FunctionMedium-class launch vehicle to complement the light Vega and heavy Ariane 5
ManufacturerProgress Rocket Space Centre, NPO Lavochkin
Country of originRussia
Size
Height46.2 m (152 ft)
Diameter10.3 m (34 ft)
Mass308 t (303 long tons; 340 short tons)
Stages3
Capacity
Payload to GTO3,250 kg (7,170 lb)
Payload to GEO1,440 kg (3,170 lb)
Payload to SSO4,400 kg (9,700 lb)[1]:43
Associated rockets
FamilySoyuz-2 (R-7)
Launch history
StatusTemporary Suspended
Launch sitesCentre Spatial Guyanais
Total launches27
Successes26
Failures0
Partial failures1
First flight21 October 2011 [2]
Last flight10 February 2022
Boosters
No. boosters4 [1]:21
Length19.6 m (64 ft)
Diameter2.68 m (8 ft 10 in)
Empty mass3,784 kg (8,342 lb)
Gross mass44,413 kg (97,914 lb)
Engines1 RD-107A
Thrust838.5 kN (188,500 lbf)
Specific impulse262 seconds
Burn time118 seconds
FuelLOX / kerosene
Core stage
Length27.1 m (89 ft)
Diameter2.95 m (9 ft 8 in)
Empty mass6,545 kg (14,429 lb)
Gross mass99,765 kg (219,944 lb)
Engines1 RD-108A
Thrust792.5 kN (178,200 lbf)
Specific impulse255 seconds
Burn time286 seconds
FuelLOX / kerosene
Second stage (ST-B)
Length6.7 m (22 ft)
Diameter2.66 m (8 ft 9 in)
Empty mass2,355 kg (5,192 lb)
Gross mass27,755 kg (61,189 lb)
Engines1 RD-0124
Thrust297.9 kN (67,000 lbf)
Specific impulse359 seconds
Burn time270 seconds
FuelLOX / kerosene
Upper stage – Fregat
Length1.5 m (4 ft 11 in)
Diameter3.35 m (11.0 ft)
Empty mass920 kg (2,030 lb)
Gross mass7,558 kg (16,663 lb)
EnginesS5.92
Thrust19.85 kN (4,460 lbf) / 14 kN (3,100 lbf)
Specific impulse332 seconds
Burn timeUp to 1100 seconds (up to 20 starts)
FuelN2O4 / UDMH

Soyuz at the Guiana Space Centre (also known as Soyuz at CSG or Arianespace Soyuz) was a European Space Agency (ESA) programme for operating Soyuz-ST launch vehicles from Centre Spatial Guyanais (CSG), providing medium-size launch capability for Arianespace to complement the light Vega and heavy-lift Ariane 5.[3] The Soyuz vehicle was supplied by the Roscosmos with TsSKB-Progress and NPO Lavochkin, while additional components were supplied by Airbus, Thales Group and RUAG.[1]:28–30 Autor LV (ICBM) = NPO "Energia", Kaliningrad.

The Arianespace Soyuz project was announced by the ESA in 2002. Cooperation with Russia began in two areas: construction of a launch site for Soyuz in CSG and development of the Soyuz launch vehicle modified for the Guiana Space Centre. A Programme Declaration was signed in 2003 and funding along with final approval was granted on 4 February 2005.[4][5] Initial excavation for the Ensemble de Lancement Soyouz (ELS; Soyuz Launch Complex) began in 2005, construction started in 2007, and the launch complex was completed in early 2011,[6] allowing Arianespace to offer launch services on the modified Soyuz ST-B to its clients.[1][7] Two early flights, VS02 and VS04, and a recent flight, VS17, used the Soyuz ST-A variant.[8][9][10] Since 2011, Arianespace has ordered a total of 23 Soyuz rockets, enough to cover its needs until 2019 at a pace of three to four launches per year.[11][12]:10 Due to Russia's invasion of Ukraine, Soyuz launches from the Guiana Space Centre have been suspended.[13]

Features of modified Soyuz for the Guiana Space Centre

  • First use of a mobile service tower at the ELS that enabled vertical payload integration.[1]
  • European supplied payload adapters.[1]
  • European supplied KSE (French: Kit de Sauvegarde Européenne, lit. 'European Safeguard Kit'), a system to locate and transmit a flight termination signal.[1] It would command the engines to shut down and leave the vehicle in a ballistic trajectory.[14]
  • Adaptation of the S-Band telemetry system on all stages from the 5 TM bands available at Baikonur, and Plesetsk to the 3 allowed at the CSG range.[1]
  • Adaptation of the S-Band telemetry coding and frequency to the Inter-Range Instrumentation Group (IRIG) standard used at CSG.[1]
  • Adaptation of the oxygen purge system for directing to the outside of the mobile gantry.[1]
  • Adaptation to the tropical CSG climate including the adaptation of the air conditioning system to local specifications and protective measures to avoid icing.[1] All holes and cavities were studied and certified to be adequately protected against intrusion of insects and rodents.[14]
  • The four boosters and the core stage were upgraded with pyrotechnic devices to breach the fuel tanks to assure that they would sink in the ocean. The other stages were shown to lose structural integrity on impact and thus proven to sink.[14]
  • At least initially, the boosters and core stage would use the pyrotechnically ignited 14D22 (RD-107A) and 14D23 (RD-108A) rather than the chemically ignited 14D22 KhZ and 14D23 KhZ used on the rest of the Soyuz-2.[14]

Vehicle processing

Soyuz components arrived at the CSG via ship, and were unloaded and placed in a storage area. From there, the components were brought to the Launch Vehicle Integration Building where they were assembled horizontally in an air-conditioned environment. First four boosters were attached to the core stage, and then the third stage was attached to the core – identical to the procedure at Baikonur and Plesetsk Cosmodrome. Separately, the payload was mounted on a dispenser in a Payload Processing Facility and then transferred into the S3B building to be mounted to the Fregat upper stage and then encapsulated in a fairing. Subsequently, the first 3 stages of the Soyuz-ST were transported from the Integration Building to the launch pad by a train which also erected the rocket to the vertical position at the pad, where Soyuz was suspended by four support arms. Once vertical, a mobile gantry moved in and enclosed Soyuz. Following that the encapsulated Fregat and payload was lifted vertically by a mobile gantry to be mounted on top of Soyuz. The Mobile Gantry was retracted an hour before the launch.[15][16][17][18][19]

Future developments

Arianespace planned to operate Soyuz until at least the end of 2019, and as of 2014 intended to continue operating Soyuz alongside the planned Ariane 6 when that launcher makes its debut.[11][20] However, the announcement of new Ariane 6 designs from Airbus and Safran opens the possibility of Ariane 6.2 replacing Soyuz.[21] As Ariane 6 flight test slips to 2022,[22] several flights were planned for Soyuz as late as 2022 before the Russians pulled out.

Launch history

Inaugural flight

The first contract for the launch of Soyuz ST-B from Centre Spatial Guyanais (CSG) was signed at the 2009 Paris Air Show by the Director of the Galileo Programme and Navigation-related Activities René Oosterlinck and a CEO of Arianespace Jean-Yves Le Gall. This contract covered 2 launches of two Galileo satellites each.[23] The contract for the satellites themselves had already been signed by ESA and Galileo Industries in 2006.[24]

Launch vehicle components shipped from Saint Petersburg first arrived in French Guiana by ship in November 2009.[25] The Soyuz Launch Site acceptance review took place during the last week of March 2011, leading to the first simulated launch campaign between 29 April and 4 May 2011.[6][26] The launch site was officially handed over from ESA to the Arianespace on 7 May 2011.[27]

Assembly of the Soyuz ST-B begun on 12 September 2011 in the Assembly and Testing building, while two Galileo satellites underwent final tests after their arrival from Thales Alenia Space facilities in Italy on 7 and 14 September 2011.[28] The launch was planned for 20 October 2011, however an anomaly was detected in the pneumatic system responsible for disconnecting the fuel lines from Soyuz third stage, forcing the mission to be postponed for 24 hours. On 21 October 2011, at 10:30 UTC, Soyuz ST-B took off for its inaugural, 3 hour 49 minute, flight,[29] making it the first time Soyuz was launched outside of the former Soviet Union territory.[30]

Flight VS09

On 22 August 2014, Arianespace launched the first two Full Operational Capability satellites for the Galileo satellite navigation constellation into medium Earth orbit.[31] The mission appeared to proceed normally and Arianespace reported the launch to be a success, however analysis of telemetry data provided by ESA and CNES tracking stations showed that the satellites were injected into an incorrect orbit.[32]

Orbit Inclination Eccentricity
Targeted 23,222 × 23,222 km 55.0° 0.00
Achieved 25,900 × 13,713 km 49.8° 0.23

The orbit was determined by the European Space Operations Centre within 3 hours after the separation from launcher, and the satellites were operating normally and under control.[33] Both satellites were switched to safe mode, pointing at the sun while both ESA/CNES and OHB teams investigated the failure and options for the satellites.[34]

On 25 August 2014, Arianespace announced the creation of an independent inquiry commission to investigate the anomaly.[35] On 28 August 2014, details emerged on the events that most likely led to a failure of the Fregat upper stage. At the end of the re-orientation phase the flight control system detected an incorrect angular speed and unsuccessfully attempted to use thrusters to correct the situation. The flight control system did not detect the thruster issue and continued the flight plan with the upper stage oriented in a wrong direction, leaving the satellites in an incorrect orbit.[36]

In late September 2014, the Roscosmos commission report, quoted by Izvestia, indicated that the Fregat failure was due to a design flaw leading to freezing in one of the hydrazine propellant lines, which was placed alongside a line carrying cold helium used for pressurization of the main propellant tanks. During the long first burn required for Galileo orbital insertion the propellant line was cooled to below the freezing point of hydrazine. Further investigations were focused on the software error and a means to prevent similar failures in future. Izvestia also reported that the failure of flight VS09 caused a serious reaction in Russian government. Oleg Ostapenko, head of Roscosmos, had a "difficult conversation in the (Moscow) White House".[37][38]

On 7 October 2014, the Independent Inquiry Board announced the conclusions of its investigation, revealing that a proximity of helium and hydrazine feed lines resulted in a thermal bridge that caused an interruption of propellant supply to the thrusters. Ambiguities in the design documents allowing this to happen were a result of not taking into account thermal transfers in the thermal analyses of the stage system design. The Board recommended 3 corrective actions: Revamping thermal analysis, correcting design documents and modification of manufacture, assembly, integration and inspection procedures of the supply lines.[39]

In November 2014, ESA announced the satellites would perform a total of 15 orbital maneuvers to raise their perigee to 17,339 km. This would reduce the satellites' exposure to the Van Allen radiation belt, reduce the doppler effect, increase satellite visibility from the ground, and allow the satellites to keep their antennas pointed at Earth during perigee. These orbits would repeat the same ground track every 20 days, allowing synchronization with other Galileo satellites which repeat the same ground track every 10 days. Once in their new orbits the satellites could begin in-orbit testing.[40]

Recovery of the satellites concluded in March 2015, when Galileo-FOC FM2 entered a new orbit, mirrored to the orbit of Galileo-FOC FM1, which concluded its manoeuvres on the end of November 2014 and successfully passed testing. Currently satellites overfly the same location on the ground every 20 days, comparing to 10 days of standard Galileo satellites.[41]

Missions

Date and
time, UTC
Flight Payload Payload mass Orbit Result No.
21 October 2011,
10:30:26
VS01 [2] Galileo IOV-1/2 1,580 kg (3,480 lb) MEO Success 1
17 December 2011,
02:03:48
VS02 [42] Pleiades 1, SSOT, 4 x ELISA 2,191 kg (4,830 lb) SSO Success 2
12 October 2012,
18:15:01
VS03 [43] Galileo IOV-3/4 1,580 kg (3,480 lb) MEO Success 3
2 December 2012,
02:02:50
VS04 [44] Pléiades 1B 1,070 kg (2,360 lb) SSO Success 4
25 June 2013,
19:27:03
VS05 [45] O3b F1 3,204 kg (7,064 lb) MEO Success 5
19 December 2013,
09:12:19
VS06 [46] Gaia 2,105 kg (4,641 lb) L2 Success 6
3 April 2014,
21:02:26
VS07 [47] Sentinel-1A 2,272 kg (5,009 lb) SSO Success 7
10 July 2014,
18:55:56
VS08 [48] O3b F2 3,204 kg (7,064 lb) MEO Success 8
22 August 2014,
12:27:11
VS09 [31] Galileo FOC FM1/FM2 1,607 kg (3,543 lb) MEO Partial failure [49] 9
18 December 2014,
18:37:00
VS10 [50] O3b F3 3,184 kg (7,020 lb) MEO Success 10
27 March 2015,
21:46:19
VS11 [51] Galileo FOC FM3/FM4 1,597 kg (3,521 lb) MEO Success 11
12 September 2015,
02:08:10
VS12 [52] Galileo FOC FM5/FM6 1,601 kg (3,530 lb) MEO Success 12
17 December 2015,
11:51:56
VS13 [53] Galileo FOC FM8/FM9 1,603 kg (3,534 lb) MEO Success 13
25 April 2016,
21:02:13
VS14 [54] Sentinel-1B,[55] MICROSCOPE, 3 CubeSats 3,099 kg (6,832 lb) SSO Success 14
24 May 2016,
08:48:43
VS15 [56] Galileo FOC FM10/FM11 1,599 kg (3,525 lb) MEO Success 15
28 January 2017,
01:03:34
VS16 Hispasat 36W-1 3,200 kg (7,100 lb) GTO Success 16
18 May 2017,
11:54:53
VS17 [57] SES-15 2,302 kg (5,075 lb) GTO Success 17
9 March 2018,
14:10:06
VS18 [58] O3b F4 3,198 kg (7,050 lb) MEO Success 18
7 November 2018,
03:47:27
VS19 [59] MetOp-C[60] 4,212 kg (9,286 lb) SSO Success 19
19 December 2018,
16:37:14
VS20 [61] CSO-1 3,565 kg (7,859 lb) SSO Success 20
27 February 2019,
21:37:00
VS21 [62] OneWeb F6 1,945.2 kg (4,288 lb) LEO Success 21
4 April 2019,
17:03:37
VS22 O3b F5 3,177 kg (7,004 lb) MEO Success 22
18 December 2019,
08:54:20
VS23 CHEOPS, COSMO-SkyMed[63] 3,250 kg (7,170 lb) SSO Success 23
2 December 2020
01:33:28 [64]
VS24 FalconEye-2 1,190 kg (2,620 lb) SSO Success 24
29 December 2020
16:42:07[65]
VS25 CSO-2 3,562 kg (7,853 lb) SSO Success 25
5 December 2021
00:19:20[66]
VS26 Galileo FOC FM23/FM24 1,645 kg (3,627 lb) MEO Success 26
10 February 2022
18:09:37[67]
VS27 OneWeb F13 5,495 kg (12,114 lb) LEO Success 27
Flights by Mission Result
Script error: No such module "Chart".

  Success     Failure     Partial Failure   Scheduled  

Soyuz launch statistics from Guiana as of July 2019. Source: data from wikitable Missions, wikitable Scheduled flights and Arianespace website.

Launch sequence

Launch complex with withdrawn mobile gantry

Typically, operations 3 days before launch include countdown rehearsal for all stages as well as final preparations and verification of the Fregat upper stage. Two days before launch preparations for fueling begin. This is also the last day when pre-launch activity with the payload can occur.[68] The launch sequence is optimized for each mission, the sequence described here is based on flight VS07 which lifted the Sentinel-1A satellite:[19][69]

Clock Event Altitude
T− 06:30:00 Mission control team B on a console, beginning of a network countdown
T− 04:50:00 State Commission meeting giving fueling authorization
T− 04:00:00 Beginning of fueling
T− 03:00:00 Payload switched to pre-launch mode
T− 02:20:00 Readiness report
T− 01:45:00 End of fueling
T− 01:21:00 GO / NO-GO roll-call
T− 01:00:00 Mobile gantry withdrawal
T− 00:10:00 Payload switches to onboard power supply
T− 00:06:10 Beginning of autosequence
T− 00:05:00 Fregat switches to onboard power supply
T− 00:01:00 Activation of automatic launch sequence
T− 00:00:40 Launcher switches to onboard power supply
T− 00:00:20 Lower stage umbilical mast withdrawal
T− 00:00:17 Main engine ignition
T− 00:00:15 Preliminary thrust level
T− 00:00:03 Maximum thrust level
T+ 00:00:00 Liftoff
T+ 00:01:11 Max Q
T+ 00:01:58 Boosters separation 60 km (37 mi)
T+ 00:03:29 Fairing separation 120 km (75 mi)
T+ 00:04:47 2nd stage separation 240 km (150 mi)
T+ 00:04:48 2nd stage ignition
T+ 00:04:53 Aft section separation (connects 1st with 2nd stage)
T+ 00:08:46 Fregat upper stage separation
T+ 00:09:46 Fregat ignition 410 km (250 mi)
T+ 00:20:04 Fregat shutdown
T+ 00:23:29 Payload separation 693 km (431 mi)

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 "Soyuz from the Guiana Space Centre – User's manual". Arianespace. March 2012. http://www.arianespace.com/wp-content/uploads/2015/09/Soyuz-Users-Manual-March-2012.pdf. 
  2. 2.0 2.1 "A Historic Launch For Arianespace: First Soyuz Mission From Guiana Space Center A Success; First Two Galileo Satellites In Orbit" (Press release). Arianespace. 21 October 2011. Retrieved 17 December 2015.
  3. "Arianespace takes official delivery from ESA of the Soyuz launch complex at the Guiana Space Center" (Press release). Arianespace. 7 May 2011. Archived from the original on 7 July 2011. Retrieved 24 August 2014.
  4. "Access to space today and tomorrow: what does Europe need?". Space Daily. 26 May 2003. http://www.spacedaily.com/reports/Access_to_space_today_and_tomorrow_what_does_Europe_need.html. 
  5. "Europe takes key decisions to ensure the long-term viability of its launcher sector". Arianespace. 5 February 2004. http://www.arianespace.com/news-feature-story/2004/2004_02_05_key_European_decisions.asp. 
  6. 6.0 6.1 "Soyuz launch site ready for first flight". ESA. 1 April 2011. http://www.esa.int/Our_Activities/Launchers/Soyuz_launch_site_ready_for_first_flight. 
  7. Stephen Clark (21 August 2014). "Europe's Galileo navigation system set for expansion". Spaceflight Now. http://spaceflightnow.com/soyuz/vs09/140821preview/. 
  8. "VS02 Launch kit". Arianespace. http://www.arianespace.com/wp-content/uploads/2015/10/VS02-launchkit-GB1.pdf. 
  9. "VS04 Launch kit". Arianespace. http://www.arianespace.com/wp-content/uploads/2015/10/VS04-launchkit-EN.pdf. 
  10. "VS17 Launch kit". Arianespace. http://www.arianespace.com/wp-content/uploads/2017/05/VS17-launchkit-EN2.pdf. 
  11. 11.0 11.1 "Arianespace's Soyuz order to cover market until 2019". Spaceflight Now. 7 April 2014. http://spaceflightnow.com/news/n1404/07soyuz/. 
  12. "Arianespace Annual report 2013". Arianespace. http://www.arianespace.com/about-us-corporate-information/Arianespace-Annual-Report-2013-EN.pdf. 
  13. Berger, Eric (2022-02-26). "Russia pulls out of European spaceport, abandoning a planned launch" (in en-us). https://arstechnica.com/science/2022/02/russia-pulls-out-of-european-spaceport-abandoning-a-planned-launch/. 
  14. 14.0 14.1 14.2 14.3 Zak, Anatoly (23 August 2015). "Soyuz-2 launch vehicle (14A14)". RussianSpaceWeb. http://russianspaceweb.com/soyuz2_lv.html#st. 
  15. Arianespace (10 July 2014). "[Soyuz Processing Highlights of Soyuz VS-08 Mission with O3b Satellites"]. https://www.youtube.com/watch?v=wgh_hGJFr0Y. 
  16. "Soyuz launch site; Preparation area". Arianespace. http://www.arianespace.com/spaceport-soyuz/prep-area.asp. 
  17. "Soyuz is in the launch zone for its August 21 mission to loft the first two Galileo FOC satellites". Arianespace. 18 August 2014. http://www.arianespace.com/mission-update/soyuz-is-in-the-launch-zone-for-its-august-21-mission-to-loft-the-first-two-galileo-foc-satellites/. 
  18. "Inspecting the Soyuz facilities". ESA. 24 September 2014. http://blogs.esa.int/gaia/2013/09/24/356/. 
  19. 19.0 19.1 Daniel Scuka (3 April 2014). "Sentinel-1A launch timeline". ESA. http://blogs.esa.int/eolaunches/2014/04/03/sentinel-1a-launch-timeline/. 
  20. Israël, Stéphane (19 March 2014). "One-on-one with the chief executive of Arianespace" (Interview). Interviewed by Stephen Clark. Spaceflight Now. Retrieved 25 August 2014.
  21. Jonathan Amos (5 July 2014). "Ariane 6: Customers call the shots". BBC News. https://www.bbc.co.uk/news/science-environment-28166626. 
  22. Parsonson, Andrew (29 October 2020). "ESA requests 230 million euros more for Ariane 6 as maiden flights slips to 2022". SpaceNews. https://spacenews.com/esa-request-230-million-euros-more-for-ariane-6-as-maiden-flights-slips-to-2022/. 
  23. "Galileo IOV launch services contract signed". ESA. 16 June 2009. http://www.esa.int/Our_Activities/Navigation/Galileo_IOV_launch_services_contract_signed. 
  24. "Galileo program implementation begins". Thales Group. 19 January 2006. https://www.thalesgroup.com/en/content/galileo-program-implementation-begins. 
  25. "Shipment of first two Soyuz to French Guiana readies Arianespace for the growth of its launch vehicle family". Arianespace. 7 November 2009. http://www.arianespace.com/news-soyuz-vega/2009/2009_11_07.asp. 
  26. "First Soyuz almost ready for launch from French Guiana". ESA. 4 May 2011. http://www.esa.int/Our_Activities/Launchers/First_Soyuz_almost_ready_for_launch_from_French_Guiana. 
  27. "ESA hands over keys to Soyuz launch site". ESA. 7 May 2011. http://www.esa.int/Our_Activities/Launchers/ESA_hands_over_keys_to_Soyuz_launch_site. 
  28. "Countdown to Europe's first Soyuz launch under way". ESA. 20 September 2011. http://www.esa.int/Our_Activities/Launchers/Countdown_to_Europe_s_first_Soyuz_launch_under_way. 
  29. "A new countdown for Soyuz first flight from the Spaceport". Arianespace. 20 October 2011. http://www.arianespace.com/news-mission-update/2011/858.asp. 
  30. "Soyuz rocket prepares for first launch from French Guiana". The Guardian. 19 October 2011. https://www.theguardian.com/science/2011/oct/19/soyuz-first-launch-french-guiana. 
  31. 31.0 31.1 "First two operational satellites in the Galileo constellation (Galileo FOC M1, SAT 5–6), the European Union's flagship program, successfully launched by Arianespace (VS 09 – Soyuz)" (Press release). 22 August 2014. Retrieved 16 December 2015.
  32. "Galileo satellites experience orbital injection anomaly on Soyuz launch: Initial report" (Press release). 23 August 2014. Retrieved 16 December 2015.
  33. "Team of teams". ESA. 8 September 2014. http://www.esa.int/spaceinimages/Images/2014/09/Team_of_teams. 
  34. "Update on Galileo launch injection anomaly". 26 August 2014. http://www.esa.int/Our_Activities/Navigation/The_future_-_Galileo/Launching_Galileo/Update_on_Galileo_launch_injection_anomaly. 
  35. "VS09 flight: Arianespace names independent inquiry commission" (Press release). 25 August 2014. Retrieved 16 December 2015.
  36. Anatoly Zak; George Chambers (30 August 2014). "Galileo network: Complex failure scenario emerges". RussianSpaceWeb. http://www.russianspaceweb.com/galileo.html#0828. 
  37. "Frozen Propellant Line found to be Cause of Galileo Launch Failure". Spaceflight101. 26 September 2014. http://www.spaceflight101.com/soyuz-vs09-launch-updates.html. 
  38. Иван Чеберко (19 September 2014). "В падении "Союз-СТ-Б" обвинили конструкторов НПО имени Лавочкина" (in RU). Izvestia. http://izvestia.ru/news/576912. 
  39. "Soyuz Flight VS09: Independent Inquiry Board announces definitive conclusions concerning the Fregat upper stage anomaly" (Press release). Evry: Arianespace. 8 October 2014. Retrieved 16 December 2015.
  40. "Galileo satellite set for new orbit". SpaceRef. 10 November 2014. http://www.spaceref.com/news/viewpr.html?pid=44399. 
  41. "Sixth Galileo satellite reaches corrected orbit". ESA. 13 March 2015. http://www.esa.int/Our_Activities/Navigation/The_future_-_Galileo/Launching_Galileo/Sixth_Galileo_satellite_reaches_corrected_orbit. 
  42. "Arianespace VSO2 mission: Soyuz STA orbits Pleiades 1A, ELISA and SSOT" (Press release). 17 December 2011. Retrieved 16 December 2015.
  43. "Arianespace flight VS03: Soyuz ST-B orbits two Galileo IOV-2 satellites" (Press release). 12 October 2012. Retrieved 16 December 2015.
  44. "Arianespace's fourth Soyuz mission a success: Pléiades 1B in orbit" (Press release). 1 December 2012. Retrieved 16 December 2015.
  45. "Arianespace launch VS05 > Soyuz ST-B – O3b: Mission accomplished!" (Press release). 25 June 2013. Retrieved 16 December 2015.
  46. "Arianespace successfully launches the Gaia scientific satellite" (Press release). 19 December 2013. Retrieved 16 December 2015.
  47. "Arianespace boosts Sentinel-1A Earth observation satellite into orbit" (Press release). 3 April 2014. Retrieved 16 December 2015.
  48. "Arianespace launches O3b satellites on Soyuz mission" (Press release). 10 July 2014. Retrieved 16 December 2015.
  49. "VS09 Soyuz launch: Galileo satellites orbital injection anomaly" (Press release). Arianespace. 22 August 2014. Retrieved 16 December 2015.
  50. "Arianespace launch a success, orbiting four more satellites in the O3b constellation" (Press release). 18 December 2014. Retrieved 16 December 2015.
  51. "Arianespace expands Europe's Galileo global navigation satellite system with its latest Soyuz success" (Press release). 27 March 2015. Retrieved 16 December 2015.
  52. "Arianespace successfully launches two satellites in the Galileo constellation" (Press release). Arianespace. 27 March 2015. Retrieved 16 December 2015.
  53. "Arianespace's Latest Galileo Mission A Success: Soyuz Launcher Orbits Two More Satellites In The Constellation" (Press release). 17 December 2015. Retrieved 17 December 2015.
  54. "Flight VS14 – A successful Arianespace launch with Soyuz, supporting sustainable development, fundamental physics and promoting space careers" (Press release). Arianespace. 25 April 2016.
  55. "Sentinel-1". European Space Agency. https://earth.esa.int/web/guest/missions/esa-operational-eo-missions/sentinel-1. 
  56. "Arianespace orbits two more Galileo satellites" (Press release). Arianespace. 24 May 2016.
  57. "The 40th SES satellite orbited by Arianespace is lofted on its latest Soyuz mission success". Arianespace. http://www.arianespace.com/mission-update/the-40th-ses-satellite-orbited-by-arianespace-is-lofted-on-its-latest-soyuz-mission-success/. 
  58. "Mission Description". Arianespace. http://www.arianespace.com/mission/soyuz-vs18/. 
  59. "Mission Description". Arianespace. http://www.arianespace.com/mission/soyuz-vs19/. 
  60. Krebs, Gunter. "METOP A, B, C". Gunter's Space Page. http://space.skyrocket.de/doc_sdat/metop.htm. 
  61. "Soyuz Flight VS20 - Arianespace". Arianespace. http://www.arianespace.com/mission/ariane-flight-vs20/. 
  62. "Soyuz Flight VS21". Arianespace. http://www.arianespace.com/mission/ariane-flight-vs21/. 
  63. Clark, Stephen (7 April 2017). "Italian radar satellite, European exoplanet telescope to launch on Soyuz next year". Spaceflight Now. https://spaceflightnow.com/2017/04/07/italian-radar-satellite-european-planet-hunter-booked-on-soyuz-launch-next-year/. 
  64. "Live coverage: Soyuz launches Falcon Eye 2 satellite on third attempt". Spaceflight Now. 1 December 2020. https://spaceflightnow.com/2020/11/30/soyuz-vs24-mission-status-center/. 
  65. "Arianespace, with Russian Soyuz, launches CSO-2 French military satellite". NASASpaceflight. 29 December 2020. https://www.nasaspaceflight.com/2020/12/arianespace-cso-2-french-satellite/. 
  66. Zak, Anatoly (4 December 2021). "Soyuz delivers a pair of Galileo satellites". RussianSpaceWeb. https://www.russianspaceweb.com/galileo13.html. 
  67. "Arianespace's thirteenth flight for OneWeb successfully deployed 34 additional satellites". Arianespace (Press release). 10 February 2022. Retrieved 11 February 2022.
  68. "Soyuz Launch operations". Arianespace. http://www.arianespace.com/launch-services-soyuz/Launch-Operations.asp. 
  69. Stephen Clark (4 April 2014). "Mission Status Center – Soyuz Launch Report". Spaceflight Now. http://spaceflightnow.com/soyuz/vs07/status.html.