieldfile/2015/07/16/1359656_5.pdf. - ↑ "Error: no
|title=specified when using {{Cite web}}". Research and Development Division, Ministry of Education, Culture, Sports, Science and Technology. May 20, 2015. http://www.mext.go.jp/b_menu/shingi/gijyutu/gijyutu2/071/shiryo/__icsFiles/afieldfile/2015/05/28/1358152_1.pdf. - ↑ "国際宇宙ステーション計画を含む有人計画について" (in ja). June 3, 2015. http://www8.cao.go.jp/space/comittee/27-kiban/kiban-dai5/siryou2.pdf.
- ↑ "Error: no
|title=specified when using {{Cite web}}" (in ja). Strategic Headquarters for Space Policy. 8 December 2015. https://www8.cao.go.jp/space/plan/plan2/kaitei_fy27/kaitei_fy27.pdf. - ↑ Gebhardt, Chris (20 June 2019). "Station mission planning reveals new target Commercial Crew launch dates". https://www.nasaspaceflight.com/2019/06/station-planning-new-crew-launch-dates/. "The new HTV is known as HTV-X and is now planned to make its inaugural trip to the Station in February 2022."
- ↑ "Japan – United States Space Cooperation and the International Space Station Program". Ministry of Education, Culture, Sports, Science, and Technology. 22 December 2015. http://www.mext.go.jp/b_menu/houdou/27/12/__icsFiles/afieldfile/2015/12/22/1365568_01_1.pdf.
- ↑ JAXA (30 June 2021). "Error: no
|title=specified when using {{Cite web}}" (in Japanese). Ministry of Education, Cultura, Sports and Technology. https://www.mext.go.jp/kaigisiryo/content/0210630-mxt_uchukai01-000016486_5.pdf. - ↑ "Successful berthing of the HTV-X1 to the International Space Station (ISS)". JAXA. 30 October 2025. https://global.jaxa.jp/press/2025/10/20251030-1_e.html.
- ↑ 18.0 18.1 "宇宙基本計画⼯程表 (令和5年度改訂)" (in ja). Cabinet Office. 22 December 2023. p. 45. https://www8.cao.go.jp/space/plan/plan2/kaitei_fy05/kaitei_fy0512.pdf.
- ↑ "Error: no
|title=specified when using {{Cite web}}" (in ja). Cabinet Office, Japan. 24 December 2024. https://www8.cao.go.jp/space/plan/plan2/kaitei_fy06/kaitei_fy0612.pdf.
External links
- No URL found. Please specify a URL here or add one to Wikidata.
Template:International Space Station
