Engineering:List of commercial nuclear reactors
This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of December 2023, there are 413 operable power reactors in the world, with a combined electrical capacity of 371.5 GW. Additionally, there are 61 reactors under construction and 110 reactors planned, with a combined capacity of 68 GW and 110 GW, respectively, while 321 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of Nuclear Reprocessing Plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]
In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]
Argentina
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Atucha[4] | 1 | PHWR | Siemens-KWU | Operational | 335 | 1 Jun 1968 | 24 Jun 1974 | |
2 | PHWR | Siemens-KWU | Operational | 692 | 14 Jul 1981 | 27 Jun 2014 | ||
3 | PWR | Hualong One | Planned[5] | 1200 | ||||
Embalse[6] | 1 | PHWR | CANDU-6 | Operational | 600 | 1 Apr 1974 | 20 Jan 1984 | (2049)[7] |
CAREM | 1 | PWR | CAREM25 | Under construction | 25 | 8 Feb 2014 |
Armenia
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Metsamor | 1 | PWR | VVER-440/V-270 | Shut down | 376 | 1 Jul 1969 | 6 Oct 1977 | 25 Feb 1989 |
2 | PWR | VVER-440/V-270 | Operational | 375 | 1 Jul 1975 | 3 May 1980 | (2026)[8] |
Austria
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Zwentendorf | 1 | BWR | BWR-69 (KWU) | Finished; never entered service | 878 | Apr 1972 | 5 Nov 1978 |
Bangladesh
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Rooppur | 1 | PWR | VVER-1200/V-523 | Under construction | 1080 | 30 Nov 2017[9] | (2024)[10] | |
2 | PWR | VVER-1200/V-523 | Under construction | 1080 | 14 Jul 2018 | (2025) |
Belarus
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Ostrovets | 1 | PWR | VVER-1200/V-491 | Operational | 1109 | 6 Nov 2013 | 10 Jun 2021[11] | |
2 | PWR | VVER-1200/V-491 | Operational | 1109 | 24 Apr 2014 | 1 Nov 2023[12] | ||
Minsk | 1 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 | |
2 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 |
Belgium
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
SCK•CEN | 1 | PWR | Westinghouse (WH) BR-3 | Decommissioned | 10 | 1 Nov 1957 | 10 Oct 1962 | 30 Jun 1987 |
Doel | 1 | PWR | WH 2 loops | Operational | 445 | 1 Jul 1969 | 15 Feb 1975 | (2025) |
2 | PWR | WH 2 loops | Operational | 445 | 1 Sep 1971 | 1 Dec 1975 | (2025) | |
3 | PWR | Framatome 3 loops | Shut down | 1006 | 1 Jan 1975 | 1 Oct 1982 | 23 Sep 2022[13] | |
4 | PWR | Belgian firms plus WH 3 loops | Operational | 1039 | 1 Dec 1978 | 1 Jul 1985 | (2035)[14] | |
Tihange | 1 | PWR | Framatome 3 loops | Operational | 962 | 1 Jun 1970 | 1 Oct 1975 | (2025) |
2 | PWR | Framatome 3 loops | Shut down | 1008 | 1 Apr 1976 | 1 Jun 1983 | 31 Jan 2023[15] | |
3 | PWR | Belgian firms plus WH 3 loops | Operational | 1046 | 1 Nov 1978 | 1 Sep 1985 | (2035) |
Brazil
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Angra | 1 | PWR | WH 2 loops | Operational | 609 | 1 May 1971 | 1 Jan 1985 | |
2 | PWR | Pre-Konvoi | Operational | 1275 | 1 Jan 1976 | 1 Feb 2001 | ||
3 | PWR | Pre-Konvoi | Under construction | 1245 | 1 Jun 2010 | (2028)[16] |
Bulgaria
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Kozloduy | 1 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 28 Oct 1974 | 31 Dec 2002 |
2 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 10 Nov 1975 | 31 Dec 2002 | |
3 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jan 1981 | 31 Dec 2006 | |
4 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jun 1982 | 31 Dec 2006 | |
5 | PWR | VVER-1000/V-320 | Operational | 1003 | 9 Jul 1980 | 23 Dec 1988 | ||
6 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Apr 1982 | 30 Dec 1993 | ||
7 | PWR | AP1000 | Planned[17] | 1150 | (2033)[17] | |||
8 | PWR | AP1000 | Planned[17] | 1150 | ||||
Belene | 1 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
||
2 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
Canada
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Pickering | 1 | PHWR | CANDU 500A | Operational | 515 | Jun 1966 | 29 Jul 1971 | (2024) |
2 | PHWR | CANDU 500A | Shut down | 515 | Sep 1966 | 30 Dec 1971 | 1997[18] | |
3 | PHWR | CANDU 500A | Shut down | 515 | Dec 1967 | 1 Jun 1972 | 1997 | |
4 | PHWR | CANDU 500A | Operational | 515 | May 1968 | 17 Jun 1973 | (2024) | |
5 | PHWR | CANDU 500B | Operational | 516 | Nov 1974 | 10 May 1983 | (2026) | |
6 | PHWR | CANDU 500B | Operational | 516 | Oct 1975 | 1 Feb 1984 | (2026) | |
7 | PHWR | CANDU 500B | Operational | 516 | Mar 1976 | 1 Jan 1985 | (2026) | |
8 | PHWR | CANDU 500B | Operational | 516 | Sep 1976 | 28 Feb 1986 | (2026)[19] | |
Darlington | 1 | PHWR | CANDU 850 | Operational | 878 | Apr 1982 | 14 Nov 1992 | (2052) |
2 | PHWR | CANDU 850 | Operational | 878 | Sep 1981 | 9 Oct 1990 | (2050) | |
3 | PHWR | CANDU 850 | Operational | 878 | Sep 1984 | 14 Feb 1993 | (2053) | |
4 | PHWR | CANDU 850 | Operational | 878 | Jul 1985 | 14 Jun 1993 | (2053) | |
5[20] | BWR | BWRX-300 | Planned | 300 | (2023) | (2028) | ||
6[20] | BWR | BWRX-300 | Planned | 300 | (2023) | (2028) | ||
7 | BWR | BWRX-300 | Planned | 300 | (2023) | (2029) | ||
8 | BWR | BWRX-300 | Planned | 300 | (2023) | (2029)[21] | ||
Bruce | 1 | PHWR | CANDU 791 | Operational | 823 | Jun 1971 | 1 Sep 1977 | (2043) |
2 | PHWR | CANDU 791 | Operational | 823[22] | Dec 1970 | 1 Sep 1977 | (2043) | |
3 | PHWR | CANDU 750A | Operational | 817 | Jul 1972 | 1 Feb 1978 | (2064)[23] | |
4 | PHWR | CANDU 750A | Operational | 817 | Sep 1972 | 18 Jan 1979 | (2064) | |
5 | PHWR | CANDU 750B | Operational | 817 | Jun 1978 | 1 Mar 1985 | (2064) | |
6 | PHWR | CANDU 750B | Operational | 880[24] | Jan 1978 | 15 Sep 1984 | (2064) | |
7 | PHWR | CANDU 750B | Operational | 817 | May 1979 | 10 Apr 1986 | (2064) | |
8 | PHWR | CANDU 750B | Operational | 817 | Aug 1979 | 22 May 1987 | (2064) | |
NPD | 1 | PHWR | CANDU | Shut down | 19 | Jan 1958 | 4 Jun 1962 | 1987 |
Douglas Point | 1 | PHWR | CANDU 200 | Shut down | 200 | Feb 1960 | 26 Sep 1968 | 4 May 1984 |
Gentilly | 1 | BWR | CANDU BLWR 250 | Shut down | 250 | Sep 1966 | 1 May 1972 | 1977 |
2 | PHWR | CANDU-6 | Shut down | 635 | Apr 1974 | 1 Oct 1983 | 28 Dec 2012 | |
Point Lepreau | 1 | PHWR | CANDU-6 | Operational | 635 | May 1975 | 1 Feb 1983 | (2041) |
China
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bailong | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Changjiang | I-1 | PWR | CNP-600 | Operational | 601 | 25 Apr 2010 | 25 Dec 2015 | |
I-2 | PWR | CNP-600 | Operational | 601 | 21 Nov 2010 | 20 Jun 2016 | ||
I-3[25] | PWR | Hualong One | Under construction | 1200 | 31 Mar 2021[26] | |||
I-4[25] | PWR | Hualong One | Under construction | 1200 | 31 Mar 2021[26] | |||
II-1 | PWR | ACP-100 | Under construction | 100 | 13 Jul 2021 | |||
II-2 | PWR | ACP-100 | Planned | 100 | ||||
Daya Bay | 1 | PWR | M-310 | Operational | 944 | 7 Aug 1987 | 1 Feb 1994 | |
2 | PWR | M-310 | Operational | 944 | 7 Apr 1988 | 6 May 1994 | ||
Fangchenggang | 1 | PWR | CPR-1000 | Operational | 1000 | 30 Jul 2010 | 25 Oct 2015 | |
2 | PWR | CPR-1000 | Operational | 1000 | 23 Dec 2010 | 15 Jul 2016 | ||
3 | PWR | Hualong One | Operational | 1000 | 24 Dec 2015 | 25 Mar 2023 | ||
4 | PWR | Hualong One | Under construction | 1000 | 24 Dec 2016 | (2024) | ||
5 | PWR | Hualong One | Planned | 1117 | ||||
6 | PWR | Hualong One | Planned | 1117 | ||||
Fangjiashan | 1 | PWR | CPR-1000 | Operational | 1012 | 26 Dec 2008 | 15 Dec 2014 | |
2 | PWR | CPR-1000 | Operational | 1012 | 17 Jul 2009 | 12 Feb 2015 | ||
Fuqing | 1 | PWR | CPR-1000 | Operational | 1000 | 21 Nov 2008 | 19 Nov 2014 | |
2 | PWR | CPR-1000 | Operational | 1000 | 17 Jun 2009 | 15 Oct 2015 | ||
3 | PWR | CPR-1000 | Operational | 1000 | 31 Dec 2010 | 7 Sep 2016 | ||
4 | PWR | CPR-1000 | Operational | 1000 | 17 Nov 2012 | 31 Jul 2017 | ||
5 | PWR | Hualong One | Operational | 1000 | 15 Apr 2015 | 30 Jan 2021[27] | ||
6 | PWR | Hualong One | Operational | 1000 | 22 Dec 2015 | 25 Mar 2022[28] | ||
Haiyang | 1 | PWR | AP1000 | Operational | 1170 | 24 Sep 2009 | 23 Oct 2018[29] | |
2 | PWR | AP1000 | Operational | 1170 | 20 Jun 2010 | 9 Jan 2019[30] | ||
3 | PWR | CAP-1000 | Under construction | 1100 | 7 Jul 2022[31] | |||
4 | PWR | CAP-1000 | Under construction | 1100 | 22 Apr 2023[32] | |||
Haixing[33] | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Hongyanhe | 1 | PWR | CPR-1000 | Operational | 1061 | 18 Aug 2007 | 6 Jun 2013 | |
2 | PWR | CPR-1000 | Operational | 1061 | 28 Mar 2008 | 13 May 2014 | ||
3 | PWR | CPR-1000 | Operational | 1061 | 7 Mar 2009 | 23 Mar 2015 | ||
4 | PWR | CPR-1000 | Operational | 1061 | 15 Aug 2009 | 1 Apr 2016 | ||
5 | PWR | ACPR-1000 | Operational | 1061 | 29 Mar 2015 | 2 Aug 2021[34] | ||
6 | PWR | ACPR-1000 | Operational | 1061 | 24 Jul 2015 | 23 Jun 2022 | ||
Lianjiang[35] | 1 | PWR | CAP-1000 | Under construction | 1100 | 27 Sep 2023 | ||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Ling Ao | 1 | PWR | M-310 | Operational | 950 | 15 May 1997 | 28 May 2002 | |
2 | PWR | M-310 | Operational | 950 | 28 Nov 1997 | 8 Jan 2003 | ||
3 | PWR | CPR-1000 | Operational | 1007 | 15 Dec 2005 | 15 Sep 2010 | ||
4 | PWR | CPR-1000 | Operational | 1007 | 15 Jun 2006 | 7 Aug 2011 | ||
Lufeng | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
3 | PWR | CAP-1000 | Planned | 1100 | ||||
4 | PWR | CAP-1000 | Planned | 1100 | ||||
5 | PWR | Hualong One | Under construction | 1000 | 8 Sep 2022[36] | |||
6 | PWR | Hualong One | Under construction | 1000 | 26 Aug 2023[37] | |||
Ningde | 1 | PWR | CPR-1000 | Operational | 1018 | 18 Feb 2008 | 15 Apr 2013 | |
2 | PWR | CPR-1000 | Operational | 1018 | 12 Nov 2008 | 4 May 2014 | ||
3 | PWR | CPR-1000 | Operational | 1018 | 8 Jan 2010 | 10 Jun 2015 | ||
4 | PWR | CPR-1000 | Operational | 1018 | 29 Sep 2010 | 29 Mar 2016 | ||
5 | PWR | Hualong One | Planned | 1080 | ||||
6 | PWR | Hualong One | Planned | 1080 | ||||
Pengze | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Qinshan | I-1 | PWR | CNP-300 | Operational | 308 | 20 Mar 1985 | 1 Apr 1994 | |
II-1 | PWR | CNP-600 | Operational | 610 | 2 Jun 1996 | 15 Apr 2002 | ||
II-2 | PWR | CNP-600 | Operational | 610 | 1 Apr 1997 | 3 May 2004 | ||
II-3 | PWR | CNP-600 | Operational | 619 | 28 Apr 2006 | 5 Oct 2010 | ||
II-4 | PWR | CNP-600 | Operational | 619 | 28 Jan 2007 | 30 Dec 2011 | ||
III-1 | PHWR | CANDU-6 | Operational | 677 | 8 Jun 1998 | 31 Dec 2002 | ||
III-2 | PHWR | CANDU-6 | Operational | 677 | 25 Sep 1998 | 24 Jul 2003 | ||
San'ao[38] | 1 | PWR | Hualong One | Under construction | 1117 | 31 Dec 2020 | ||
2 | PWR | Hualong One | Under construction | 1000 | 30 Dec 2021[39] | |||
Sanmen | 1 | PWR | AP1000 | Operational | 1157 | 19 Apr 2009 | 21 Sep 2018[40] | |
2 | PWR | AP1000 | Operational | 1157 | 15 Dec 2009 | 5 Nov 2018[41] | ||
3 | PWR | CAP-1000 | Under construction | 1163 | 28 Jun 2022[42] | |||
4 | PWR | CAP-1000 | Under construction | 1100 | 22 Mar 2023[43] | |||
Shidaowan | I-1 | HTGR | HTR-PM | Operational | 200 | 9 Dec 2012 | 6 Dec 2023[44] | |
II-1 | PWR | CAP-1400 | Under construction | 1500 | 19 Jun 2019 | (2025) | ||
II-2 | PWR | CAP-1400 | Under construction | 1500 | 21 Apr 2020 | (2025) | ||
Taipingling | 1 | PWR | Hualong One | Under construction | 1116 | 26 Dec 2019 | ||
2 | PWR | Hualong One | Under construction | 1116 | 15 Oct 2020[45] | |||
Taishan | 1 | PWR | EPR | Operational | 1660 | 18 Nov 2009 | 14 Dec 2018[46] | |
2 | PWR | EPR | Operational | 1660 | 15 Apr 2010 | 7 Sep 2019[47] | ||
3 | PWR | EPR | Planned | 1660 | ||||
4 | PWR | EPR | Planned | 1660 | ||||
Taohuajiang | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
3 | PWR | CAP-1000 | Planned | 1100 | ||||
4 | PWR | CAP-1000 | Planned | 1100 | ||||
Tianwan | 1 | PWR | VVER-1000/V-428 | Operational | 990 | 20 Oct 1999 | 17 May 2007 | |
2 | PWR | VVER-1000/V-428 | Operational | 990 | 20 Sep 2000 | 16 Aug 2007 | ||
3 | PWR | VVER-1000/V-428M | Operational | 1045 | 27 Dec 2012 | 14 Feb 2018 | ||
4 | PWR | VVER-1000/V-428M | Operational | 1045 | 27 Sep 2013 | 22 Dec 2018[48] | ||
5 | PWR | ACPR-1000 | Operational | 1000 | 27 Dec 2015 | 8 Sep 2020[49] | ||
6 | PWR | ACPR-1000 | Operational | 1000 | 7 Sep 2016 | 3 Jun 2021[50] | ||
7 | PWR | VVER-1200/V-491 | Under construction | 1150 | 19 May 2021 | (2027–2028) | ||
8 | PWR | VVER-1200/V-491 | Under construction | 1150 | 25 Feb 2022[51] | (2027–2028) | ||
Xianning | 1 | PWR | CAP-1000 | Planned | 1100 | |||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
Xiapu[52] | I-1 | SFR | CFR-600 | Under construction | 642 | 29 Dec 2017 | (2023)[53] | |
I-2 | SFR | CFR-600 | Under construction | 642 | 27 Dec 2020[53] | |||
II-1 | PWR | CAP-1000 | Planned | 1100 | ||||
II-2 | PWR | CAP-1000 | Planned | 1100 | ||||
II-3 | PWR | CAP-1000 | Planned | 1100 | ||||
II-4 | PWR | CAP-1000 | Planned | 1100 | ||||
Xudabao | 1 | PWR | CAP-1000 | Under construction | 1250 | 15 Nov 2023[54] | ||
2 | PWR | CAP-1000 | Planned | 1100 | ||||
3 | PWR | VVER-1200/V-491 | Under construction | 1150 | 28 Jul 2021[55] | (2027) | ||
4 | PWR | VVER-1200/V-491 | Under construction | 1150 | 19 May 2022[56] | (2028) | ||
Yangjiang | 1 | PWR | CPR-1000 | Operational | 1000 | 16 Dec 2008 | 25 Mar 2014 | |
2 | PWR | CPR-1000 | Operational | 1000 | 4 Jun 2009 | 8 Jun 2015 | ||
3 | PWR | CPR-1000+ | Operational | 1000 | 15 Nov 2010 | 1 Jan 2016 | ||
4 | PWR | CPR-1000+ | Operational | 1000 | 17 Nov 2012 | 15 Mar 2017 | ||
5 | PWR | ACPR-1000 | Operational | 1000 | 18 Sep 2013 | 12 Jul 2018[57] | ||
6 | PWR | ACPR-1000 | Operational | 1000 | 23 Dec 2013 | 24 Jul 2019 | ||
Zhangzhou | 1 | PWR | Hualong One | Under construction | 1126 | 16 Oct 2019[58] | ||
2 | PWR | Hualong One | Under construction | 1126 | 4 Sep 2020[45] | |||
3 | PWR | Hualong One | Planned | 1000 | ||||
4 | PWR | Hualong One | Planned | 1000 |
Cuba
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Juragua | 1 | PWR | VVER-440/V-318 | Unfinished | 440 | 1983 | 5 Sep 1992 | |
2 | PWR | VVER-440/V-318 | Unfinished | 440 | 1985 | 5 Sep 1992 |
Czech Republic
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Dukovany | 1 | PWR | VVER-440/V-213 | Operational | 468 | 1 Jan 1979 | 3 May 1985 | |
2 | PWR | VVER-440/V-213 | Operational | 471 | 1 Jan 1979 | 21 Mar 1986 | ||
3 | PWR | VVER-440/V-213 | Operational | 468 | 1 Mar 1979 | 20 Dec 1986 | ||
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Mar 1979 | 19 Jul 1987 | ||
5 | PWR | TBD | Planned | 1200 | ||||
Temelín | 1 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 10 Jun 2002 | |
2 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 18 Apr 2003 |
Egypt
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
El Dabaa | 1 | PWR | VVER-1200/V-529 | Under construction | 1200 | 20 Jul 2022[59] | (2028) | |
2 | PWR | VVER-1200/V-529 | Under construction | 1200 | 19 Nov 2022[60] | |||
3 | PWR | VVER-1200/V-529 | Under construction | 1200 | 3 May 2023[61] | |||
4 | PWR | VVER-1200/V-529 | Under construction | 1200 | 23 Jan 2024 |
Finland
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW)[62] |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Hanhikivi | 1 | PWR | VVER-1200/V-491 | Cancelled | 1200 | (2023) | (2029) | 2 May 2022[63][64] |
Loviisa | 1 | PWR | VVER-440/V-213 | Operational | 507 | 1 May 1971 | 9 May 1977 | |
2 | PWR | VVER-440/V-213 | Operational | 507 | 1 Aug 1972 | 5 Jan 1981 | ||
Olkiluoto | 1 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Feb 1974 | 10 Oct 1979 | |
2 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Nov 1975 | 10 Jul 1982[65] | ||
3 | PWR | EPR | Operational | 1600 | 12 Aug 2005 | 16 Apr 2023[66] |
France
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Belleville | 1 | PWR | P4 REP 1300 | Operational | 1310 | 1 May 1980 | 1 Jun 1988 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Aug 1980 | 1 Jan 1989 | ||
Blayais | 1 | PWR | CP1 | Operational | 910 | 1 Jan 1977 | 1 Dec 1981 | |
2 | PWR | CP1 | Operational | 910 | 1 Jan 1977 | 1 Feb 1983 | ||
3 | PWR | CP1 | Operational | 910 | 1 Apr 1978 | 14 Nov 1983 | ||
4 | PWR | CP1 | Operational | 910 | 1 Apr 1978 | 1 Oct 1983 | ||
Brennilis | 1 | HWGCR | Shut down/in decommissioning | 70 | 1 Jul 1962 | 1 Jun 1968 | 31 Jul 1985 | |
Bugey | 1 | GCR | UNGG | Shut down | 540 | 1 Dec 1965 | 1 Jul 1972 | 27 May 1994 |
2 | PWR | CP0 | Operational | 910 | 1 Nov 1972 | 1 Mar 1979 | ||
3 | PWR | CP0 | Operational | 910 | 1 Sep 1973 | 1 Mar 1979 | ||
4 | PWR | CP0 | Operational | 880 | 1 Jun 1974 | 1 Jul 1979 | ||
5 | PWR | CP0 | Operational | 880 | 1 Jul 1974 | 3 Jan 1980 | ||
6 | PWR | EPR2 | Planned | 1670 | ||||
7 | PWR | EPR2 | Planned | 1670 | ||||
Cattenom | 1 | PWR | P4 REP 1300 | Operational | 1300 | 29 Oct 1979 | 1 Apr 1987 | |
2 | PWR | P4 REP 1300 | Operational | 1300 | 28 Jul 1980 | 1 Feb 1988 | ||
3 | PWR | P4 REP 1300 | Operational | 1300 | 15 Jun 1982 | 1 Feb 1991 | ||
4 | PWR | P4 REP 1300 | Operational | 1300 | 28 Sep 1983 | 1 Jan 1992 | ||
Chinon | A-1 | GCR | UNGG | Shut down | 70 | 1 Feb 1957 | 1 Feb 1964 | 16 Apr 1973 |
A-2 | GCR | UNGG | Shut down | 180 | 1 Aug 1959 | 24 Feb 1965 | 14 Jun 1985 | |
A-3 | GCR | UNGG | Shut down | 360 | 1 Mar 1961 | 4 Aug 1966 | 15 Jun 1990 | |
B-1 | PWR | CP2 | Operational | 905 | 1 Mar 1977 | 1 Feb 1984 | ||
B-2 | PWR | CP2 | Operational | 905 | 1 Mar 1977 | 1 Aug 1984 | ||
B-3 | PWR | CP2 | Operational | 905 | 1 Oct 1980 | 4 Mar 1987 | ||
B-4 | PWR | CP2 | Operational | 905 | 1 Feb 1981 | 1 Apr 1988 | ||
Chooz | A-1 | PWR | CHOOZ-A | Decommissioned | 305 | 1 Jan 1962 | 15 Apr 1967 | 30 Oct 1991 |
B-1 | PWR | N4 REP 1450 | Operational | 1500 | 1 Jan 1984 | 15 May 2000 | ||
B-2 | PWR | N4 REP 1450 | Operational | 1500 | 1 Jan 1984 | 15 May 2000 | ||
Civaux | 1 | PWR | N4 REP 1450 | Operational | 1495 | 15 Oct 1988 | 29 Jan 2002 | |
2 | PWR | N4 REP 1450 | Operational | 1495 | 1 Apr 1991 | 23 Apr 2002 | ||
Cruas | 1 | PWR | CP2 | Operational | 915 | 1 Aug 1978 | 2 Apr 1984 | |
2 | PWR | CP2 | Operational | 915 | 15 Nov 1978 | 1 Apr 1985 | ||
3 | PWR | CP2 | Operational | 915 | 15 Apr 1979 | 10 Sep 1984 | ||
4 | PWR | CP2 | Operational | 915 | 1 Oct 1979 | 11 Feb 1985 | ||
Dampierre | 1 | PWR | CP1 | Operational | 890 | 1 Feb 1975 | 10 Sep 1980 | |
2 | PWR | CP1 | Operational | 890 | 1 Apr 1975 | 16 Feb 1981 | ||
3 | PWR | CP1 | Operational | 890 | 1 Sep 1975 | 27 May 1981 | ||
4 | PWR | CP1 | Operational | 890 | 1 Dec 1975 | 20 Nov 1981 | ||
Fessenheim | 1 | PWR | CP0 | Shut down | 880 | 1 Sep 1971 | 1 Jan 1978 | 22 Feb 2020 |
2 | PWR | CP0 | Shut down | 880 | 1 Feb 1972 | 1 Apr 1978 | 29 Jun 2020 | |
Flamanville | 1 | PWR | P4 REP 1300 | Operational | 1330 | 1 Dec 1979 | 1 Dec 1986 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 May 1980 | 9 Mar 1987 | ||
3 | PWR | EPR | Under construction | 1600 | 3 Dec 2007 | (2024)[67] | ||
Golfech | 1 | PWR | P4 REP 1300 | Operational | 1310 | 17 Nov 1982 | 1 Feb 1991 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Oct 1984 | 4 Mar 1994 | ||
Gravelines | 1 | PWR | CP1 | Operational | 910 | 1 Feb 1975 | 25 Nov 1980 | |
2 | PWR | CP1 | Operational | 910 | 1 Mar 1975 | 1 Dec 1980 | ||
3 | PWR | CP1 | Operational | 910 | 1 Dec 1975 | 1 Jun 1981 | ||
4 | PWR | CP1 | Operational | 910 | 1 Apr 1976 | 1 Oct 1981 | ||
5 | PWR | CP1 | Operational | 910 | 1 Oct 1979 | 15 Jan 1985 | ||
6 | PWR | CP1 | Operational | 910 | 1 Oct 1979 | 25 Oct 1985 | ||
7 | PWR | EPR2 | Planned | 1670 | ||||
8 | PWR | EPR2 | Planned | 1670 | ||||
Nogent | 1 | PWR | P4 REP 1300 | Operational | 1310 | 26 May 1981 | 24 Feb 1988 | |
2 | PWR | P4 REP 1300 | Operational | 1310 | 1 Jan 1982 | 1 May 1989 | ||
Paluel | 1 | PWR | P4 REP 1300 | Operational | 1330 | 15 Aug 1977 | 1 Dec 1985 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 Jan 1978 | 1 Dec 1985 | ||
3 | PWR | P4 REP 1300 | Operational | 1330 | 1 Feb 1979 | 1 Feb 1986 | ||
4 | PWR | P4 REP 1300 | Operational | 1330 | 1 Feb 1980 | 1 Jun 1986 | ||
Penly | 1 | PWR | P4 REP 1300 | Operational | 1330 | 1 Sep 1982 | 1 Dec 1990 | |
2 | PWR | P4 REP 1300 | Operational | 1330 | 1 Aug 1984 | 1 Nov 1992 | ||
3 | PWR | EPR2 | Planned | 1670 | (2024) | |||
4 | PWR | EPR2 | Planned | 1670 | (2024)[68] | |||
Phénix | 1 | FBR | PH-250 | Shut down | 130 | 1 Nov 1968 | 14 Jul 1974 | 1 Feb 2010 |
Saint-Alban | 1 | PWR | P4 REP 1300 | Operational | 1335 | 29 Jan 1979 | 1 May 1986 | |
2 | PWR | P4 REP 1300 | Operational | 1335 | 31 Jul 1979 | 1 Mar 1987 | ||
Saint-Laurent | A-1 | GCR | UNGG | Shut down | 390 | 1 Oct 1963 | 1 Jun 1969 | 18 Apr 1990 |
A-2 | GCR | UNGG | Shut down | 465 | 1 Jan 1966 | 1 Nov 1971 | 27 May 1992 | |
B-1 | PWR | CP2 | Operational | 915 | 1 May 1976 | 1 Aug 1983 | ||
B-2 | PWR | CP2 | Operational | 915 | 1 Jul 1976 | 1 Aug 1983 | ||
Superphénix | 1 | FBR | Na-1200 | Shut down/in decommissioning | 1200 | 13 Dec 1976 | 1 Dec 1986 | 31 Dec 1998 |
Tricastin | 1 | PWR | CP1 | Operational | 915 | 1 Nov 1974 | 1 Dec 1980 | |
2 | PWR | CP1 | Operational | 915 | 1 Dec 1974 | 1 Dec 1980 | ||
3 | PWR | CP1 | Operational | 915 | 1 Apr 1975 | 11 May 1981 | ||
4 | PWR | CP1 | Operational | 915 | 1 May 1975 | 1 Nov 1981 |
Germany
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
AVR | 1 | HTGR | PBR Prototype | Shut down | 13 | 1 Aug 1961 | 19 May 1969 | 31 Dec 1988 |
Biblis | 1 | PWR | Siemens-KWU | Shut down/in decommissioning | 1167 | 1 Jan 1970 | 26 Feb 1975 | 6 Aug 2011 |
2 | PWR | KWU | Shut down/in decommissioning | 1240 | 1 Feb 1972 | 31 Jan 1977 | 6 Aug 2011 | |
Brokdorf | 1 | PWR | KWU | Shut down | 1410 | 1 Jan 1976 | 22 Dec 1986 | 31 Dec 2021 |
Brunsbüttel | 1 | BWR | BWR-69 | Shut down | 771 | 15 Apr 1970 | 9 Feb 1977 | 6 Aug 2011 |
Emsland | 1 | PWR | Konvoi (KWU) | Shut down | 1329 | 10 Aug 1982 | 20 Jun 1988 | 15 Apr 2023 |
Grafenrheinfeld | 1 | PWR | KWU | Shut down | 1275 | 1 Jan 1975 | 17 Jun 1982 | 27 Jun 2015 |
Greifswald | 1 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Mar 1970 | 12 Jul 1974 | 14 Feb 1990 |
2 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Mar 1970 | 16 Apr 1975 | 14 Feb 1990 | |
3 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Apr 1972 | 1 May 1978 | 28 Feb 1990 | |
4 | PWR | VVER-440/V-230 | Shut down/in decommissioning | 408 | 1 Apr 1972 | 1 Nov 1979 | 22 Jul 1990 | |
5 | PWR | VVER-440/V-213 | Shut down/in decommissioning | 408 | 1 Dec 1976 | 1 Nov 1989 | 24 Nov 1989 | |
6 | PWR | VVER-440/V-213 | Finished; never entered service | 408 | ||||
Grohnde | 1 | PWR | KWU | Shut down | 1360 | 1 Jun 1976 | 1 Feb 1985 | 31 Dec 2021[69] |
Grosswelzheim | 1 | BWR | BWR | Dismantled | 25 | 1 Jan 1965 | 2 Aug 1970 | 20 Apr 1971 |
Gundremmingen | A | BWR | GE, BWR-1 | Shut down/in decommissioning | 237 | 12 Dec 1962 | 12 Apr 1967 | 13 Jan 1977 |
B | BWR | BWR-72 (KWU) | Shut down | 1284 | 20 Jul 1976 | 19 Jul 1984 | 31 Dec 2017[70] | |
C | BWR | BWR-72 (KWU) | Shut down | 1288 | 20 Jul 1976 | 18 Jan 1985 | 31 Dec 2021[69] | |
Isar | 1 | BWR | BWR-69 | Shut down/in decommissioning | 878 | 1 May 1972 | 21 Mar 1979 | 6 Aug 2011 |
2 | PWR | Konvoi (KWU) | Shut down | 1410 | 15 Sep 1982 | 9 Apr 1988 | 15 Apr 2023 | |
Kahl | 1 | BWR | BWR | Dismantled | 15 | 1 Jul 1958 | 1 Feb 1962 | 25 Nov 1985 |
SNR-300 | 1 | FBR | Finished; never entered service | 1972 | 1985 | |||
KNK II | 1 | FBR | Shut down | 17 | 1 Sep 1974 | 3 Mar 1979 | 23 Aug 1991 | |
Krümmel | 1 | BWR | BWR-69 (KWU) | Shut down | 1346 | 5 Apr 1974 | 28 Mar 1984 | 6 Aug 2011 |
Lingen | 1 | BWR | BWR | Shut down | 183 | 1 Oct 1964 | 1 Oct 1968 | 5 Jan 1977 |
Mülheim-Kärlich | 1 | PWR | B & W | Shut down/in decommissioning | 1219 | 15 Jan 1975 | 8 Aug 1987 | 9 Sep 1988 |
MZFR | 1 | PHWR | PHWR | Shut down | 52 | 1 Dec 1961 | 19 Dec 1966 | 3 May 1984 |
Neckarwestheim | 1 | PWR | KWU | Shut down | 785 | 1 Feb 1972 | 1 Dec 1976 | 6 Aug 2011 |
2 | PWR | Konvoi (KWU) | Shut down | 1310 | 9 Nov 1982 | 15 Apr 1989 | 15 Apr 2023 | |
Niederaichbach | 1 | HWGCR | Pressure tube reactor | Shut down/decommissioned | 100 | 1 Jun 1966 | 1 Jan 1973 | 31 Jul 1974 |
Obrigheim | 1 | PWR | Siemens | Shut down/in decommissioning | 340 | 15 Mar 1965 | 31 Mar 1969 | 11 May 2005 |
Philippsburg | 1 | BWR | BWR-69 | Shut down | 890 | 1 Oct 1970 | 26 Mar 1980 | 6 Aug 2011 |
2 | PWR | KWU | Shut down | 1402 | 7 Jul 1977 | 18 Apr 1985 | 31 Dec 2019[71] | |
Rheinsberg | 1 | PWR | VVER-70 | Shut down/in decommissioning | 62 | 1 Jan 1960 | 11 Oct 1966 | 1 Jun 1990 |
Stade | 1 | PWR | Siemens | Shut down/in decommissioning | 640 | 1 Dec 1967 | 19 May 1972 | 4 Nov 2003 |
Stendal | 1 | PWR | VVER-1000/V-320 | Unfinished | 1983 | 1990 | ||
2 | PWR | VVER-1000/V-320 | Unfinished | 1983 | 1990 | |||
THTR-300 | 1 | HTGR | PBR | Decommissioned | 296 | 3 May 1971 | 1 Jun 1987 | 29 Sep 1988 |
Unterweser | 1 | PWR | KWU | Shut down/in decommissioning | 1345 | 1 Jul 1972 | 6 Sep 1979 | 6 Aug 2011 |
Würgassen | 1 | BWR | BWR-69 (AEG) | Shut down/in decommissioning | 640 | 26 Jan 1968 | 11 Nov 1975 | 26 Aug 1994 |
Hungary
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Paks | 1 | PWR | VVER-440/V-213 | Operational | 470 | 1 Aug 1974 | 10 Aug 1983 | |
2 | PWR | VVER-440/V-213 | Operational | 473 | 1 Aug 1974 | 14 Nov 1984 | ||
3 | PWR | VVER-440/V-213 | Operational | 473 | 1 Oct 1979 | 1 Dec 1986 | ||
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Oct 1979 | 1 Nov 1987 | ||
5 | PWR | VVER-1200 | Planned | 1114 | (2024) | |||
6 | PWR | VVER-1200 | Planned | 1114 | (2024) |
India
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chutka[72] | 1 | PHWR | IPHWR-700 | Planned | 630 | |||
2 | PHWR | IPHWR-700 | Planned | 630 | ||||
Gorakhpur | 1 | PHWR | IPHWR-700 | Under construction | 630 | |||
2 | PHWR | IPHWR-700 | Under construction | 630 | ||||
3 | PHWR | IPHWR-700 | Planned | 630 | ||||
4 | PHWR | IPHWR-700 | Planned | 630 | ||||
Jaitapur | 1 | PWR | EPR | Planned | 1600 | |||
2 | PWR | EPR | Planned | 1600 | ||||
3 | PWR | EPR | Planned | 1600 | ||||
4 | PWR | EPR | Planned | 1600 | ||||
5 | PWR | EPR | Planned | 1600 | ||||
6 | PWR | EPR | Planned | 1600 | ||||
Kaiga | 1 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Sep 1989 | 16 Nov 2000 | |
2 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Dec 1989 | 16 Mar 2000 | ||
3 | PHWR | IPHWR-220[73] | Operational | 202 | 30 Mar 2002 | 6 May 2007 | ||
4 | PHWR | IPHWR-220[73] | Operational | 202 | 10 May 2002 | 20 Jan 2011 | ||
5 | PHWR | IPHWR-700 | Under construction | 630 | ||||
6 | PHWR | IPHWR-700 | Under construction | 630 | ||||
Kakrapar | 1 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Dec 1984 | 6 May 1993 | |
2 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Apr 1985 | 1 Sep 1995 | ||
3 | PHWR | IPHWR-700[74] | Operational | 630 | 22 Nov 2010 | 30 Jun 2023 | ||
4 | PHWR | IPHWR-700[74] | Under construction | 630 | 22 Nov 2010 | |||
Kudankulam | 1 | PWR | VVER-1000/V-412 | Operational | 932 | 31 Mar 2002 | 31 Dec 2014 | |
2 | PWR | VVER-1000/V-412 | Operational | 932 | 4 Jul 2002 | 31 Mar 2017 | ||
3 | PWR | VVER-1000/V-412 | Under construction | 917 | 30 Jun 2017 | |||
4 | PWR | VVER-1000/V-412 | Under construction | 917 | 23 Oct 2017 | |||
5 | PWR | VVER-1000/V-412 | Under construction | 917 | 29 Jun 2021 | |||
6 | PWR | VVER-1000/V-412 | Under construction | 917 | 20 Dec 2021[75] | |||
7 | PWR | VVER-1200 | Planned | 1100 | ||||
8 | PWR | VVER-2000 | Planned | 1100 | ||||
Madras | 1 | PHWR | IPHWR-220[73] | Shut Down (under maintenance) |
205 | 1 Jan 1971 | 27 Jan 1984 | |
2 | PHWR | IPHWR-220[73] | Operational | 205 | 1 Oct 1972 | 21 Mar 1986 | ||
3 | FBR | PFBR[73] | Under construction | 500 | 23 Oct 2004 | N/A | ||
4 | FBR | FBR-600[73] | Planned | 600 | N/A | N/A | ||
5 | FBR | FBR-600[73] | Planned | 600 | N/A | N/A | ||
Mahi Banswara | 1 | PHWR | IPHWR-700 | Planned | 630 | |||
2 | PHWR | IPHWR-700 | Planned | 630 | ||||
3 | PHWR | IPHWR-700 | Planned | 630 | ||||
4 | PHWR | IPHWR-700 | Planned | 630 | ||||
Narora | 1 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Dec 1976 | 1 Jan 1991 | |
2 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Nov 1977 | 1 Jul 1992 | ||
Rajasthan | 1 | PHWR | CANDU[73] | Shut down | 90 | 1 Aug 1965 | 16 Dec 1973 | 9 Oct 2004[76] |
2 | PHWR | CANDU[73] | Operational | 187 | 1 Apr 1968 | 1 Apr 1981 | ||
3 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Feb 1990 | 1 Jun 2000 | ||
4 | PHWR | IPHWR-220[73] | Operational | 202 | 1 Oct 1990 | 23 Dec 2000 | ||
5 | PHWR | IPHWR-220[73] | Operational | 202 | 18 Sep 2002 | 4 Feb 2010 | ||
6 | PHWR | IPHWR-220[73] | Operational | 202 | 20 Jan 2003 | 31 Mar 2010 | ||
7 | PHWR | IPHWR-700[74] | Under construction | 630 | 18 Jul 2011 | |||
8 | PHWR | IPHWR-700[74] | Under construction | 630 | 30 Sep 2011 | |||
Tarapur | 1 | BWR | BWR-1, Mark 1 | Shut Down (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | |
2 | BWR | BWR-1, Mark 1 | Shut Down (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | ||
3 | PHWR | IPHWR-540 | Operational | 490 | 12 May 2000 | 18 Aug 2006 | ||
4 | PHWR | IPHWR-540 | Operational | 490 | 8 Mar 2000 | 12 Sep 2005 |
Iran
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bushehr | 1 | PWR | VVER-1000/V-446 | Operational | 915 | 1 May 1975 | 23 Sep 2013 | |
2 | PWR | VVER-1000/V-528 | Under construction | 915 | 27 Sep 2019 | |||
3 | PWR | VVER-1000 | Planned | 915 | ||||
Darkhovin | 1 | PWR | Unfinished; restart planned | 360 |
Italy
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Caorso | 1 | BWR | BWR-4 Mark2 | Shut down/in decommissioning | 860 | 1 Jan 1970 | 1 Dec 1981 | 1 Jul 1990 |
Enrico Fermi | 1 | PWR | WH 4-loop | Shut down/in decommissioning | 260 | 1 Jul 1961 | 1 Jan 1965 | 1 Jul 1990 |
Garigliano | 1 | BWR | BWR-1 | Shut down/in decommissioning | 150 | 1 Nov 1959 | 1 Jun 1964 | 1 Mar 1982 |
Latina | 1 | GCR | Magnox | Shut down/in decommissioning | 153 | 1 Nov 1958 | 1 Jan 1964 | 1 Dec 1987 |
Alto Lazio | 1 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jan 1988 | ||
2 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jul 1988 | |||
Trino 2 (IT) | 1 | PWR | Unfinished | 950 | 23 dec 1987 | |||
2 | PWR | Unfinished | 950 | 23 dec 1987 |
Japan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Fugen | 1 | HWLWR | ATR | Shut down | 148 | 10 May 1972 | 20 Mar 1979 | 29 Mar 2003 |
Fukushima Daiichi | 1 | BWR | BWR-3 | Inoperable | 439 | 25 Jul 1967 | 26 Mar 1971 | 19 May 2011 |
2 | BWR | BWR-4 | Inoperable | 760 | 9 Jun 1969 | 18 Jul 1974 | 19 May 2011 | |
3 | BWR | BWR-4 | Inoperable | 760 | 28 Dec 1970 | 27 Mar 1976 | 19 May 2011 | |
4 | BWR | BWR-4 | Inoperable | 760 | 12 Feb 1973 | 12 Oct 1978 | 19 May 2011 | |
5 | BWR | BWR-4 | Shut down | 760 | 22 May 1972 | 18 Apr 1978 | 17 Dec 2013 | |
6 | BWR | BWR-5 | Shut down | 1067 | 26 Oct 1973 | 24 Oct 1979 | 17 Dec 2013 | |
Fukushima Daini | 1 | BWR | BWR-5 | Shut down | 1067 | 16 Mar 1976 | 20 Apr 1982 | 30 Sep 2019 |
2 | BWR | BWR-5 | Shut down | 1067 | 25 May 1979 | 3 Feb 1984 | 30 Sep 2019 | |
3 | BWR | BWR-5 | Shut down | 1067 | 23 Mar 1981 | 21 Jun 1985 | 30 Sep 2019 | |
4 | BWR | BWR-5 | Shut down | 1067 | 28 May 1981 | 25 Aug 1987 | 30 Sep 2019 | |
Genkai | 1 | PWR | Mitsubishi (2-loop) | Shut down | 529 | 15 Sep 1971 | 15 Oct 1975 | 27 Apr 2015 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 529 | 1 Feb 1977 | 30 Mar 1981 | 9 Apr 2019 | |
3 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 1 Jun 1988 | 18 Mar 1994 | ||
4 | PWR | Mitsubishi (4-loop) | Operational[77] | 1127 | 15 Jul 1992 | 25 Jul 1997 | ||
Hamaoka | 1 | BWR | BWR-4 | Shut down | 515 | 10 Jun 1971 | 17 Mar 1976 | 30 Jan 2009 |
2 | BWR | BWR-4 | Shut down | 806 | 14 Jun 1974 | 29 Nov 1978 | 30 Jan 2009 | |
3 | BWR | BWR-5 | Operation suspended (under review)[78] |
1056 | 18 Apr 1983 | 28 Aug 1987 | ||
4 | BWR | BWR-5 | Operation suspended (under review)[78] |
1092 | 13 Oct 1989 | 3 Sep 1993 | ||
5 | BWR | ABWR | Operation suspended | 1325 | 12 Jul 2000 | 18 Jan 2005 | ||
Higashidōri (Tōhoku) | 1 | BWR | BWR-5 | Operation suspended (under review)[78] |
1067 | 7 Nov 2000 | 8 Dec 2005 | |
Higashidōri (Tokyo) | 1 | BWR | ABWR | Unfinished; restart planned | 1350 | 25 Jan 2011[79] | ||
Ikata | 1 | PWR | Mitsubishi (2-loop) | Shut down | 538 | 1 Sep 1973 | 30 Sep 1977 | 25 Mar 2016 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 538 | 1 Aug 1978 | 19 Mar 1982 | 27 Mar 2018 | |
3 | PWR | Mitsubishi (3-loop) | Operational | 846 | 1 Oct 1990 | 15 Dec 1994 | ||
Kashiwazaki-Kariwa | 1 | BWR | BWR-5 | Operation suspended | 1067 | 5 Jun 1980 | 18 Sep 1985 | |
2 | BWR | BWR-5 | Operation suspended | 1067 | 18 Nov 1985 | 28 Sep 1990 | ||
3 | BWR | BWR-5 | Operation suspended | 1067 | 7 Mar 1989 | 11 Aug 1993 | ||
4 | BWR | BWR-5 | Operation suspended | 1067 | 5 Mar 1990 | 11 Aug 1994 | ||
5 | BWR | BWR-5 | Operation suspended | 1067 | 20 Jun 1985 | 10 Apr 1990 | ||
6 | BWR | ABWR | Operation suspended (restart approved)[80] |
1315 | 3 Nov 1992 | 7 Nov 1996 | ||
7 | BWR | ABWR | Operation suspended (restart approved)[80] |
1315 | 1 Jul 1993 | 2 Jul 1997 | ||
Mihama | 1 | PWR | Mitsubishi (2-loop) | Shut down | 320 | 1 Feb 1967 | 28 Nov 1970 | Mar 2015 |
2 | PWR | Mitsubishi (2-loop) | Shut down | 470 | 29 May 1968 | 25 Jul 1972 | Mar 2015 | |
3 | PWR | Mitsubishi (3-loop) | Operational[81] | 780 | 7 Aug 1972 | 1 Dec 1976 | ||
Monju | 1 | FBR | Shut down | 246 | 10 May 1986 | 29 Aug 1995 | 5 Dec 2017 | |
Ōi | 1 | PWR | W (4-loop) | Shut down | 1120 | 26 Oct 1972 | 27 Mar 1979 | Dec 2017 |
2 | PWR | Westinghouse (4-loop) | Shut down | 1120 | 8 Dec 1972 | 5 Dec 1979 | Dec 2017 | |
3 | PWR | Mitsubishi (4-loop) | Operational | 1127 | 3 Oct 1987 | 18 Dec 1991 | ||
4 | PWR | Mitsubishi (4-loop) | Operational[82] | 1127 | 13 Jun 1988 | 2 Feb 1993 | ||
Ōma | 1 | BWR | ABWR | Under construction | 1325 | 7 May 2010 | ||
Onagawa | 1 | BWR | BWR-4 | Shut down | 498 | 8 Jul 1980 | 1 Jun 1984 | 21 Dec 2018 |
2 | BWR | BWR-5 | Operation suspended (restart approved)[83] |
796 | 12 Apr 1991 | 28 Jul 1995 | ||
3 | BWR | BWR-5 | Operation suspended | 796 | 23 Jan 1998 | 30 Jan 2002 | ||
Sendai | 1 | PWR | Mitsubishi (3-loop) | Operational | 846 | 15 Dec 1979 | 4 Jul 1984 | |
2 | PWR | Mitsubishi (3-loop) | Operational | 846 | 12 Oct 1981 | 28 Nov 1985 | ||
Shika | 1 | BWR | BWR-5 | Operation suspended | 505 | 1 Jul 1989 | 30 Jul 1993 | |
2 | BWR | ABWR | Operation suspended (under review)[78] |
1108 | 20 Aug 2001 | 15 Mar 2006 | ||
Shimane | 1 | BWR | BWR-3 | Shut down | 439 | 2 Jul 1970 | 29 Mar 1974 | Mar 2015 |
2 | BWR | BWR-5 | Operation suspended (restart approved)[84] |
789 | 2 Feb 1985 | 10 Feb 1989 | ||
3 | BWR | ABWR | Under construction | 1325 | 12 Oct 2007 | |||
Takahama | 1 | PWR | Mitsubishi (3-loop) | Operational[85] | 780 | 25 Apr 1970 | 14 Nov 1974 | |
2 | PWR | Mitsubishi (3-loop) | Operational[86] | 780 | 9 Mar 1971 | 14 Nov 1975 | ||
3 | PWR | Mitsubishi (3-loop) | Operational | 830 | 12 Dec 1980 | 17 Jan 1985 | ||
4 | PWR | Mitsubishi (3-loop) | Operational | 830 | 19 Mar 1981 | 5 Jun 1985 | ||
Tōkai | 1 | GCR | Magnox | Shut down | 137 | 1 Mar 1961 | 25 Jul 1966 | 31 Mar 1998 |
2 | BWR | BWR-5 | Operation suspended (restart approved)[87] |
1060 | 3 Oct 1973 | 28 Nov 1978 | ||
Tomari | 1 | PWR | Mitsubishi (2-loop) | Operation suspended (under review)[78] |
550 | 18 Apr 1985 | 22 Jun 1989 | |
2 | PWR | Mitsubishi (2-loop) | Operation suspended (under review)[78] |
550 | 13 Jun 1985 | 12 Apr 1991 | ||
3 | PWR | Mitsubishi (3-loop) | Operation suspended (under review)[78] |
866 | 18 Nov 2004 | 22 Dec 2009 | ||
Tsuruga | 1 | BWR | BWR-2 | Shut down | 340 | 24 Nov 1966 | 14 Mar 1970 | Mar 2015 |
2 | PWR | Mitsubishi (4-loop) | Operation suspended (under review)[78] |
1108 | 6 Nov 1982 | 17 Feb 1987 |
Kazakhstan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Aktau | 1 | FBR | BN-350 | Shut down/in decommissioning | 350 | 1 Oct 1964 | 16 Jul 1973 | 22 Apr 1999 |
Lithuania
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Ignalina | 1 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 May 1977 | 31 Dec 1983 | 31 Dec 2004 |
2 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 Jan 1978 | Aug 1987 | 31 Dec 2009 | |
3 | LWGR | RBMK-1500 | Unfinished | 1185 | ||||
4 | LWGR | RBMK-1500 | Never built | 1185 |
Mexico
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Laguna Verde | 1 | BWR | BWR-5 | Operational | 777 | 1 Oct 1976 | 28 Jul 1990 | |
2 | BWR | BWR-5 | Operational | 775 | 1 Jun 1977 | 10 Apr 1995 |
Netherlands
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Borssele | 1 | PWR | KWU 2LP | Operational | 482 | 1 Jul 1969 | 26 Oct 1973 | (2033) |
Dodewaard | 1 | BWR | BWR-2 | Shut down | 55 | 1 May 1965 | 26 Mar 1969 | 26 Mar 1997 |
North Korea
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Yongbyon | 1 | GCR | Magnox (Pu-production) | Shut down[citation needed] | 5[citation needed] | 1994 | ||
2 | LWR[88] | Planned[88] | 30 | |||||
Taechon | 1 | Unfinished | 200 | 1994 | ||||
Kumho | 1 | PWR | Unfinished | 1000 | 2003 | |||
2 | PWR | Unfinished | 1000 | 2003 |
Pakistan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chashma | 1 | PWR | CNP-300 | Operational | 300 | 1 Aug 1993 | 15 Sep 2000 | |
2 | PWR | CNP-300 | Operational | 300 | 28 Dec 2005 | 18 May 2011 | ||
3 | PWR | CNP-300 | Operational | 315 | 28 May 2011 | 6 Dec 2016 | ||
4 | PWR | CNP-300 | Operational | 313 | 18 Dec 2011 | 19 Sep 2017 | ||
5 | PWR | Hualong One | Planned | 1080 | ||||
Karachi | 1 | PHWR | CANDU-137 MW | Shut down | 90 | 1 Aug 1966 | 7 Dec 1972 | 1 Aug 2021 |
2 | PWR | Hualong One | Operational | 1014 | 23 May 2013 | 19 Mar 2021[89] | ||
3 | PWR | Hualong One | Operational | 1014 | 31 May 2016 | 18 Apr 2022 |
Philippines
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bataan | 1 | PWR | Westinghouse | Unfinished; restart planned[90] | 621 | 1976 | 1986 |
Poland
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Żarnowiec | 1 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | |
2 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | ||
Choczewo[91] | 1 | PWR | AP1000 | Planned | 1250[92] | (2026) | (2033)[91] | |
2 | PWR | AP1000 | Planned | 1250 | (2035–2036)[91] | |||
3 | PWR | AP1000 | Planned | 1250 | (2037–2039)[91] | |||
Pątnów[93] | 1 | PWR | APR-1400 | Planned | 1340 | |||
2 | PWR | APR-1400 | Planned | 1340 | ||||
Włocławek | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Ostrołęka | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Warsaw | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Tarnobrzeg/Stalowa Wola | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Dąbrowa Górnicza | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Stawy Monowskie | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] | ||
Kraków | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[94] |
Romania
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Cernavodă | 1 | PHWR | CANDU-6 | Operational | 650 | 31 Mar 1983 | 2 Dec 1996 | |
2 | PHWR | CANDU-6 | Operational | 650 | 1 Jul 1983 | 1 Nov 2007 | ||
3 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
4 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
5 | PHWR | CANDU-6 | Unfinished | 650 |
Russia
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Akademik Lomonosov | 1 | PWR | KLT-40S | Operational | 32 | 15 Apr 2007 | 19 Dec 2019[95] | |
2 | PWR | KLT-40S | Operational | 32 | 15 Apr 2007 | 19 Dec 2019 | ||
Balakovo | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Dec 1980 | 23 May 1986 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1981 | 18 Jan 1988 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1982 | 8 Apr 1989 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1984 | 22 Dec 1993 | ||
Beloyarsk | 1 | LWGR | AMB-100 | Shut down | 102 | 1 Jun 1958 | 26 Apr 1964 | 1 Jan 1983 |
2 | LWGR | AMB-200 | Shut down | 146 | 1 Jan 1962 | 1 Dec 1969 | 1 Jan 1990 | |
3 | SFR | BN-600 | Operational | 560 | 1 Jan 1969 | 1 Nov 1981 | ||
4 | SFR | BN-800 | Operational | 789 | 18 Jul 2006 | 10 Dec 2015 | ||
5 | SFR | BN-1200 | Planned | 1100 | ||||
Bilibino | 1 | LWGR | EGP-6 | Shut down | 11 | 1 Jan 1970 | 1 Apr 1974 | 14 Jan 2019 |
2 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Feb 1975 | ||
3 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Feb 1976 | ||
4 | LWGR | EGP-6 | Operational | 11 | 1 Jan 1970 | 1 Jan 1977 | ||
Kalinin | 1 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Feb 1977 | 12 Jun 1985 | |
2 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Feb 1982 | 3 Mar 1987 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Oct 1985 | 8 Nov 2005 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1986 | 25 Dec 2012 | ||
Kaliningrad | 1 | PWR | VVER-1200/V-491 | Under construction (suspended)[96] |
1109 | 22 Feb 2012 | ||
2 | PWR | VVER-1200/V-491 | Planned | 1109 | ||||
Kola | 1 | PWR | VVER-440/V-230 | Operational | 441 | 1 May 1970 | 28 Dec 1973 | |
2 | PWR | VVER-440/V-230 | Operational | 441 | 1 May 1970 | 21 Feb 1975 | ||
3 | PWR | VVER-440/V-213 | Operational | 441 | 1 Apr 1977 | 3 Dec 1982 | ||
4 | PWR | VVER-440/V-213 | Operational | 441 | 1 Aug 1976 | 6 Dec 1984 | ||
Kola II[96][97] | 1 | PWR | VVER-S-600 | Planned | 600 | (2028) | (2034) | |
2 | PWR | VVER-S-600 | Planned | 600 | (2028) | (2034) | ||
Kostroma | 1 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | ||
2 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
3 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
4 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1979 | |||
Kursk | 1 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jun 1972 | 12 Oct 1977 | 19 Dec 2021 |
2 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jan 1973 | 17 Aug 1979 | 31 Jan 2024[98] | |
3 | LWGR | RBMK-1000 | Operational | 925 | 1 Apr 1978 | 30 Mar 1984 | ||
4 | LWGR | RBMK-1000 | Operational | 925 | 1 May 1981 | 5 Feb 1986 | ||
Kursk II | 1 | PWR | VVER-TOI/V-510 | Under construction | 1115 | 29 Apr 2018 | ||
2 | PWR | VVER-TOI/V-510 | Under construction | 1115 | 15 Apr 2019[99] | |||
3 | PWR | VVER-TOI | Planned | 1115 | ||||
4 | PWR | VVER-TOI | Planned | 1115 | ||||
Leningrad | 1 | LWGR | RBMK-1000 | Shut down | 925 | 1 Mar 1970 | 1 Nov 1974 | 21 Dec 2018[100] |
2 | LWGR | RBMK-1000 | Shut down | 925 | 1 Jun 1970 | 11 Feb 1976 | 10 Nov 2020 | |
3 | LWGR | RBMK-1000 | Operational | 925 | 1 Dec 1973 | 29 Jun 1980 | ||
4 | LWGR | RBMK-1000 | Operational | 925 | 1 Feb 1975 | 29 Aug 1981 | ||
Leningrad II[101] | 1 | PWR | VVER-1200/V-491 | Operational | 1085 | 25 Oct 2008 | 29 Oct 2018 | |
2 | PWR | VVER-1200/V-491 | Operational | 1085 | 15 Apr 2010 | 22 Mar 2021 | ||
3 | PWR | VVER-1200 | Planned | 1085 | (2024)[102] | (2030) | ||
4 | PWR | VVER-1200 | Planned | 1085 | (2025) | (2032) | ||
MPEB No. 1[103][104][105] | 1 | PWR | RITM-200S | Under construction | 53 | 30 Aug 2022[106] | (2027) | |
2 | PWR | RITM-200S | Under construction | 53 | 30 Aug 2022[106] | (2027) | ||
MPEB No. 2 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2027) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2027) | ||
MPEB No. 3 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2028) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2028) | ||
MPEB No. 4 | 1 | PWR | RITM-200S | Planned | 53 | (2022) | (2031) | |
2 | PWR | RITM-200S | Planned | 53 | (2022) | (2031) | ||
Nizhny Novgorod | 1 | PWR | VVER-1200 | Planned | 1300 | |||
2 | PWR | VVER-1200 | Planned | 1300 | ||||
3 | PWR | VVER-1200 | Planned | 1300 | ||||
4 | PWR | VVER-1200 | Planned | 1300 | ||||
Novovoronezh | 1 | PWR | VVER/V-210 | Shut down | 197 | 1 Jul 1957 | 31 Dec 1964 | 16 Feb 1988 |
2 | PWR | VVER/V-365 | Shut down | 336 | 1 Jun 1964 | 14 Apr 1970 | 29 Aug 1990 | |
3 | PWR | VVER-440/V-179 | Shut down | 385 | 1 Jul 1967 | 29 Jun 1972 | 25 Dec 2016 | |
4 | PWR | VVER 440/V-179 | Operational | 385 | 1 Jul 1967 | 24 Mar 1973 | ||
5 | PWR | VVER-1000/V-187 | Operational | 950 | 1 Mar 1974 | 20 Feb 1981 | ||
Novovoronezh II | 1 | PWR | VVER-1200/V-392M | Operational | 1114 | 24 Jun 2008 | 27 Feb 2017 | |
2 | PWR | VVER-1200/V-392M | Operational | 1114 | 12 Jul 2009 | 6 Nov 2019 | ||
3 | PWR | VVER-1200 | Planned | 1175 | ||||
4 | PWR | VVER-1200 | Planned | 1175 | ||||
Obninsk | 1 | LWGR | AM-1 | Shut down | 5 | 1 Jan 1951 | 1 Dec 1954 | 29 Apr 2002 |
Rostov | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Sep 1981 | 25 Dec 2001 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 May 1983 | 10 Dec 2010 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 15 Sep 2009 | 27 Dec 2014 | ||
4 | PWR | VVER-1000/V-320 | Operational | 1011 | 16 Jun 2010 | 28 Sep 2018 | ||
Sakha | 1 | PWR | RITM-200N | Planned | 55 | (2024)[107] | (2028) | |
Seversk | 1 | FBR | BREST-300 | Under construction | 280 | 8 Jun 2021[108] | (2026) | |
South Urals | 1 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | ||
2 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | |||
3 | FBR | BN-1200 | Unfinished; restart planned | 1100 | 1982 | |||
Smolensk | 1 | LWGR | RBMK-1000 | Operational | 925 | 1 Oct 1975 | 30 Sep 1983 | |
2 | LWGR | RBMK-1000 | Operational | 925 | 1 Jun 1976 | 2 Jul 1985 | ||
3 | LWGR | RBMK-1000 | Operational | 925 | 1 May 1984 | 12 Oct 1990 | ||
Smolensk II[109][110] | 1 | PWR | VVER-TOI | Planned | 1300 | |||
2 | PWR | VVER-TOI | Planned | 1300 | ||||
Tatar | 1 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1980 | ||
2 | PWR | VVER-1200 | Unfinished; restart planned | 1300 | 1980 |
Slovakia
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Bohunice | A-1[111] | HWGCR | KS 150 | Decommissioned | 93 | 1 Aug 1958 | 25 Dec 1972 | 22 Feb 1977 |
1[112] | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Apr 1980 | 31 Dec 2006 | |
2 | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Jan 1981 | 31 Dec 2008 | |
3 | PWR | VVER-440/V-213 | Operational | 472 | 1 Dec 1976 | 14 Feb 1985 | (2045) | |
4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Dec 1976 | 18 Dec 1985 | (2045) | |
Mochovce | 1 | PWR | VVER-440 V-213 | Operational | 436 | 13 Oct 1983 | 29 Oct 1998 | (2058) |
2 | PWR | VVER-440/V-213 | Operational | 436 | 13 Oct 1983 | 11 Apr 2000 | (2060) | |
3 | PWR | VVER-440/V-213 | Operational | 440 | 27 Jan 1987 | 17 Oct 2023[113] | ||
4 | PWR | VVER-440/V-213 | Under construction | 440 | 27 Jan 1987 |
Slovenia
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Krško | 1 | PWR | WH 2 loops | Operational | 688 | 30 Mar 1975 | 1 Jan 1983 | (2043)[114] |
2 | PWR | TBD | Planned | 1100 | (2030)[115] |
South Africa
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Koeberg | 1 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 21 Jul 1984 | |
2 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 9 Nov 1985 |
South Korea
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Hanbit | 1 | PWR | WH F | Operational | 960 | 4 Jun 1981 | 25 Aug 1986 | |
2 | PWR | WH F | Operational | 958 | 10 Dec 1981 | 10 Jun 1987 | ||
3 | PWR | OPR-1000 | Operational | 997 | 23 Dec 1989 | 31 Mar 1995 | ||
4 | PWR | OPR-1000 | Operational | 997 | 26 May 1990 | 1 Jan 1996 | ||
5 | PWR | OPR-1000 | Operational | 997 | 29 Jun 1997 | 21 May 2002 | ||
6 | PWR | OPR-1000 | Operational | 995 | 20 Nov 1997 | 24 Dec 2002 | ||
Hanul | 1 | PWR | CP1 (France) | Operational | 960 | 26 Jan 1983 | 10 Sep 1988 | |
2 | PWR | CP1 (France) | Operational | 962 | 5 Jul 1983 | 30 Sep 1989 | ||
3 | PWR | OPR-1000 | Operational | 994 | 21 Jul 1993 | 11 Aug 1998 | ||
4 | PWR | OPR-1000 | Operational | 998 | 1 Nov 1993 | 31 Dec 1999 | ||
5 | PWR | OPR-1000 | Operational | 996 | 1 Oct 1999 | 29 Jul 2004 | ||
6 | PWR | OPR-1000 | Operational | 996 | 29 Sep 2000 | 22 Apr 2005 | ||
Shin-Hanul | 1 | PWR | APR-1400 | Operational | 1414 | 10 Jul 2012 | 7 Dec 2022[116] | |
2 | PWR | APR-1400 | Under commissioning | 1400 | 19 Jul 2012 | |||
3 | PWR | APR-1400 | Planned[117] | 1340 | ||||
4 | PWR | APR-1400 | Planned[117] | 1340 | ||||
Kori | 1 | PWR | WH 60 | Shut down | 576 | 27 Apr 1972 | 29 Apr 1978 | 18 Jun 2017 |
2 | PWR | WH F | Operational | 640 | 4 Dec 1977 | 25 Jul 1983 | ||
3 | PWR | WH F | Operational | 1011 | 1 Oct 1979 | 30 Sep 1985 | ||
4 | PWR | WH F | Operational | 1012 | 1 Apr 1980 | 29 Apr 1986 | ||
Shin-Kori | 1 | PWR | OPR-1000 | Operational | 996 | 16 Jun 2006 | 28 Feb 2011 | |
2 | PWR | OPR-1000 | Operational | 996 | 5 Jun 2007 | 20 Jul 2012 | ||
Saeul | 1 | PWR | APR-1400 | Operational | 1416 | 16 Oct 2008 | 15 Jan 2016 | |
2 | PWR | APR-1400 | Operational | 1418 | 19 Aug 2009 | 29 Aug 2019[118] | ||
3 | PWR | APR-1400 | Under construction | 1400 | 1 Apr 2017 | |||
4 | PWR | APR-1400 | Under construction | 1400 | 20 Sep 2018 | |||
Wolsong | 1 | PHWR | CANDU-6 | Shut down | 657 | 30 Oct 1977 | 22 Apr 1983 | 24 Dec 2019 |
2 | PHWR | CANDU-6 | Operational | 655 | 22 Jun 1992 | 1 Jul 1997 | ||
3 | PHWR | CANDU-6 | Operational | 684 | 17 Mar 1994 | 1 Jul 1998 | ||
4 | PHWR | CANDU-6 | Operational | 688 | 22 Jul 1994 | 1 Oct 1999 | ||
Shin-Wolsong | 1 | PWR | OPR-1000 | Operational | 991 | 20 Nov 2007 | 31 Jul 2012 | |
2 | PWR | OPR-1000 | Operational | 960 | 23 Sep 2008 | 26 Feb 2015 |
Spain
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Almaraz | 1 | PWR | WH 3 loops | Operational | 1011 | 3 Jul 1973 | 1 Sep 1983 | |
2 | PWR | WH 3 loops | Operational | 1006 | 3 Jul 1973 | 1 Jul 1984 | ||
Ascó | 1 | PWR | WH 3 loops | Operational | 995 | 16 May 1974 | 10 Dec 1984 | |
2 | PWR | WH-3 loops | Operational | 997 | 7 Mar 1975 | 31 Mar 1986 | ||
Cofrentes | 1 | BWR | BWR-6 | Operational | 1064 | 9 Sep 1975 | 11 Mar 1985 | |
José Cabrera | 1 | PWR | WH 1 loop | Shut down/in decommissioning | 141 | 24 Jun 1964 | 13 Aug 1969 | 30 Apr 2006 |
Lemoniz | 1 | PWR | Unfinished | 1972 | 1984 | |||
2 | PWR | Unfinished | 1972 | 1984 | ||||
Santa María de Garoña | 1 | BWR | BWR-3 | Shut down/in decommissioning | 446 | 11 May 1971 | 15 Feb 1975 | 6 Jul 2013 |
Trillo | 1 | PWR | KWU 3 loops | Operational | 1003 | 17 Aug 1979 | 6 Aug 1988 | |
Valdecaballeros | 1 | BWR | Unfinished | 1975 | 1984 | |||
2 | BWR | Unfinished | 1975 | 1984 | ||||
Vandellòs | 1 | GCR | Shut down/in decommissioning | 480 | 1967 | 2 Aug 1972 | 31 Jul 1990 | |
2 | PWR | WH 3 loops | Operational | 1045 | 29 Dec 1980 | 8 Mar 1988 |
Sweden
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed | |
---|---|---|---|---|---|---|---|---|---|
Ågesta | 1 | PHWR | R3 | Shut down/in decommissioning | 10 | 1 Dec 1957 | 1 May 1964 | 2 Jun 1974 | [lower-alpha 1] |
Barsebäck | 1 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Feb 1971 | 1 Jul 1975 | 30 Nov 1999 | [lower-alpha 2] |
2 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Jan 1973 | 1 Jul 1977 | 31 May 2005 | [lower-alpha 3] | |
Forsmark | 1 | BWR | ASEA-III, BWR-2500 | Operational | 986 | 1 Jun 1973 | 10 Dec 1980 | [lower-alpha 4] | |
2 | BWR | ASEA-III, BWR-2500 | Operational | 1116 | 1 Jan 1975 | 7 Jul 1981 | [lower-alpha 5] | ||
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1167 | 1 Jan 1979 | 18 Aug 1985 | [lower-alpha 6] | ||
Oskarshamn | 1 | BWR | ASEA-I | Shut down/in decommissioning | 473 | 1 Aug 1966 | 6 Feb 1972 | 19 Jun 2017 | [lower-alpha 7] |
2 | BWR | ASEA-II | Shut down/in decommissioning | 638 | 1 Sep 1969 | 1 Jan 1975 | 22 Dec 2016 | [lower-alpha 8] | |
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1450 | 1 May 1980 | 15 Aug 1985 | [lower-alpha 9] | ||
Marviken | 1 | BHWR | R4 | Unfinished | 196 | 1 Apr 1965 | 27 may 1970 | [lower-alpha 10] | |
Ringhals | 1 | BWR | ASEA-I | Shut down/in decommissioning | 881 | 1 Feb 1969 | 1 Jan 1976 | 31 Dec 2020 | [lower-alpha 11] |
2 | PWR | WH 3-loops | Shut down/in decommissioning | 904 | 1 Oct 1970 | 1 May 1975 | 30 Dec 2019 | [lower-alpha 12] | |
3 | PWR | WH 3-loops | Operational | 1062 | 1 Sep 1972 | 9 Sep 1981 | [lower-alpha 13] | ||
4 | PWR | WH 3-loops | Operational | 1104 | 1 Nov 1973 | 21 Nov 1983 | [lower-alpha 14] |
Switzerland
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed[124] |
---|---|---|---|---|---|---|---|---|
Beznau | 1 | PWR | WH 2-loops | Operational | 365 | 1 Sep 1965 | 1 Sep 1969 | (2029) |
2 | PWR | WH 2-loops | Operational | 365 | 1 Jan 1968 | 1 Dec 1971 | (2031) | |
Gösgen | 1 | PWR | KWU 3-loops | Operational | 1010 | 1 Dec 1973 | 1 Nov 1979 | |
Leibstadt | 1 | BWR | BWR-6 | Operational | 1220 | 1 Jan 1974 | 15 Dec 1984 | |
Lucens | 1 | HWGCR | HWGCR | Decommissioned | 6 | 1 Apr 1962 | 29 Dec 1966 | 21 Jan 1969 |
Mühleberg | 1 | BWR | BWR-4 | Shut down/in decommissioning | 373 | 1 Mar 1967 | 6 Nov 1972 | 20 Dec 2019 |
Taiwan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Jinshan | 1 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 2 Jun 1972 | 10 Dec 1978 | 3 Oct 2018 |
2 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 7 Dec 1973 | 15 Jul 1979 | 3 Oct 2018 | |
Kuosheng | 1 | BWR | BWR-6 | Shut down | 985 | 19 Nov 1975 | 28 Dec 1981 | 1 Jul 2021[125] |
2 | BWR | BWR-6 | Shut down | 985 | 15 Mar 1976 | 16 Mar 1983 | 15 Mar 2023 | |
Lungmen | 1 | BWR | ABWR | Unfinished | 1350 | 31 Mar 1999 | 2014[citation needed] | |
2 | BWR | ABWR | Unfinished | 1350 | 30 Aug 1999 | 2014 | ||
Maanshan | 1 | PWR | WH 312 3-loop | Operational | 951 | 21 Aug 1978 | 27 Jul 1984 | |
2 | PWR | WH 312 3-loop | Operational | 951 | 21 Feb 1979 | 18 May 1985 |
Turkey
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Akkuyu | 1 | PWR | VVER-1200/V-509 | Under construction | 1114 | 3 Apr 2018 | (2025)[126] | |
2 | PWR | VVER-1200/V-509 | Under construction | 1114 | 8 Apr 2020 | (2026) | ||
3 | PWR | VVER-1200/V-509 | Under construction | 1114 | 10 Mar 2021 | (2027) | ||
4 | PWR | VVER-1200/V-509 | Under construction | 1114 | 21 Jul 2022[127] | (2028) | ||
Sinop[128][129] | 1 | PWR | Atmea-1 | Cancelled | 1100 | |||
2 | PWR | Atmea-1 | Cancelled | 1100 | ||||
3 | PWR | Atmea-1 | Cancelled | 1100 | ||||
4 | PWR | Atmea-1 | Cancelled | 1100 |
Ukraine
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chernobyl | 1 | LWGR | RBMK-1000 | Shut down/in decommissioning | 740 | 1 Mar 1970 | 27 May 1978 | 30 Nov 1996 |
2 | LWGR | RBMK-1000 | Shut down/in decommissioning | 925 | 1 Feb 1973 | 28 May 1979 | 11 Oct 1991 | |
3 | LWGR | RBMK-1000 | Shut down/in decommissioning | 925 | 1 Mar 1976 | 8 Jun 1982 | 15 Dec 2000 | |
4 | LWGR | RBMK-1000 | Destroyed | 925 | 1 Apr 1979 | 26 Mar 1984 | 26 Apr 1986 | |
5 | LWGR | RBMK-1000 | Unfinished | 925 | ||||
6 | LWGR | RBMK-1000 | Unfinished | 925 | ||||
Chyhyryn[130] | 1 | PWR | AP1000 | Planned | 1100 | |||
2 | PWR | AP1000 | Planned | 1100 | ||||
Crimean | 1 | PWR | VVER-1000 | Unfinished | 950 | 26 Jan 1984 | 1987 | |
2 | PWR | VVER-1000 | Unfinished | 950 | 26 Jan 1984 | 1987 | ||
Kharkiv | 1 | PWR | VVER-1000 | Unfinished | 900 | 1988 | 1990 | |
2 | PWR | VVER-1000 | Unfinished | 900 | 1988 | 1990 | ||
Khmelnytskyi | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1981 | 13 Aug 1988 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Feb 1985 | 15 Dec 2005 | ||
3 | PWR | VVER-1000 | Under construction | 950 | 1 Sep 1985 | (2026)[131] | ||
4 | PWR | VVER-1000 | Under construction | 950 | 1 Jun 1986 | (2026) | ||
5 | PWR | AP1000 | Planned[132] | 1100 | ||||
6 | PWR | AP1000 | Planned[133] | 1100 | ||||
Odesa | 1 | PWR | VVER-1000 | Unfinished | 900 | 1989 | ||
2 | PWR | VVER-1000 | Unfinished | 900 | 1989 | |||
Rivne | 1 | PWR | VVER-440/V-213 | Operational | 381 | 1 Aug 1973 | 22 Sep 1981 | |
2 | PWR | VVER-440/V-213 | Operational | 376 | 1 Oct 1973 | 29 Jul 1982 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Feb 1980 | 16 May 1987 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Aug 1986 | 6 Apr 2006 | ||
5 | PWR | AP1000 | Planned[133] | 1100 | ||||
South Ukraine | 1 | PWR | VVER-1000/V-302 | Operational | 950 | 1 Aug 1976 | 2 Dec 1983 | |
2 | PWR | VVER-1000/V-338 | Operational | 950 | 1 Jul 1981 | 6 Apr 1985 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1984 | 29 Dec 1989 | ||
4 | PWR | AP1000 | Planned[133] | 1100 | ||||
Zaporizhzhia | 1 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1980 | 25 Dec 1985 | |
2 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Jan 1981 | 15 Feb 1986 | ||
3 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1982 | 5 Mar 1987 | ||
4 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Apr 1983 | 14 Apr 1988 | ||
5 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Nov 1985 | 27 Oct 1989 | ||
6 | PWR | VVER-1000/V-320 | Operational | 950 | 1 Jun 1986 | 17 Sep 1996 |
United Arab Emirates
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Barakah | 1 | PWR | APR-1400 | Operational | 1345 | 19 Jul 2012 | 6 Apr 2021[134] | |
2 | PWR | APR-1400 | Operational | 1345 | 16 Apr 2013 | 24 Mar 2022[135] | ||
3 | PWR | APR-1400 | Operational | 1345 | 24 Sep 2014 | 24 Feb 2023[136] | ||
4 | PWR | APR-1400 | Under construction | 1345 | 30 Jul 2015 | (2024) |
United Kingdom
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Berkeley | 1 | GCR | Magnox | Decommissioned | 138 | 1 Jan 1957 | 12 Jun 1962 | 31 Mar 1989 |
2 | GCR | Magnox | Decommissioned | 138 | 1 Jan 1957 | 20 Oct 1962 | 26 Oct 1988 | |
Bradwell | 1 | GCR | Magnox | Decommissioned | 123 | 1 Jan 1957 | 1 Jul 1962 | 31 Mar 2002 |
2 | GCR | Magnox | Decommissioned | 123 | 1 Jan 1957 | 12 Nov 1962 | 30 Mar 2002 | |
Bradwell B | 1 | PWR | Hualong One | Planned | 1117 | |||
2 | PWR | Hualong One | Planned | 1117 | ||||
Calder Hall | 1 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1953 | 1 Oct 1956 | 31 Mar 2003 |
2 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1953 | 1 Feb 1957 | 31 Mar 2003 | |
3 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1955 | 1 May 1958 | 31 Mar 2003 | |
4 | GCR | Magnox | Shut down/in decommissioning | 49 | 1 Aug 1955 | 1 Apr 1959 | 31 Mar 2003 | |
Chapelcross | 1 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Mar 1959 | 29 Jun 2004 |
2 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Aug 1959 | 29 Jun 2004 | |
3 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Dec 1959 | 29 Jun 2004 | |
4 | GCR | Magnox | Shut down/in decommissioning | 48 | 1 Oct 1955 | 1 Mar 1960 | 29 Jun 2004 | |
Dounreay | 1 | SFR | DFR | Shut down/in decommissioning | 11 | 1 Mar 1955 | 1 Oct 1962 | 1 Mar 1977 |
2 | SFR | PFR | Shut down/in decommissioning | 234 | 1 Jan 1966 | 1 Jul 1976 | 31 Mar 1994 | |
Dungeness A | A-1 | GCR | Magnox | Shut down/in decommissioning | 225 | 1 Jul 1960 | 28 Oct 1965 | 31 Dec 2006 |
A-2 | GCR | Magnox | Shut down/in decommissioning | 225 | 1 Jul 1960 | 30 Dec 1965 | 31 Dec 2006 | |
Dungeness B | B-1 | GCR | AGR | Shut down | 520 | 1 Oct 1965 | 1 Apr 1985 | 7 Jun 2021 |
B-2 | GCR | AGR | Shut down | 520 | 1 Oct 1965 | 1 Apr 1989 | 7 Jun 2021 | |
Hartlepool | 1 | GCR | AGR | Operational | 595 | 1 Oct 1968 | 1 Apr 1989 | (2026) |
2 | GCR | AGR | Operational | 585 | 1 Oct 1968 | 1 Apr 1989 | (2026) | |
Heysham | A-1 | GCR | AGR | Operational | 585 | 1 Dec 1970 | 1 Apr 1989 | (2026) |
A-2 | GCR | AGR | Operational | 575 | 1 Dec 1970 | 1 Apr 1989 | (2026) | |
B-1 | GCR | AGR | Operational | 610 | 1 Aug 1980 | 1 Apr 1989 | (2028)[137] | |
B-2 | GCR | AGR | Operational | 610 | 1 Aug 1980 | 1 Apr 1989 | (2028)[137] | |
Hinkley Point A | 1 | GCR | Magnox | Shut down/in decommissioning | 235 | 1 Nov 1957 | 30 Mar 1965 | 23 May 2000 |
2 | GCR | Magnox | Shut down/in decommissioning | 235 | 1 Nov 1957 | 5 May 1965 | 23 May 2000 | |
Hinkley Point B | 1 | GCR | AGR | Shut down/in decommissioning | 435 | 1 Sep 1967 | 2 Oct 1978 | 1 Aug 2022[138] |
2 | GCR | AGR | Shut down/in decommissioning | 435 | 1 Sep 1967 | 27 Sep 1976 | 6 Jul 2022[139] | |
Hinkley Point C | 1 | PWR | EPR | Under construction | 1600 | 11 Dec 2018 | (2027)[16] | |
2 | PWR | EPR | Under construction | 1600 | 12 Dec 2019 | (2028)[16] | ||
Hunterston A | 1 | GCR | Magnox | Shut down/in decommissioning | 150 | 1 Oct 1957 | 5 Feb 1964 | 30 Mar 1990 |
2 | GCR | Magnox | Shut down/in decommissioning | 150 | 1 Oct 1957 | 1 Jul 1964 | 31 Dec 1989 | |
Hunterston B | 1 | GCR | AGR | Shut down | 460 | 1 Nov 1967 | 6 Feb 1976 | 26 Nov 2021 |
2 | GCR | AGR | Shut down | 460 | 1 Nov 1967 | 31 Mar 1977 | 7 Jan 2022[140] | |
Moorside | 1 | PWR | EPR | Planned | 1600 | |||
2 | PWR | EPR | Planned | 1600 | ||||
Oldbury | 1 | GCR | Magnox | Shut down/in decommissioning | 217 | 1 May 1962 | 31 Dec 1967 | 29 Feb 2012 |
2 | GCR | Magnox | Shut down/in decommissioning | 217 | 1 May 1962 | 30 Sep 1968 | 30 Jun 2011 | |
Sizewell A | 1 | GCR | Magnox | Shut down/in decommissioning | 210 | 1 Apr 1961 | 25 Mar 1966 | 31 Dec 2006 |
2 | GCR | Magnox | Shut down/in decommissioning | 210 | 1 Apr 1961 | 15 Sep 1966 | 31 Dec 2006 | |
Sizewell B | 1 | PWR | WH SNUPPS | Operational | 1191 | 18 Jul 1988 | 22 Sep 1995 | (2035) |
Sizewell C | 1 | PWR | EPR | Planned | 1600 | (2024)[141] | ||
2 | PWR | EPR | Planned | 1600 | ||||
Torness | 1 | GCR | AGR | Operational | 595 | 1 Aug 1980 | 25 May 1988 | (2028)[137] |
2 | GCR | AGR | Operational | 595 | 1 Aug 1980 | 3 Feb 1989 | (2028)[137] | |
Trawsfynydd | 1 | GCR | Magnox | Shut down/in decommissioning | 195 | 1 Jul 1959 | 24 Mar 1965 | 6 Feb 1991 |
2 | GCR | Magnox | Shut down/in decommissioning | 195 | 1 Jul 1959 | 24 Mar 1965 | 4 Feb 1991 | |
Winfrith[142] | 1 | SGHWR | SGHWR | Shut down/in decommissioning | 92 | 1 May 1963 | 1 Jan 1968 | 11 Sep 1990 |
Wylfa | 1 | GCR | Magnox | Shut down/in decommissioning | 490 | 1 Sep 1963 | 1 Nov 1971 | 30 Dec 2015 |
2 | GCR | Magnox | Shut down/in decommissioning | 490 | 1 Sep 1963 | 3 Jan 1972 | 25 Apr 2012 |
United States
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Arkansas Nuclear One | 1 | PWR | B & W (DRY-Cont) | Operational | 836 | 1 Oct 1968 | 21 May 1974 | |
2 | PWR | CE (DRY) | Operational | 988 | 6 Dec 1968 | 1 Sep 1978 | ||
Beaver Valley | 1 | PWR | WH 3-loop (DRY) | Operational | 908 | 26 Jun 1970 | 2 Jul 1976 | |
2 | PWR | WH 3-loop (DRY) | Operational | 905 | 3 May 1974 | 14 Aug 1987 | ||
Big Rock Point[143] | 1 | BWR | BWR-1 | Dismantled | 67 | 1 May 1960 | 29 Mar 1963 | 29 Aug 1997 |
Braidwood | 1[144] | PWR | WH 4-loop (DRY) | Operational | 1194 | 1 Aug 1975 | 29 Jul 1988 | |
2[145] | PWR | WH 4-loop (DRY) | Operational | 1160 | 1 Aug 1975 | 17 Oct 1988 | ||
Browns Ferry | 1 | BWR | BWR-4 (WET) | Operational | 1200 | 1 May 1967 | 1 Aug 1974 | |
2 | BWR | BWR-4 (WET) | Operational | 1200 | 1 May 1967 | 1 Mar 1975 | ||
3 | BWR | BWR-4 (WET) | Operational | 1210 | 1 Jul 1968 | 1 Mar 1977 | ||
Brunswick | 1 | BWR | BWR-4 (WET) | Operational | 938 | 7 Feb 1970 | 18 Mar 1977[146] | |
2 | BWR | BWR-4 (WET) | Operational | 932 | 7 Feb 1970 | 3 Nov 1975[147] | ||
Byron | 1 | PWR | WH 4-loop (DRY) | Operational | 1164 | 1 Apr 1975 | 16 Sep 1985 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1136 | 1 Apr 1975 | 2 Aug 1987 | ||
Callaway | 1 | PWR | WH 4-loop (DRY) | Operational | 1215 | 1 Sep 1975 | 19 Dec 1984 | |
Calvert Cliffs | 1 | PWR | CE 2-loop (DRY) | Operational | 877 | 1 Jun 1968 | 8 May 1977 | |
2 | PWR | CE 2-loop (DRY) | Operational | 855 | 1 Jun 1968 | 1 Apr 1977 | ||
Carbon Free Power Project[148][149] | 1 | PWR | NuScale | Cancelled | 77 | |||
2 | PWR | NuScale | Cancelled | 77 | ||||
3 | PWR | NuScale | Cancelled | 77 | ||||
4 | PWR | NuScale | Cancelled | 77 | ||||
5 | PWR | NuScale | Cancelled | 77 | ||||
6 | PWR | NuScale | Cancelled | 77 | ||||
Catawba | 1 | PWR | WH 4-loop (ICECOND) | Operational | 1160 | 1 May 1974 | 29 Jun 1985 | |
2 | PWR | WH 4-loop (ICECOND) | Operational | 1150 | 1 May 1974 | 19 Aug 1986 | ||
Clinch River | 1 | BWR | BWRX-300 | Planned | 180 | |||
Clinton | 1 | BWR | BWR-6 (WET) | Operational | 1062 | 1 Oct 1975 | 24 Nov 1987 | |
Columbia | 1 | BWR | BWR-5 (WET) | Operational | 1131 | 1 Aug 1972 | 13 Dec 1984 | |
Comanche Peak | 1 | PWR | WH 4-loop (DRY) | Operational | 1205 | 19 Dec 1974 | 13 Aug 1990 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1195 | 19 Dec 1974 | 3 Aug 1993 | ||
Connecticut Yankee | 1 | PWR | WH (DRY) | Dismantled | 582 | 1 May 1964 | 1 Jan 1968 | 5 Dec 1996 |
Cooper | 1 | BWR | BWR-4 (WET) | Operational | 769 | 1 Jun 1968 | 1 Jul 1974 | |
Crystal River 3 | 1 | PWR | B & W (DRY) | Shut down/in decommissioning | 860 | 25 Sep 1968 | 13 Mar 1977 | 5 Feb 2013 |
Davis-Besse | 1 | PWR | B & W (DRY) | Operational | 894 | 1 Sep 1970 | 31 Jul 1978 | |
Diablo Canyon | 1 | PWR | WH 4-Loop (DRY) | Operational | 1138 | 23 Apr 1968 | 7 May 1985 | |
2 | PWR | WH 4-Loop (DRY) | Operational | 1118 | 9 Dec 1970 | 13 Mar 1986 | ||
Donald C. Cook | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1020 | 25 Mar 1969 | 27 Aug 1975 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1090 | 25 Mar 1969 | 1 Jul 1978 | ||
Dresden | 1 | BWR | BWR-1 | Shut down | 197 | 1 May 1956 | 4 Jul 1960 | 31 Oct 1978 |
2 | BWR | BWR-3 (WET) | Operational | 894 | 10 Jan 1966 | 9 Jun 1970 | ||
3 | BWR | BWR-3 (WET) | Operational | 879 | 14 Oct 1966 | 16 Nov 1971 | ||
Duane Arnold | 1 | BWR | BWR-4 (WET) | Shut down | 601 | 22 May 1970 | 1 Feb 1975 | 10 Aug 2020 |
Edwin I. Hatch | 1 | BWR | BWR-4 (WET) | Operational | 924 | 30 Sep 1968 | 31 Dec 1975 | |
2 | BWR | BWR-4 (WET) | Operational | 924 | 1 Feb 1972 | 5 Sep 1979 | ||
Elk River | 1 | BWR | Dismantled | 22 | 1 Jan 1959 | 1 Jul 1964 | 1 Feb 1968 | |
Fermi | 1 | FBR | Prototype | Shut down | 61 | 8 Aug 1956 | 7 Aug 1966 | 29 Nov 1972 |
2 | BWR | BWR-4 (WET) | Operational | 1115 | 26 Sep 1972 | 23 Jan 1988 | ||
Fort Calhoun | 1 | PWR | CE 2-loop (WET) | Shut down | 482 | 7 Jun 1968 | 9 Aug 1973 | 24 Oct 2016 |
Fort St. Vrain | 1 | HTGR | General Atomics | Shut down | 330 | 1 Sep 1968 | 1 Jul 1979 | 29 Aug 1989 |
Ginna | 1 | PWR | WH 2-loop (DRY) | Operational | 560 | 25 Apr 1966 | 1 Jun 1970 | |
Grand Gulf | 1 | BWR | BWR-6 (WET) | Operational | 1401 | 4 May 1974 | 1 Jul 1985 | |
H. B. Robinson | 1 | PWR | WH 3-loop (DRY) | Operational | 735 | 13 Apr 1967 | 7 Mar 1971 | |
Hallam | 1 | SGR | Atomics International | Dismantled | 75 | 1 Jan 1959 | 1 Nov 1963 | 1 Sep 1969 |
Hartsville | A1[150] | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975[151] | 29 Aug 1984[151] | |
A2[150] | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975[151] | 29 Aug 1984[151] | ||
B1[150] | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975[151] | 22 Mar 1983[151] | ||
B2[150] | BWR | BWR-6 | Unfinished | 1285 | 23 May 1975[151] | 22 Mar 1983[151] | ||
Hope Creek | 1 | BWR | BWR-4 (WET) | Operational | 1172 | 1 Mar 1976 | 20 Dec 1986 | |
Humboldt Bay | 1 | BWR | BWR-1 | Dismantled | 63 | 1 Nov 1960 | 1 Aug 1963 | 2 Jul 1976 |
Indian Point | 1 | PWR | Shut down | 257 | 1 May 1956 | 1 Oct 1962 | 31 Oct 1974 | |
2 | PWR | WH 4-loop (DRY) | Shut down | 998 | 14 Oct 1966 | 1 Aug 1974 | 30 Apr 2020[152] | |
3 | PWR | WH 4-loop (DRY) | Shut down | 1030 | 1 Nov 1968 | 30 Aug 1976 | 30 Apr 2021[152] | |
James A. FitzPatrick | 1 | BWR | BWR-4 (WET) | Operational | 813 | 1 Sep 1968 | 28 Jul 1975 | |
Joseph M. Farley | 1 | PWR | WH 3-Loop (DRY) | Operational | 874 | 1 Oct 1970 | 1 Dec 1977 | |
2 | PWR | WH 3-Loop (DRY) | Operational | 883 | 1 Oct 1970 | 30 Jul 1981 | ||
Kemmerer | 1 | SFR | Natrium | Planned | 345 | |||
Kewaunee | 1 | PWR | WH 2-loop (DRY) | Shut down | 566 | 6 Aug 1968 | 16 Jun 1974 | 7 May 2013 |
La Crosse | 1 | BWR | BWR-1 | Dismantled | 48 | 1 Mar 1963 | 7 Nov 1969 | 30 Apr 1987 |
LaSalle County | 1 | BWR | BWR-5 (WET) | Operational | 1137 | 10 Sep 1973 | 1 Jan 1984 | |
2 | BWR | BWR-5 (WET) | Operational | 1140 | 10 Sep 1973 | 19 Oct 1984 | ||
Limerick | 1 | BWR | BWR-5 (WET) | Operational | 1134 | 19 Jun 1974 | 1 Feb 1986 | |
2 | BWR | BWR-5 (WET) | Operational | 1134 | 19 Jun 1974 | 8 Jan 1990 | ||
Maine Yankee | 1 | PWR | WH (DRY) | Dismantled | 860 | 1 Oct 1968 | 28 Dec 1972 | 1 Aug 1997 |
Marble Hill | 1 | PWR | WH (DRY) | Unfinished | 1130 | 1 Aug 1977 | 10 Jan 1984 | |
McGuire | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1158 | 1 Apr 1971 | 1 Dec 1981 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1158 | 1 Apr 1971 | 1 Mar 1984 | ||
Millstone | 1 | BWR | BWR-3 (WET) | Shut down | 641 | 1 May 1966 | 28 Dec 1970 | 21 Jul 1998 |
2 | PWR | CE 2-loop (DRY) | Operational | 869 | 1 Nov 1969 | 26 Dec 1975 | ||
3 | PWR | WH 4-Loop (DRY) | Operational | 1210 | 9 Aug 1974 | 23 Apr 1986 | ||
Monticello | 1 | BWR | BWR-3 (WET) | Operational | 628 | 19 Jun 1967 | 30 Jun 1971 | |
Nine Mile Point | 1 | BWR | BWR-2 (WET) | Operational | 613 | 12 Apr 1965 | 1 Dec 1969 | |
2 | BWR | BWR-5 (WET) | Operational | 1277 | 1 Aug 1975 | 11 Mar 1988 | ||
North Anna | 1 | PWR | WH 3-Loop (DRY) | Operational | 948 | 19 Feb 1971 | 6 Jun 1978 | |
2 | PWR | WH 3-Loop (DRY) | Operational | 944 | 19 Feb 1971 | 14 Dec 1980 | ||
Oconee | 1 | PWR | B & W (DRY) | Operational | 847 | 6 Nov 1967 | 15 Jul 1973 | |
2 | PWR | B & W (DRY) | Operational | 848 | 6 Nov 1967 | 9 Sep 1974 | ||
3 | PWR | B & W (DRY) | Operational | 859 | 6 Nov 1967 | 16 Dec 1974 | ||
Oyster Creek | 1 | BWR | BWR-2 (WET) | Shut down | 619 | 15 Dec 1964 | 23 Dec 1969 | 17 Sep 2018 |
Palisades | 1 | PWR | CE 2-loop (DRY) | Shut down | 805 | 14 Mar 1967 | 31 Dec 1971 | 20 May 2022 |
Palo Verde | 1 | PWR | CE80 2-loop (DRY) | Operational | 1311 | 25 May 1976 | 28 Jan 1986 | |
2 | PWR | CE80 2-loop (DRY) | Operational | 1314 | 1 Jun 1976 | 19 Sep 1986 | ||
3 | PWR | CE80 2-loop (DRY) | Operational | 1312 | 1 Jun 1976 | 8 Jan 1988 | ||
Parr | 1 | PHWR | CVTR | Dismantled | 17 | 1 Jan 1960 | 18 Dec 1963 | 10 Jan 1967 |
Pathfinder | 1 | BWR | BWR-1 | Dismantled | 59 | 1 Jan 1959 | 1 Aug 1966 | 1 Oct 1967 |
Peach Bottom | 1 | GCR | Prototype | Shut down | 40 | 1 Feb 1962 | 1 Jun 1966 | 1 Nov 1974 |
2 | BWR | BWR-4 (WET) | Operational | 1300 | 31 Jan 1968 | 5 Jul 1974 | ||
3 | BWR | BWR-4 (WET) | Operational | 1331 | 31 Jan 1968 | 23 Dec 1974 | ||
Perry | 1 | BWR | BWR-6 (WET) | Operational | 1240 | 1 Oct 1974 | 18 Nov 1987 | |
Pilgrim | 1 | BWR | BWR-3 (WET) | Shut down | 677 | 26 Aug 1968 | 9 Dec 1972 | 31 May 2019 |
Piqua | 1 | OCR | Atomics International | Decommissioned | 12 | 1 Jan 1960 | 1 Nov 1963 | 1 Jan 1966 |
Point Beach | 1 | PWR | WH 2-loop (DRY) | Operational | 591 | 19 Jul 1967 | 21 Dec 1970 | |
2 | PWR | WH 2-loop (DRY) | Operational | 591 | 25 Jul 1968 | 1 Oct 1972 | ||
Prairie Island | 1 | PWR | WH 2-loop (DRY) | Operational | 522 | 25 Jun 1968 | 16 Dec 1973 | |
2 | PWR | WH 2-loop (DRY) | Operational | 519 | 25 Jun 1969 | 21 Dec 1974 | ||
Quad Cities | 1 | BWR | BWR-4 (WET) | Operational | 908 | 15 Feb 1967 | 18 Feb 1973 | |
2 | BWR | BWR-4 (WET) | Operational | 911 | 15 Feb 1967 | 10 Mar 1973 | ||
Rancho Seco | 1 | PWR | WH (DRY) | Decommissioned | 873 | 1 Apr 1969 | 17 Apr 1975 | 23 Jun 1989 |
River Bend | 1 | BWR | BWR-6 (WET) | Operational | 967 | 25 Mar 1977 | 16 Jun 1986 | |
Salem | 1 | PWR | WH 4-loop (DRY) | Operational | 1169 | 25 Sep 1968 | 30 Jun 1977 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1158 | 25 Sep 1968 | 31 Oct 1981 | ||
San Onofre | 1 | PWR | WH (DRY) | Dismantled | 436 | 16 Jul 1964 | 1 Jan 1968 | 30 Nov 1992 |
2 | PWR | CE (DRY) | Shut down/in decommissioning | 1070 | 1 Mar 1974 | 8 Aug 1983 | 7 Jun 2013 | |
3 | PWR | CE (DRY) | Shut down/in decommissioning | 1180 | 1 Mar 1974 | 1 Apr 1984 | 7 Jun 2013 | |
Saxton | 1 | PWR | Decommissioned | 3 | 1 Jan 1960 | Nov 1961 | May 1972 | |
Seabrook Station | 1 | PWR | WH 4-Loop (DRY) | Operational | 1246 | 7 Jul 1976 | 15 Mar 1990 | |
Sequoyah | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1152 | 27 May 1970 | 1 Jul 1981 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1139 | 27 May 1970 | 1 Jun 1982 | ||
Shearon Harris | 1 | PWR | WH 3-Loop (DRY) | Operational | 964 | 28 Jan 1978 | 2 May 1987 | |
Shippingport | 1 | PWR | WH | Dismantled | 60 | 6 Sep 1954 | 26 May 1958 | Dec 1989 |
Shoreham | 1 | BWR | GE | Shut down | 820 | 1 Nov 1972 | 1 Aug 1986 | 1 May 1989 |
SRE | 1 | FBR | Decommissioned | 6.5 | 1954 | 12 Jul 1957 | 15 Feb 1964 | |
South Texas | 1 | PWR | WH 4-loop (DRY) | Operational | 1280 | 22 Dec 1975 | 25 Aug 1988 | |
2 | PWR | WH 4-loop (DRY) | Operational | 1280 | 22 Dec 1975 | 19 Jun 1989 | ||
St. Lucie | 1 | PWR | CE (DRY) | Operational | 981 | 1 Jul 1970 | 1 Mar 1976 | |
2 | PWR | CE (DRY) | Operational | 987 | 2 Jun 1977 | 10 Jun 1983 | ||
Surry | 1 | PWR | WH 3-loop (DRY) | Operational | 838 | 25 Jun 1968 | 22 Dec 1972 | |
2 | PWR | WH 3-loop (DRY) | Operational | 838 | 25 Jun 1968 | 1 May 1973 | ||
Susquehanna | 1 | BWR | BWR-5 (WET) | Operational | 1257 | 2 Nov 1973 | 12 Nov 1982 | |
2 | BWR | BWR-5 (WET) | Operational | 1257 | 2 Nov 1973 | 27 Jun 1984 | ||
Three Mile Island | 1 | PWR | B & W (DRY) | Shut down | 819 | 18 May 1968 | 2 Sep 1974 | 20 Sep 2019 |
2 | PWR | B & W (DRY) | Core melt | 880 | 1 Nov 1969 | 30 Dec 1978 | 28 Mar 1979 | |
Trojan | 1 | PWR | WH (DRY) | Dismantled | 1095 | 1 Feb 1970 | 20 May 1976 | 9 Nov 1992 |
Turkey Point | 1 | PWR | WH 3-loop (DRY) | Operational | 837 | 27 Apr 1967 | 14 Dec 1972 | |
2 | PWR | WH 3-loop (DRY) | Operational | 821 | 27 Apr 1967 | 7 Sep 1973 | ||
3 | PWR | AP1000 | Planned | 1100 | ||||
4 | PWR | AP1000 | Planned | 1100 | ||||
Vallecitos | 1 | BWR | BWR-1 | Shut down | 25 | 1 Jan 1956 | 19 Oct 1957 | 9 Dec 1963 |
Vermont Yankee | 1 | BWR | BWR-4 (WET) | Shut down | 605[153] | 11 Dec 1967 | 30 Nov 1972 | 29 Dec 2014[154] |
Virgil C. Summer | 1 | PWR | WH 3-Loop (DRY) | Operational | 1000 | 21 Mar 1973 | 1 Jan 1984 | |
Vogtle | 1 | PWR | WH 4-Loop (DRY) | Operational | 1150 | 1 Aug 1976 | 1 Jun 1987 | |
2 | PWR | WH 4-Loop (DRY) | Operational | 1152 | 1 Aug 1976 | 20 May 1989 | ||
3 | PWR | AP1000 | Operational | 1117 | 12 Mar 2013 | 31 Jul 2023[155] | ||
4 | PWR | AP1000 | Under construction | 1117 | 19 Nov 2013 | (2024)[156] | ||
Waterford | 1 | PWR | CE 2-loop (DRY) | Operational | 1168 | 14 Nov 1974 | 24 Sep 1985 | |
Watts Bar | 1 | PWR | WH 4-Loop (ICECOND) | Operational | 1157 | 20 Jul 1973 | 27 May 1996 | |
2 | PWR | WH 4-Loop (ICECOND) | Operational | 1164 | 1 Sep 1973 | 4 Jun 2016 | ||
Wolf Creek | 1 | PWR | WH 4-Loop (DRY) | Operational | 1200 | 31 May 1977 | 3 Sep 1985 | |
Yankee Rowe | 1 | PWR | WH (DRY) | Dismantled | 167 | 1 Nov 1957 | 1 Jul 1961 | 1 Oct 1991 |
Zion | 1 | PWR | WH (DRY) | Dismantled | 1040 | 1 Dec 1968 | 31 Dec 1973 | 13 Feb 1998 |
2 | PWR | WH (DRY) | Dismantled | 1040 | 1 Dec 1968 | 17 Sep 1974 | 13 Feb 1998 |
Uzbekistan
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Plant in the Jizzakh Region | 1 | PWR | VVER-1200 | Planned | 1200 | |||
2 | PWR | VVER-1200 | Planned | 1200 |
See also
- Economics of nuclear power plants
- Integrated Nuclear Fuel Cycle Information System
- List of nuclear power stations
- List of boiling water reactors
- List of largest power stations
- List of small modular reactor designs
- List of nuclear reprocessing sites
- Lists of nuclear disasters and radioactive incidents
- Nuclear power by country
Notes
- ↑ The full reactor model name is R3/Adam[119]
- ↑ The full reactor model name is ASEA-ATOM Gen II[120]
- ↑ The full reactor model name is ASEA-ATOM Gen II[120]
- ↑ The full reactor model name is ASEA-ATOM Gen III,[120] BWR-2500,[120] BWR 69[121]
- ↑ The full reactor model name is ASEA-ATOM Gen III,[120] BWR-2500,[120] BWR 69[121]
- ↑ The full reactor model name is ASEA-ATOM Gen IV,[120] BWR-3000,[120] BWR 75[121]
- ↑ The full reactor model name is ASEA-ATOM Gen I[120]
- ↑ The full reactor model name is ASEA-ATOM Gen II[120]
- ↑ The full reactor model name is ASEA-ATOM Gen IV,[120] BWR-3000,[120] BWR 75[122]
- ↑ The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[119]
- ↑ The full reactor model name is ASEA-ATOM Gen I.[120] Closed at midnight on New Year's Eve.[123]
- ↑ The full reactor model name is Westinghouse 3-loops[120]
- ↑ The full reactor model name is Westinghouse 3-loops[120]
- ↑ The full reactor model name is Westinghouse 3-loops[120]
References
- ↑ "World Nuclear Power Reactors & Uranium Requirements". World Nuclear Association. http://www.world-nuclear.org/information-library/facts-and-figures/world-nuclear-power-reactors-and-uranium-requireme.aspx.
- ↑ "PRIS – Home". https://pris.iaea.org/pris/.
- ↑ Reference Unit Power at IAEA
- ↑ "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/argentina.aspx.
- ↑ "China inks $8 bln nuclear power plant deal in Argentina" (in en). Reuters. 2 Feb 2022. https://www.reuters.com/business/energy/china-inks-nuclear-power-plant-deal-with-argentina-2022-02-02/.
- ↑ Yulia Kosarenko. "NASA fact sheet". http://www.candu.org/nasa.html.
- ↑ "BNamericas – The Embalse Nuclear Power Plant returns to s...". https://www.bnamericas.com/en/news/the-embalse-nuclear-power-plant-returns-to-service-for-a-new-cycle-of-30-years.
- ↑ "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News". https://www.world-nuclear-news.org/Articles/Metsamor-2-to-operate-until-2026.
- ↑ "Nuclear Power in Bangladesh – World Nuclear Association". http://world-nuclear.org/information-library/country-profiles/countries-a-f/bangladesh.aspx.
- ↑ "Installation begins of outer dome at Rooppur 1". https://www.world-nuclear-news.org/Articles/Outer-dome-installation-at-Rooppur-1-is-under-way.
- ↑ "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". https://www.rosatom.ru/journalist/news/energoblok-1-belorusskoy-aes-prinyat-v-promyshlennuyu-ekspluatatsiyu/.
- ↑ "Second Belarus unit enters commercial operation". https://world-nuclear-news.org/Articles/Second-Belarus-unit-enters-commercial-operation.
- ↑ "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 Sep 2022. https://www.brusselstimes.com/294161/doel-3-shutdown-confirmed-for-friday-despite-politicians-pleas.
- ↑ "RTBF Info of 21 Dec 2018". RTBF Info. 21 Dec 2018. https://www.rtbf.be/info/economie/detail_le-reacteur-nucleaire-de-doel-4-mis-a-l-arret-pour-des-raisons-operationnelles?id=10104084.
- ↑ "Second Belgian reactor enters retirement : Corporate - World Nuclear News". https://www.world-nuclear-news.org/Articles/Second-Belgian-reactor-enters-retirement.
- ↑ 16.0 16.1 16.2 "Plans for New Nuclear Reactors Worldwide - World Nuclear Association". https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx.
- ↑ 17.0 17.1 17.2 "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org (World Nuclear News). 25 Oct 2023. https://www.world-nuclear-news.org/Articles/Bulgaria-to-push-ahead-with-two-new-units-at-Kozlo.
- ↑ "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005. https://www.theglobeandmail.com/news/national/utility-abandons-pickering-reactor-overhaul/article18243747/.
- ↑ "Ontario extends Pickering operations". 30 September 2022. https://www.world-nuclear-news.org/Articles/Ontario-extends-Pickering-operations. Retrieved 7 July 2023.
- ↑ 20.0 20.1 Patel, Sonal (2 Dec 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection" (in en-US). https://www.powermag.com/darlington-nuclear-plant-will-get-a-bwrx-300-smr-as-ge-hitachi-bags-lucrative-opg-selection/.
- ↑ "Additional SMRs in the pipeline for Darlington". World Nuclear News. 7 July 2023. https://www.world-nuclear-news.org/Articles/Additional-SMRs-in-the-pipeline-for-Darlington. Retrieved 7 July 2023.
- ↑ "Unit 2 sets record run ahead of planned maintenance outage". 6 May 2022. https://www.brucepower.com/2022/05/06/unit-2-sets-record-run-ahead-of-planned-maintenance-outage/. Retrieved 7 July 2023.
- ↑ "Life-Extension Program & MCR Project". https://www.brucepower.com/life-extension-program-mcr-project/. Retrieved 7 July 2023.
- ↑ "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News". https://www.world-nuclear-news.org/Articles/Bruce-6-re-enters-commercial-operation.
- ↑ 25.0 25.1 "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. https://www.nucnet.org/news/construction-begins-of-two-hualong-one-reactors-at-changjiang-11-2-2019.
- ↑ 26.0 26.1 "我国自主三代核电华龙一号在海南正式开工建设". CNNC. http://www.cnnc.com.cn/cnnc/index/tpxwtj/563663/index.html.[yes|permanent dead link|dead link}}]
- ↑ "China's first Hualong One nuclear reactor starts Opened". Reuters. 30 Jan 2021. https://www.reuters.com/article/us-china-nuclearpower-idUSKBN29Z071.
- ↑ "Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Second-Fuqing-Hualong-One-enters-commercial-operat.
- ↑ "Second AP1000 enters Opened". World Nuclear Association. http://www.world-nuclear-news.org/Articles/Second-AP1000-enters-commercial-operation?feed=feed.
- ↑ "Fourth Chinese AP1000 enters Opened". World Nuclear Association. http://www.world-nuclear-news.org/Articles/Fourth-Chinese-AP1000-enters-commercial-operation.
- ↑ "Begin
buildings on third Haiyang unit". World Nuclear Association. http://www.world-nuclear-news.org/Articles/Construction-starts-on-third-Haiyang-unit. - ↑ "Construction begins of fourth Haiyang unit". World Nuclear Association. https://www.world-nuclear-news.org/Articles/Construction-begins-of-fourth-Haiyang-unit.
- ↑ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power.aspx.
- ↑ "Fifth Hongyanhe unit enters Opened". World Nuclear Association. https://www.world-nuclear-news.org/Articles/Fifth-Hongyanhe-unit-enters-commercial-operation.
- ↑ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". http://www.world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power.aspx.
- ↑ "Construction of Lufeng 5 gets under way". World Nuclear Association. https://www.world-nuclear-news.org/Articles/Construction-of-Lufeng-5-gets-under-way.
- ↑ "Construction of Lufeng 6 begins". World Nuclear Association. https://www.world-nuclear-news.org/Articles/Construction-of-Lufeng-unit-6-begins.
- ↑ "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. https://www.world-nuclear-news.org/Articles/Construction-of-new-Chinese-power-plant-begins.
- ↑ "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". https://www.neimagazine.com/news/newsfirst-concrete-for-unit-2-of-chinas-sanao-nuclear-power-project-9360720.
- ↑ "First AP1000 reactor enters Opened". World Nuclear Association. http://www.world-nuclear-news.org/Articles/First-AP1000-reactor-enters-commercial-operation.
- ↑ "Sanmen 2 AP1000 enters Opened – World Nuclear News". world-nuclear-news.org. http://www.world-nuclear-news.org/Articles/Sanmen-2-AP1000-enters-commercial-operation.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=995.
- ↑ "Begin
buildings on fourth Sanmen unit". https://www.world-nuclear-news.org/Articles/Construction-starts-on-fourth-Sanmen-unit. - ↑ "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News". https://www.world-nuclear-news.org/Articles/Chinese-HTR-PM-Demo-begins-commercial-operation.
- ↑ 45.0 45.1 "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. https://asia.nikkei.com/Business/Energy/China-approves-first-new-nuclear-reactors-in-3-plus-years.
- ↑ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale" (in fr). Capital.fr. 14 Dec 2018. https://www.capital.fr/entreprises-Mares/edf-le-premier-des-2-epr-de-la-centrale-de-taishan-chine-entre-en-exploitation-commerciale-1319856.[yes|permanent dead link|dead link}}]
- ↑ "World's second EPR starts operations". http://www.world-nuclear-news.org/Articles/World-s-second-EPR-starts-operations.
- ↑ "Fourth Tianwan unit enters Opened". World Nuclear Association. http://www.world-nuclear-news.org/Articles/Fourth-Tianwan-unit-enters-commercial-operation.
- ↑ "Fifth Tianwan unit starts Opened". World Nuclear Association. https://www.world-nuclear-news.org/Articles/Fifth-Tianwan-unit-starts-commercial-operation.
- ↑ "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News". https://world-nuclear-news.org/Articles/Tianwan-6-enters-commercial-operation.
- ↑ "Begin
buildings on eighth Tianwan unit: New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Construction-starts-on-eighth-Tianwan-unit. - ↑ "Fast nuclear reactor to start construction in Fujian in 2017". 16 Aug 2015. http://www.wantchinatimes.com/news-subclass-cnt.aspx?cid=1205&MainCatID=12&id=20150816000002.
- ↑ 53.0 53.1 "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. https://www.world-nuclear-news.org/Articles/China-starts-building-second-CFR-600-fast-reactor.
- ↑ "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. https://www.world-nuclear-news.org/Articles/Work-on-Xudabao-unit-1-gets-under-way.
- ↑ "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". https://www.ruscable.ru/news/2021/05/19/Dan_start_sooruzheniu_novyx_blokov_rossijskogo_diz/.
- ↑ "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Construction-of-Xudapu-4-under-way.
- ↑ "Yangjiang 5 enters Opened". world-nuclear-news.org. http://www.world-nuclear-news.org/NN-Yangjiang-5-enters-commercial-operation-1307184.html.
- ↑ "Begin
buildings on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. http://www.world-nuclear-news.org/Articles/Construction-starts-on-first-Zhangzhou-unit. - ↑ "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Construction-of-Egypts-first-nuclear-power-plant-u.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=138.
- ↑ "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News". https://www.world-nuclear-news.org/Articles/Construction-begins-of-third-unit-at-Egypt-s-El-Da.
- ↑ "Nuclear power plants in Finland". 6 Apr 2021. https://www.stuk.fi/web/en/topics/nuclear-power-plants/nuclear-power-plants-in-finland.
- ↑ "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022. https://www.world-nuclear-news.org/Articles/Fennovoima-cancels-Hanhikivi-1-contract-with-Russi.
- ↑ "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022. https://tass.com/economy/1446237.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=160.
- ↑ "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News". https://www.world-nuclear-news.org/Articles/Faulty-seals-replaced-in-Olkiluoto-EPR.
- ↑ "Further delay to Flamanville EPR start up". https://www.world-nuclear-news.org/Articles/Further-delay-to-Flamanville-EPR-start-up.
- ↑ "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". https://world-nuclear-news.org/Articles/EDF-begins-permitting-process-for-two-new-reactors. Retrieved 9 December 2023.
- ↑ 69.0 69.1 "Germany shuts three of its last six nuclear plants". https://www.reuters.com/markets/commodities/germany-shuts-three-its-last-six-nuclear-plants-2022-01-01/.
- ↑ "German reactor permanently shut down". world-nuclear-news.org. http://www.world-nuclear-news.org/C-German-reactor-permanently-shut-down-0201184.html.
- ↑ "Germany shuts down Philippsburg 2". energycentral.com. https://www.energycentral.com/news/germany-shuts-down-philippsburg-2.
- ↑ "Indian Nuclear Power Program". http://www.dae.gov.in/power/npcil.htm.
- ↑ 73.00 73.01 73.02 73.03 73.04 73.05 73.06 73.07 73.08 73.09 73.10 73.11 73.12 73.13 73.14 73.15 73.16 73.17 73.18 "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)". https://aris.iaea.org/PDF/IPHWR-220.pdf.
- ↑ 74.0 74.1 74.2 74.3 "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)". https://aris.iaea.org/PDF/IPHWR-700.pdf.
- ↑ "В Индии началось сооружение блока № 6 АЭС "Куданкулам"" (in ru). http://ase-ec.ru/for-journalists/news/2021/dec/v-indii-nachalos-sooruzhenie-bloka-6-aes-kudankulam/.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=302.
- ↑ "Genkai unit 4 supplying power again". world-nuclear-news.org. http://www.world-nuclear-news.org/C-Genkai-unit-4-supplying-power-again-1906185.html.
- ↑ 78.0 78.1 78.2 78.3 78.4 78.5 78.6 78.7 "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". http://www.genanshin.jp/english/facility/map/.
- ↑ "東通原子力発電所1号機の着工について". https://www.tepco.co.jp/cc/press/11012501-j.html.
- ↑ 80.0 80.1 "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". http://www.fepc.or.jp/english/nuclear/power_generation/plants/index.html.
- ↑ "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. https://www3.nhk.or.jp/news/html/20210623/k10013099101000.html.
- ↑ "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. https://www3.nhk.or.jp/nhkworld/en/news/20180509_30/.
- ↑ "Japan clears restart at nuclear reactor closest to epicenter of 2011 quake – Reuters". Reuters. https://www.reuters.com/article/us-japan-nuclear-restarts-idUSKBN1Y10K7?taid=5dde31da16deae000192ba13.
- ↑ "First Japanese BWR cleared for restart : Regulation & Safety – World Nuclear News". https://www.world-nuclear-news.org/Articles/First-Japanese-BWR-cleared-for-restart.
- ↑ "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". https://www3.nhk.or.jp/lnews/fukui/20230728/3050015301.html.
- ↑ "Takahama 2 reactor restarted". https://www.world-nuclear-news.org/Articles/Takahama-2-reactor-restarted.
- ↑ "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. https://www.reuters.com/article/japan-nuclear-restarts/japan-approves-extension-for-reactor-similar-to-fukushima-units-that-melted-down-idUSL4N1XI1TR.
- ↑ 88.0 88.1 "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North (U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies). 14 Jan 2016. http://38north.org/2016/01/yongbyon011416/.
- ↑ "PRIS - Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=1067.
- ↑ "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 Mar 2022. https://www.world-nuclear-news.org/Articles/Philippines-relaunches-nuclear-energy-programme. Retrieved 29 Apr 2022.
- ↑ 91.0 91.1 91.2 91.3 "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 Oct 2022. https://www.world-nuclear-news.org/Articles/Poland-s-Westinghouse-choice-deepens-strategic-re.
- ↑ "Poland's government confirms Westinghouse for nuclear plant". 4 Nov 2022. https://www.world-nuclear-news.org/Articles/Poland%E2%80%99s-government-confirms-Westinghouse-for-nucl.
- ↑ "South Korea's KHNP signs letter of intent on Polish nuclear". 31 Oct 2022. https://www.world-nuclear-news.org/Articles/South-Korea-s-KHNP-signs-letter-of-intent-on-Polis.
- ↑ 94.0 94.1 94.2 94.3 94.4 94.5 94.6 "Taki reaktor chcą zbudować Orlen i Synthos". 18 Apr 2023. https://energetyka24.com/atom/analizy-i-komentarze/taki-reaktor-chca-zbudowac-orlen-i-synthos-znamy-jego-szczegoly-analiza/.
- ↑ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". http://rosatom.ru/en/press-centre/news/rosatom-s-first-of-a-kind-floating-power-unit-connects-to-isolated-electricity-grid-in-pevek-russia-/.
- ↑ 96.0 96.1 "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". http://www.world-nuclear.org/information-library/country-profiles/countries-o-s/russia-nuclear-power.aspx.
- ↑ "Кольскую АЭС-2 начнут строить в 2028 году". https://strana-rosatom.ru/2021/06/18/kolskuju-aes-2-nachnut-stroit-v-2028-godu/. Retrieved 9 December 2023.
- ↑ "Kursk's second unit retires after 45 years operation". https://world-nuclear-news.org/Articles/Kursk-s-second-unit-retired-after-45-years-operati.
- ↑ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. http://www.rosenergoatom.ru/en/for-journalists/news/31061/.
- ↑ "Russia retires Leningrad unit 1". World Nuclear Association. http://www.world-nuclear-news.org/Articles/Russia-retires-Leningrad-unit-1.
- ↑ "Four New NPP Units Will be Built in Russia". https://rosatom-europe.com/press-centre/news/four-new-npp-units-will-be-built-in-russia/.
- ↑ "Росатом планирует начать строительство второй очереди ЛАЭС-2 в 2024 году". https://tass.ru/ekonomika/15163315.
- ↑ "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Russia-commits-to-further-floating-nuclear-power-p.
- ↑ ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа" (in ru). https://www.interfax.ru/business/788323.
- ↑ "Russia plans new generation of FNPPS – Nuclear Engineering International". https://www.neimagazine.com/news/newsrussia-plans-new-generation-of-fnpps-8442344.
- ↑ 106.0 106.1 "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". https://aem-group.ru/mediacenter/news/zalozhen-korpus-pervogo-plavuchego-energobloka-v-arkticheskom-ispolnenii-na-baze-reaktorov-ritm-200.html.
- ↑ "В Якутии собираются строить АЭС мощностью не менее 55 МВт". https://sakhapress.ru/archives/269241.
- ↑ ""Росатом" начал строительство реактора Брест-300 в Северске". 8 Jun 2021. https://iz.ru/1175752/2021-06-08/rosatom-nachal-stroitelstvo-reaktora-brest-300-v-severske.
- ↑ "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". https://www.neimagazine.com/news/newsrussia-prepares-to-build-new-nuclear-reactors-at-leningrad-and-smolensk-7997091.
- ↑ "VVER units planned for Leningrad and Smolensk". https://www.ans.org/news/article-326/vver-units-planned-for-leningrad-and-smolensk/.
- ↑ Shut down after a 1977 refuelling incident; decommission in progress since 1979
- ↑ "Tlačová agentúra Slovenskej republiky – TASR.sk". Archived from the original on 20 Jan 2009. https://web.archive.org/web/20090120010401/http://www.tasr.sk/30.axd?k=20090110TBB00423.
- ↑ "Power commissioning of Mochovce 3 completed". https://www.seas.sk/en/press-releases/mochovce-3-commissioning-trial-run/.
- ↑ "Krško gets an overhaul : Corporate – World Nuclear News". https://www.world-nuclear-news.org/Articles/Krsko-gets-an-overhaul.
- ↑ "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030." (in hr). 30 Nov 2022. https://tockanai.hr/biznis/drugi-blok-ne-krsko-prve-megavate-mogao-bi-dati-nakon-2030-64033/.
- ↑ "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News". https://www.world-nuclear-news.org/Articles/South-Korean-APR-1400-starts-commercial-operation.
- ↑ 117.0 117.1 "Korea to resume construction of Shin Hanul 3&4". https://www.neimagazine.com/news/newskorea-to-resume-construction-of-shin-hanul-34-10946507.
- ↑ "Second APR-1400 unit starts Opened". world-nuclear-news.org. http://www.world-nuclear-news.org/Articles/Second-APR-1400-unit-starts-commercial-operation.
- ↑ 119.0 119.1 "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden" (in sv). The Swedish Radiation Safety Authority. 2007-03-31. https://www.stralsakerhetsmyndigheten.se/publikationer/rapporter/sakerhet-vid-karnkraftverken/2007/200718/.
- ↑ 120.00 120.01 120.02 120.03 120.04 120.05 120.06 120.07 120.08 120.09 120.10 120.11 120.12 120.13 120.14 120.15 "IAEA Sweden reactors" (in en). IAEA. 2023-01-11. https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=SE.
- ↑ 121.0 121.1 121.2 "Forsmarks reaktorer i siffror" (in sv). Vattenfall. Apr 2016. https://group.vattenfall.com/se/siteassets/sverige/forsmark/produktion/forsmarks-reaktorer-i-siffror-2016.pdf.
- ↑ "MILSTOLPAR I VÅR HISTORIA" (in sv). Westinghouse. https://www.westinghousenuclear.com/sweden/om-oss/historik/milstolpar-i-var-historia.
- ↑ "Ringhals 1 inne på slutspurten" (in sv). SVT. 26 Oct 2020. https://www.svt.se/nyheter/lokalt/halland/ringhals-1-inne-pa-slutstrackan.
- ↑ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy , 25 May 2011
- ↑ "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 Jul 2021. https://www.world-nuclear-news.org/Articles/Early-shutdown-for-Taiwanese-reactor. Retrieved 29 Apr 2022.
- ↑ "Major components in place at Akkuyu 1 : New Nuclear". World Nuclear News. 4 Mar 2022. https://www.world-nuclear-news.org/Articles/Major-components-in-place-at-Akkuyu-1. Retrieved 29 Apr 2022.
- ↑ "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Construction-begins-of-fourth-Turkish-reactor.
- ↑ "Japan looks to cancel Turkish project – Nuclear Engineering International". https://www.neimagazine.com/news/newsjapan-looks-to-cancel-turkish-project-6887714.
- ↑ "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News". 20 January 2020. https://www.hurriyetdailynews.com/turkey-japan-scrap-partnership-in-sinop-nuclear-plant-in-turkeys-north-151212.
- ↑ "В Україні збудують нову атомну станцію: названо місто будівництва". 22 September 2022. https://gsminfo.com.ua/128698-v-ukrayini-zbuduyut-novu-atomnu-stancziyu-nazvano-misto-budivnycztva.html. Retrieved 9 December 2023.
- ↑ "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". 12 Feb 2021. http://www.xaec.org.ua/store/pages/ukr/khnppnews/2021-02-12/83.html.
- ↑ "Ukraine planning for post-war nuclear power plants : New Nuclear – World Nuclear News". https://www.world-nuclear-news.org/Articles/Ukraine-planning-for-post-war-nuclear-power-plants.
- ↑ 133.0 133.1 133.2 "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO". https://ecoclubrivne.org/en/new-nuclear-reactors-in-ukraine/.
- ↑ "UAE's first nuclear power plant begins Openeds". Reuters. 6 Apr 2021. https://www.reuters.com/article/us-emirates-nuclearpower/uaes-first-nuclear-power-plant-begins-commercial-operations-idUSKBN2BT16E?il=0.
- ↑ "Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022. https://www.nucnet.org/news/unit-2-begins-commercial-operation-at-arab-world-s-first-nuclear-station-3-4-2022.
- ↑ "Third Barakah unit begins Opened : New Nuclear - World Nuclear News". https://www.world-nuclear-news.org/Articles/Third-Barakah-unit-begins-commercial-operation.
- ↑ 137.0 137.1 137.2 137.3 "Heysham 2 and Torness end dates brought forward by EDF : Corporate – World Nuclear News". https://www.world-nuclear-news.org/Articles/EDF-confirms-earlier-end-date-for-Heysham-2-and-To.
- ↑ "Hinkley Point B enters retirement : Corporate – World Nuclear News". https://www.world-nuclear-news.org/Articles/Hinkley-Point-B-enters-retirement.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=245.
- ↑ "Hunterston B nuclear power station retires after 46 years in service". 7 Jan 2022. https://www.theguardian.com/business/2022/jan/07/hunterston-b-nuclear-power-station-retires-after-46-years-in-service.
- ↑ "The Sizewell C project – National Infrastructure Planning". https://infrastructure.planninginspectorate.gov.uk/projects/eastern/the-sizewell-c-project/?ipcsection=overview.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=239.
- ↑ "PRIS – Reactor Details". https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=601.
- ↑ "PRIS – Reactor Details". https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=737.
- ↑ "PRIS – Reactor Details". https://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=738.
- ↑ "Brunswick-1". IAEA. http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=662.
- ↑ "Brunswick-2". IAEA. http://www.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=661.
- ↑ "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 Jul 2021. https://www.world-nuclear-news.org/Articles/Scaled-down-SMR-pilot-project-remains-on-course. Retrieved 29 Apr 2022.
- ↑ "Idaho SMR project terminated". 9 November 2023. https://www.world-nuclear-news.org/Articles/Idaho-SMR-project-terminated.
- ↑ 150.0 150.1 150.2 150.3 "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 Apr 2015. https://www.ans.org/news/article-1686/tva-prepares-to-write-final-nuclear-chapters/.
- ↑ 151.0 151.1 151.2 151.3 151.4 151.5 151.6 151.7 Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park". http://www.tva.gov/environment/reports/hartsville/hartsville_ea.pdf.
- ↑ 152.0 152.1 "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 Apr 2020. http://www.safesecurevital.com/entergy-s-indian-point-unit-2-to-shut-down-permanently/.
- ↑ "PRIS – Reactor Details". https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=626.
- ↑ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity , 29 Dec 2014
- ↑ "Vogtle Unit 3 goes into operation". Cision. 31 Jul 2023. https://www.prnewswire.com/news-releases/vogtle-unit-3-goes-into-operation-301889148.html. Retrieved 31 Jul 2023.
- ↑ "Further delay in startup of Vogtle AP1000s : New Nuclear". World Nuclear News. 18 Feb 2022. https://www.world-nuclear-news.org/Articles/Further-delay-in-startup-of-Vogtle-AP1000s. Retrieved 29 Apr 2022.
External links
- IAEA list as of 2006
- NED Database of Commercial Nuclear Power Reactors
- Reactors Database by the World Nuclear Association
Original source: https://en.wikipedia.org/wiki/List of commercial nuclear reactors.