Engineering:List of LVM3 launches
This article lists all the previous and planned launches by ISRO using LVM3 rockets. As of December 2025, there have been 9 launches of LVM3, with all of them being successful.

Notable missions
Flight X

The maiden flight of the LVM3 lifted off from the Second Launch Pad at the Satish Dhawan Space Center on 18 December 2014 at 04:00 UTC.[1] The test had functional boosters, a core stage but carried dummy upper stage whose LOX and LH₂ tanks were filled with LN₂ and GN₂ respectively for simulating weight. It also carried the Crew Module Atmospheric Re-entry Experiment (CARE) that was tested on re-entry.[2]
Just over five minutes into the flight, the rocket ejected CARE at an altitude of 126 kilometres (78 mi), which then descended, controlled by its onboard reaction control system. During the test, CARE's heat shield experienced a peak temperature of around 1,000 °C (1,830 °F). ISRO downlinked launch telemetry during the ballistic coasting phase until the radio black-out to avoid data loss in the event of a failure. At an altitude of around 15 kilometres (9.3 mi), the module's apex cover separated and the parachutes were deployed. CARE splashed down in the Bay of Bengal near the Andaman and Nicobar Islands and was recovered successfully.[3][4][5][6]
Chandrayaan
Following the failure of Phobos-Grunt mission of Roscosmos, it resulted in a complete review of technical aspects connected with the spacecraft, which were also slotted to be used in the proposed Russian lander for Chandrayaan-2. This delayed the lander from Russia and eventually Roscosmos declared its inability to meet up with the revised time of 2015 for its launch on board an uprated GSLV rocket along with an Indian orbiter and rover. ISRO cancelled the Russian agreement and decided to go alone with its project with marginal changes.[7][8]
On 22 July 2019, the LVM3 M1 (GSLV Mk.III M1) rocket lifted off with 3850 kg Chandrayaan-2 Orbiter-Lander composite and successfully injected it into a parking orbit of 169.7 x 45,475 km. This marked the first operational flight of LVM3 after two developmental flights.[9] The apogee of the earth parking orbit is about 6,000 km more than originally envisaged and thereby eliminated one of the seven earth-bound orbit raising manoeuvres. It was attributed to a 15 percentage increase in rocket performance.[10][11] On 14 July 2023, the LVM3 M4 rocket successfully injected the 3900 kg Chandrayaan-3 composite to a parking orbit of 170 x 36,500 km.[12] On 15 November 2023, the Cryogenic Upper Stage (C25) of the LVM3 M4 (NORAD ID: 57321) made an uncontrolled re-entry into the Earth's atmosphere around 9:12 UTC. The impact point is predicted over the North Pacific Ocean and the final ground track did not pass over India.[13][14][15]
OneWeb

On 21 March 2022, OneWeb announced that it had signed a launch agreement with United States launch provider SpaceX to launch the remaining 1st generation satellites on Falcon 9 rockets, with the first launch expected no earlier than summer 2022.[16][17] On 20 April 2022 OneWeb announced a similar deal with NewSpace India Limited, the commercial arm of the Indian Space Research Organisation.[18] OneWeb satellites were deployed by LVM3 both on 22 October 2022 and 26 March 2023[19] using a lightly modified version of the satellite dispenser previously used on Soyuz.[20][21]

The first batch of 36 OneWeb Gen-1 satellites weighing a total of 5796 kg was launched onboard LVM3 M2 rocket codenamed OneWeb India-1 Mission on 22 October 2022 and the satellites were injected to a low earth orbit of 601 km altitude and 87.4° inclination on a sequential basis. This constituted the first commercial mission and the first multi-satellite mission to low earth orbit of the rocket, marking its entry to global commercial launch service market. The separation of satellites involved a unique maneuver of the cryogenic stage to undergo several re-orientation and velocity additions covering 9 phases spanning 75 minutes.[22][23]
On 26 March 2023, codenamed OneWeb India-2 Mission, the second batch of 36 satellites was launched onboard LVM3 M3 and injected to an altitude of 450 km with same inclination. The launch featured a white cryogenic stage which takes into account environmental-friendly manufacturing processes, better insulation properties and the use of lightweight materials.[24][25]
Statistics
<section begin=Statistics/> LVM3 has accumulated a total of 9 launches, as of 24 December 2025[update]. Of these, all 9 have been successful, giving it a cumulative success rate of 100%. Script error: No such module "Chart".
- Decade-wise summary of LVM3 launches
| Decade | Successful | Partial success | Failure | Total |
|---|---|---|---|---|
| 2010s | 4 | 0 | 0 | 4[26] |
| 2020s | 5 | 0 | 0 | 5 |
| Total | 9 | 0 | 0 | 9 |
<section end=Statistics/>
Launch history
2014–2019 | ||||
| Date/Time (UTC) |
Payload | Launch site | Regime | Status |
|---|---|---|---|---|
| Flight Number | Operator | Function | ||
| Remarks | ||||
| 18 December 2014 4:00 |
3,775 kg (8,322 lb) |
Satish Dhawan - SLP | Sub-orbital | Success |
| LVM3-X | ISRO | Sub-orbital test of Re-entry Module | ||
| Sub-orbital developmental test flight with a non-functional cryogenic stage. The CARE module separated from the launch vehicle at an intended altitude of 126 km at a speed of 5.3 km/s. The launch validated the ignition, performance and separation aspects of S200 and L110 stages.[27][28][29] | ||||
| 5 June 2017 11:58 |
3,136 kg (6,914 lb) |
Satish Dhawan - SLP | GTO | Success |
| LVM3-D1 | INSAT | Communication | ||
| First developmental test launch with an operational cryogenic engine. The satellite was successfully injected to a parking orbit of 170 x 35,975 km with 21.5° inclination. The launch featured an ogive fairing and slanted nose cones on S200 stages to improve aerodynamic performance.[30][31][32] | ||||
| 14 November 2018 11:38 |
3,423 kg (7,546 lb) |
Satish Dhawan - SLP | GTO | Success |
| LVM3-D2 | INSAT | Communication | ||
| Second developmental test flight in full operational configuration. The satellite was successfully injected to an elongated parking orbit of 190 x 35,975 km with 21.5° inclination. L110 core used upgraded High Thrust Vikas Engines (HTVE). Developmental test flights of the rocket has completed.[33][34][35] | ||||
| 22 July 2019 09:13 |
3,850 kg (8,490 lb) |
Satish Dhawan - SLP | EPO | Success |
| LVM3-M1 | ISRO | Lunar Composite | ||
| First operational launch of the rocket and successfully injected a lunar Orbiter-Lander-Rover composite spacecraft to a parking orbit of 169.7 x 45,475 km. Chairman stated a 15 percentage increment in vehicle performance which eliminated one of the scheduled seven earth-bound orbit raising burns.[11][36][37] | ||||
2020–2029 | ||||
| Date/Time (UTC) |
Payload (& Mass) | Launch site | Regime | Status |
| Flight Number | Operator | Function | ||
| Remarks | ||||
| 22 October 2022 18:37 |
5,796 kg (12,778 lb) |
Satish Dhawan - SLP | LEO | Success |
| LVM3-M2 | OneWeb | Broadband Internet | ||
| First commercial launch of the rocket under NSIL and its first multi-satellite mission to low earth orbit of 601 km. The cryogenic stage performed multiple reorientation and velocity addition maneuvers to sequentially dispose the satellites. The rocket made its entry to global commercial launch service market.[22][38][23] | ||||
| 26 March 2023 03:30 |
5,805 kg (12,798 lb) |
Satish Dhawan - SLP | LEO | Success |
| LVM3-M3 | OneWeb | Broadband Internet | ||
| Second batch of 36 OneWeb Gen-1 satellites launched successfully to low earth orbit of 450 km with 87.4° inclination. The launch featured a white cryogenic stage (C25) which has more environmental-friendly manufacturing processes, better insulation properties and the use of lightweight materials.[25][24][39] | ||||
| 14 July 2023 09:05 |
3,895 kg (8,587 lb) |
Satish Dhawan - SLP | EPO | Success |
| LVM3-M4 | ISRO | Lunar Composite | ||
| The rocket successfully injected a lunar composite spacecraft of Propulsion Module-Lander-Rover into an elliptical parking orbit of 170 x 36,500 km. On 15 November, the Cryogenic Upper Stage of the rocket made an uncontrolled re-entry around 9:12 UTC over the North Pacific Ocean.[40][41][42] | ||||
| 2 November 2025 11:56 |
4,400 kg (9,700 lb) |
Satish Dhawan - SLP | GTO | Success |
| LVM3-M5 | INSAT | Communication | ||
| With a mass of 4.4 tonnes, GSAT-7R is the heaviest geostationary satellite to be launched on LVM3 by ISRO. After Separation of GSAT-7R, LVM3's CE-20 upper stage engine reignited for the second burn for the first time. Replacement satellite for GSAT-7.[43] | ||||
| 24 December 2025 03:25 |
6,100 kg (13,400 lb) |
Satish Dhawan - SLP | LEO | Success |
| LVM3-M6 | AST SpaceMobile | Communication | ||
| Commercial launch under NSIL.[44] Cellphone-compatible broadband constellation. The next-generation BlueBird Block 2 satellite delivers 10x the bandwidth of BlueBird Block 1 satellites, allowing continuous cellular broadband service coverage. It will feature a ~2,400 sq ft (220 m2) communications array, the largest ever developed commercially.[45] Following launch, the payload fairing washed up off the coast of Sampur, Trincomalee In Sri Lanka.[46] | ||||
Future launches
| Date/Time (UTC) |
Payload | Launch site | Regime | Status |
|---|---|---|---|---|
| Flight Number | Operator | Function | ||
| Remarks | ||||
| Q2 2026 | Satish Dhawan - SLP | GTO | Planned | |
| INSAT | Communication | |||
| [43] | ||||
| NET 2027 | Satish Dhawan- SLP | GTO | Planned | |
| INSAT | Communication | |||
| [43] | ||||
| NET 2027 | Satish Dhawan- SLP | GTO | Planned | |
| INSAT | Communication | |||
| [43] | ||||
| NET 2027 | Chandrayaan-4 Lander Module Chandrayaan-4 Ascender Module |
Satish Dhawan - SLP | GTO | Planned |
| LVM3 SC | ISRO | Lunar Composite | ||
| [47][48][49] | ||||
| NET 2027 | Chandrayaan-4 Re-entry Module |
Satish Dhawan - SLP | GTO | Planned |
| LVM3 SC | ISRO | Lunar Composite | ||
| [47][48][49] | ||||
| 29 March 2028 | Satish Dhawan - SLP | GTO | Planned | |
| ISRO | ||||
| [50][51][52] | ||||
| NET 2030[53][54] | Satish Dhawan - SLP | GTO | Planned | |
| ISRO | ||||
| [55][56][57] | ||||
| NET 2028 | 9,186 kg (20,252 lb) |
Satish Dhawan - SLP | LEO | Scheduled |
| ISRO | Space Station | |||
| First module launch of Bharatiya Antariksh Station.[58] | ||||
| 2028-30 | NVS-07 (IRNSS-1P) NVS-08 (IRNSS-1Q) NVS-09 (IRNSS-1R) |
Satish Dhawan - SLP | Planned | |
| ISRO | ||||
| [59][60][61] | ||||
| NET 2030 | Satish Dhawan - SLP | LEO | Scheduled | |
| ISRO | Space Station | |||
| Second module launch of Bharatiya Antariksh Station. | ||||
| NET 2031-32 | Satish Dhawan - SLP | Selenocentric | Planned | |
| ISRO | ||||
| First of Two launches carrying 3 satellites for Lunar Navcom Data Relay and Navigation satellite.[64][65] | ||||
| NET 2031-32 | Satish Dhawan - SLP | Selenocentric | Planned | |
| ISRO | ||||
| Second of Two launches carrying 3 satellites for Lunar Navcom Data Relay and Navigation satellite.[66][67] | ||||
| NET 2032 | Satish Dhawan - SLP | LEO | Scheduled | |
| ISRO | Space Station | |||
| Fifth module launch of Bharatiya Antariksh Station. | ||||
| NET 2033 | Satish Dhawan - SLP | LEO | Scheduled | |
| ISRO | Space Station | |||
| Third module launch of Bharatiya Antariksh Station. | ||||
| NET 2034 | Satish Dhawan - SLP | LEO | Scheduled | |
| ISRO | Space Station | |||
| Fourth module launch of Bharatiya Antariksh Station. | ||||
Human-rated missions
| Date/Time (UTC) |
Payload | Launch site | Regime | Status |
|---|---|---|---|---|
| Flight Number | Operator | Function | ||
| Remarks | ||||
| Orbital Test Flights | ||||
| January 2026[71] | LP2 - SDSC SHAR | LEO | Integration and testing | |
| HLVM3 | ISRO | Test flight | ||
| The seventh operational flight of the LVM3 rocket and the first test flight of the Gaganyaan capsule . The spacecraft will be launched into an orbit of 170×408 km, perform a circularization burn, and test re-entry and recovery sequences in ocean waters .The spacecraft will carry the Humanoid robot Vyommitra, accompanied by scientific payloads including fruit flies to simulate the effects of radiation exposure and microgravity on the human body. During the flight various experiments will be carried out for future crewed missions. Currently the capsule is in the final stages of integration and validation and the launch is expected in late early 2026.[73] | ||||
| NET 2026[74] | LP2 - SDSC SHAR | LEO | Planned | |
| HLVM3 | ISRO | Test flight | ||
| Second orbital test flight of Gaganyaan spacecraft.[73] | ||||
| NET 2026[74] | LP2 - SDSC SHAR | LEO | Planned | |
| HLVM3 | ISRO | Test flight | ||
| Third orbital test flight of Gaganyaan spacecraft.[75] | ||||
| Crewed Flights | ||||
| Q1 2027[74] | LP2 - SDSC SHAR | LEO | Planned | |
| HLVM3 | ISRO | Crewed mission | ||
| First crewed flight of Gaganyaan spacecraft, carrying one to three Indian astronauts on a short orbital test flight.[76][77] Launch mass is 7,800 kg (17,200 lb) with service module, capsule's mass is 3,735 kg (8,234 lb).[78][79] | ||||
| TBA | LP2 - SDSC SHAR | LEO | Scheduled | |
| HLVM3 | ISRO | |||
| Second crewed flight of Gaganyaan spacecraft, carrying one to three Indian astronauts on a short orbital test flight.[58] Launch mass is 7,800 kg (17,200 lb) with service module, capsule's mass is 3,735 kg (8,234 lb).[78][79] | ||||
| Cargo Flights | ||||
| TBA | LP2 - SDSC SHAR | LEO (ISS) | Scheduled | |
| HLVM3 | ISRO | Resupply Spacecraft | ||
| ISRO’s first ISS cargo resupply mission.[58] | ||||
| TBA | LP2 - SDSC SHAR | LEO (BAS) | Scheduled | |
| HLVM3 | ISRO | Resupply Spacecraft | ||
| ISRO’s first BAS cargo resupply mission.[58] | ||||
Gallery
<section begin=Gallery/>
<section end=Gallery/>
See also
- List of GSLV launches
- List of PSLV launches
- List of SSLV launches
References
- ↑ "India launches largest rocket and unmanned capsule". 8 December 2014. https://www.bbc.com/news/world-asia-india-30527602.
- ↑ "ISRO inches closer to manned mission". The Times of India. 10 January 2014. https://timesofindia.indiatimes.com/india/Isro-inches-closer-to-manned-mission/articleshow/28609291.cms. "We will be checking the crew capsule for all parameters."
- ↑ "ISRO's unmanned crew module reaches Chennai". Wayback Machine. 21 December 2014. http://www.thehindu.com/sci-tech/science/isros-unmanned-crew-module-reaches-chennai/article6713050.ece.
- ↑ As it happened: Isro's launch of India's heaviest rocket Times of India 18 December 2014
- ↑ Sangeetha Kandavel (18 December 2014). "GSLV Mark III takes to the skies in test flight". The Hindu. http://www.thehindu.com/sci-tech/science/india-successfully-test-fires-gslv-markiii-its-heaviest-rocket/article6703691.ece?homepage=true.
- ↑ "Isro to test GSLV Mk-III, crew module on December 18". The Times of India. 10 December 2014. https://timesofindia.indiatimes.com/home/science/Isro-to-test-GSLV-Mk-III-crew-module-on-December-18/articleshow/45444522.cms.
- ↑ "Chandrayaan-2: India to go it alone" (in en-IN). The Hindu. 2013-01-21. ISSN 0971-751X. https://www.thehindu.com/news/national/chandrayaan2-india-to-go-it-alone/article4329844.ece.
- ↑ "Chandrayaan-2". https://pib.gov.in/newsite/PrintRelease.aspx?relid=98239.
- ↑ "Chandrayaan-2". https://www.isro.gov.in/Chandrayaan2_science.html.
- ↑ Prasad, R. (2019-07-25). "Chandrayaan-2: GSLV Mark III-M1 vehicle reduces number of orbit-raising exercises, saves fuel" (in en-IN). The Hindu. ISSN 0971-751X. https://www.thehindu.com/sci-tech/science/chandrayaan-2-gslv-mark-iii-m1-vehicle-reduces-number-of-orbit-raising-exercises-saves-fuel/article28707851.ece.
- ↑ 11.0 11.1 "Chandrayaan-2: Off to the moon" (in en). 2019-07-23. https://indianexpress.com/article/india/chandrayaan-2-isro-sriharikota-gslv-mkiii-pragyan-off-to-the-moon-south-pole-landing-5843243/.
- ↑ Howell, Elizabeth (2023-07-10). "Chandrayaan-3: A complete guide to India's third mission to the moon" (in en-US). https://www.space.com/chandrayaan-3-indian-moon-mission-rover.
- ↑ "Technical details for satellite GSLV R/B". https://www.n2yo.com//satellite/?s=57321.
- ↑ "Cryogenic upper stage of Chandrayaan-3's launch vehicle makes uncontrolled re-entry into the Earth's atmosphere" (in en-IN). The Hindu. 2023-11-15. ISSN 0971-751X. https://www.thehindu.com/sci-tech/science/part-of-chandrayaan-3-launch-vehicle-makes-uncontrolled-re-entry-into-earths-atmosphere-isro/article67537794.ece.
- ↑ "Cryogenic upper stage LVM-3 that launched Chandrayaan-3 makes re-entry". The Times of India. 2023-11-17. ISSN 0971-8257. https://timesofindia.indiatimes.com/india/cryo-upper-stage-lvm-3-that-launched-chandrayaan-3-makes-re-entry/articleshow/105250654.cms.
- ↑ "OneWeb agrees satellite programme with SpaceX" (in en). 21 March 2022. https://oneweb.net/resources/oneweb-resume-satellite-launches-through-agreement-spacex.
- ↑ Michael Sheetz [@thesheetztweetz]. "On the sidelines of #SATShow, OneWeb senior advisor Ruth Pritchard-Kelly tells press that the "soonest" the first launch with SpaceX can happen "would be this summer." "But we don't know yet" a more specific timeframe.". https://twitter.com/thesheetztweetz/status/1505918153666220036. Missing or empty |date= (help)
- ↑ "OneWeb agrees satellite launch programme with New Space India" (in en). 20 April 2022. https://oneweb.net/resources/oneweb-agrees-satellite-launch-programme-new-space-india.
- ↑ "Successful launch of 36 OneWeb Satellites with ISRO/NSIL marks key milestone to enable global connectivity". OneWeb. 27 March 2023. https://oneweb.net/resources/successful-launch-36-oneweb-satellites-isronsil-marks-key-milestone-enable-global.
- ↑ Graham, William (2022-10-22). "OneWeb resumes launches with first commercial GSLV Mk.III" (in en-US). https://www.nasaspaceflight.com/2022/10/oneweb-gslv-mk-iii/.
- ↑ U, Tejonmayam (23 October 2022). "Isro's heaviest rocket successfully places 36 OneWeb satellites into orbits" (in en). https://timesofindia.indiatimes.com/india/isros-heaviest-rocket-successfully-places-36-oneweb-satellites-into-orbits/articleshow/95039625.cms.
- ↑ 22.0 22.1 "LVM3 M2 / OneWeb India-1 Mission". https://www.isro.gov.in/LVM3M2MissionLandingPage.html#.
- ↑ 23.0 23.1 "36-oneweb-satellites-successfully-launched-isro-nsil-sriharikota". 23 October 2022. https://oneweb.net/resources/36-oneweb-satellites-successfully-launched-isro-nsil-sriharikota.
- ↑ 24.0 24.1 "LVM3-M3 / OneWeb India-2 Mission". https://www.isro.gov.in/LVM3M3MissionLandingPage.html.
- ↑ 25.0 25.1 "ISRO's C25 cryogenic stage now sports white, ditches black; What's the science behind it?". https://www.wionews.com/india-news/isros-c25-cryogenic-stage-now-sports-white-ditches-black-whats-the-science-behind-it-575318/amp.
- ↑ "GSLV MkIII-D2 successfully launches GSAT-29". ISRO. https://www.isro.gov.in/update/14-nov-2018/gslv-mkiii-d2-successfully-launches-gsat-29.
- ↑ "Crew module Atmospheric Re-entry Experiment (CARE)". https://www.isro.gov.in/CARE.html.
- ↑ "LVM-3/CARE Mission". https://www.isro.gov.in/mission_GSLVMkIIILVM3.html.
- ↑ "The Space Review: India's heavy-lift rocket and crew module milestones: which is more important?". https://www.thespacereview.com/article/2667/1.
- ↑ "GSAT-19". https://www.isro.gov.in/GSAT_19.html.
- ↑ "GSAT-19 – GSLV Mk.III D1 | Spaceflight101" (in en-US). https://spaceflight101.com/gslv-mk3-d1/gsat-19/.
- ↑ "India launches GSAT-19 from its new, heaviest rocket". The Economic Times. 2017-06-05. ISSN 0013-0389. https://economictimes.indiatimes.com/news/science/india-launches-gsat-19-from-its-new-heaviest-rocket/articleshow/59002009.cms.
- ↑ The Hindu Net Desk (2018-11-15). "All you need to know about GSLV Mk III - D2/GSAT-29 Mission" (in en-IN). The Hindu. ISSN 0971-751X. https://www.thehindu.com/sci-tech/science/all-you-need-to-know-about-gslv-mk-iii-d2gsat-29-mission/article25505029.ece.
- ↑ "GSLV Mk III-D2 / GSAT-29 Mission". https://www.isro.gov.in/mission_GSLVMkIIID2.html.
- ↑ "Successful Qualification of High Thrust Vikas Engine - ISRO". 2019-07-09. https://www.isro.gov.in/update/15-jul-2018/successful-qualification-of-high-thrust-vikas-engine.
- ↑ "GSLV-Mk III - M1 / Chandrayaan-2 Mission". https://www.isro.gov.in/mission_GSLVMkIIIM1.html.
- ↑ "GSLV MkIII-M1 Successfully Launches Chandrayaan-2 spacecraft". https://www.isro.gov.in/Press%20Release5.html.
- ↑ Kabir, Radifah (2022-10-23). "OneWeb India-1 Mission: ISRO's Heaviest Rocket Successfully Launches 36 Satellites Into Orbit" (in en). https://news.abplive.com/science/oneweb-india-1-mission-isro-s-heaviest-rocket-successfully-launches-36-satellites-into-orbit-all-about-it-1559517.
- ↑ "Successful-launch-36-oneweb-satellites-isronsil-marks-key-milestone-enable-global". 27 March 2023. http://oneweb.net/resources/successful-launch-36-oneweb-satellites-isronsil-marks-key-milestone-enable-global.
- ↑ "Chandrayaan-3". https://www.isro.gov.in/Chandrayaan3.html.
- ↑ Linganna, Girish (2023-11-17). "Uncharted Re-entry: Chandrayaan-3's rocket LVM3 M4's Cryogenic Stage's Uncontrolled Re-entry" (in en). https://frontierindia.com/uncharted-re-entry-chandrayaan-3s-rocket-lvm3-m4s-cryogenic-stages-uncontrolled-re-entry/.
- ↑ "Chandrayaan-3: India's historic Moon mission lifts off successfully" (in en-GB). 2023-07-13. https://www.bbc.com/news/world-asia-india-66185565.
- ↑ 43.0 43.1 43.2 43.3 "Annual report 2020-2021". https://www.isro.gov.in/sites/default/files/anual_report_2020-2021_english.pdf.
- ↑ "Integrated Launch Manifesto for 2023-24 (Q4) & 2024-25". NSIL. 2024-02-08. https://www.inspace.gov.in/sys_attachment.do?sys_id=19a5f4ec8798461082e163d70cbb3571.
- ↑ Rainbow, Jason (2024-11-15). "AST SpaceMobile leans on Blue Origin to ramp up satellite launches" (in en-US). https://spacenews.com/ast-spacemobile-leans-on-blue-origin-to-ramp-up-satellite-launches/.
- ↑ "Debris from India's LVM3 rocket launch found on Sri Lanka's beach. See pics" (in en). 2025-12-30. https://www.indiatoday.in/science/story/debris-from-indias-lvm3-rocket-launch-found-on-sri-lankas-beach-see-pics-2843814-2025-12-30.
- ↑ 47.0 47.1 "Chandrayaan-4: India's next moon mission which will be launched in 2 phases". The Times of India. ISSN 0971-8257. https://timesofindia.indiatimes.com/etimes/trending/chandrayaan-4-to-be-launched-in-2-phases-in-2028/articleshow/108328326.cms.
- ↑ 48.0 48.1 "Chandrayaan-4 will be launched in two phases, both LVM-3, PSLV to be used" (in en). 6 March 2024. https://www.indiatoday.in/science/story/chandrayaan-4-will-be-launched-in-two-phases-both-lvm-3-pslv-to-be-used-2511197-2024-03-06.
- ↑ 49.0 49.1 "Chandrayaan-4 mission in 'process of developing', says ISRO chairman". The Economic Times. 2024-04-10. ISSN 0013-0389. https://economictimes.indiatimes.com/news/science/chandrayaan-4-mission-in-process-of-developing-says-isro-chairman/articleshow/109169775.cms.
- ↑ "All about Sukrayaan 1: ISRO's mission to Venus" (in en). 2023-09-29. https://www.hindustantimes.com/science/all-about-sukrayaan-1-isros-mission-to-venus-101695981482229.html.
- ↑ ""Venus mission already configured...": ISRO chairman Somanath". The Times of India. 2023-09-27. ISSN 0971-8257. https://timesofindia.indiatimes.com/india/venus-mission-already-configured-isro-chairman-somanath/articleshow/103980065.cms.
- ↑ "ISRO SYNERGISES NATIONAL EFFORTS TO STUDY PLANET VENUS". https://www.isro.gov.in/PLANETVENUS.html.
- ↑ "ISRO To Launch Mangalyaan-2 Mission In 2030" (in en). 2025-11-06. https://news.abplive.com/science/isro-to-launch-mangalyaan-2-in-2030-1810090.
- ↑ "ISRO confirms Mangalyaan-2 Mission: India to attempt first Mars landing in 2030" (in en). 2025-11-06. https://www.indiatvnews.com/science/isro-confirms-mangalyaan-2-mission-india-to-attempt-first-mars-landing-in-2030-2025-11-06-1016099.
- ↑ "Mangalyaan-2: ISRO working on the second mission to Mars nine years after MOM's success" (in en). 2023-10-02. https://www.businesstoday.in/latest/trends/story/mangalyaan-2-isro-working-on-the-second-mission-to-mars-nine-years-after-moms-success-400360-2023-10-02.
- ↑ "Mangalyaan-2 Mission: ISRO to deploy 4 powerful payloads" (in en). 2023-10-21. https://tech.hindustantimes.com/photos/mangalyaan2-mission-isro-to-deploy-4-powerful-payloads-71697901153602.html.
- ↑ "India once again sets sights on Mars, readies to launch Mangalyaan-2" (in en-us). 2023-10-02. https://www.wionews.com/science/india-once-again-sets-sight-on-mars-readies-to-launch-mangalyaan-2-641709.
- ↑ 58.0 58.1 58.2 58.3 58.4 58.5 58.6 58.7 "Moon Monday #183 and Indian Space Progress #17: The one where Chandrayaan and Gaganyaan converge" (in en). 2024-07-08. https://jatan.space/moon-monday-issue-183/.
- ↑ "All about Sukrayaan 1: ISRO's mission to Venus" (in en). 2023-09-29. https://www.hindustantimes.com/science/all-about-sukrayaan-1-isros-mission-to-venus-101695981482229.html.
- ↑ ""Venus mission already configured...": ISRO chairman Somanath". The Times of India. 2023-09-27. ISSN 0971-8257. https://timesofindia.indiatimes.com/india/venus-mission-already-configured-isro-chairman-somanath/articleshow/103980065.cms.
- ↑ "ISRO SYNERGISES NATIONAL EFFORTS TO STUDY PLANET VENUS". https://www.isro.gov.in/PLANETVENUS.html.
- ↑ 62.0 62.1 62.2 62.3 "Indian Launch Manifest". Steven Pietrobon's Space Archive. https://www.sworld.com.au/steven/space/india-man.txt.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1320.
- ↑ "Recently, we got a detailed look at ISRO's roadmap for India's Human Moon Landing Programme! 🇮🇳🌖 It involves a series of uncrewed Chandrayaan landings between 2027-2037 + the establishment of a communication relay network around Moon, before the first crewed Lunar missions starting in 2038-39, with the first Indians setting foot on the Moon in 2040! 👣 Check out our graphic below to learn about each of the milestones on this roadmap and their tentative timelines 👇". X (formerly Twitter). https://x.com/ISROSpaceflight/status/1954150232402354248?t=zsRS2R4GPPfLvATwaRJPeA&s=19.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1340.
- ↑ "Recently, we got a detailed look at ISRO's roadmap for India's Human Moon Landing Programme! 🇮🇳🌖 It involves a series of uncrewed Chandrayaan landings between 2027-2037 + the establishment of a communication relay network around Moon, before the first crewed Lunar missions starting in 2038-39, with the first Indians setting foot on the Moon in 2040! 👣 Check out our graphic below to learn about each of the milestones on this roadmap and their tentative timelines 👇". X (formerly Twitter). https://x.com/ISROSpaceflight/status/1954150232402354248?t=zsRS2R4GPPfLvATwaRJPeA&s=19.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1340.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1320.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1320.
- ↑ "Indian Space Launch Plan". Novosti Kosmonavtiki. https://forum.novosti-kosmonavtiki.ru/index.php?topic=9564.1320.
- ↑ "ISRO now aiming to launch Gaganyaan G1 mission in Jan 2026" (in en-US). 2025-11-11. https://www.news9live.com/science/isro-now-aiming-to-launch-gaganyaan-g1-mission-in-jan-2026-2903478.
- ↑ 72.0 72.1 72.2 72.3 "Space Assigned Numbers Authority (SANA)". https://sanaregistry.org/r/spacecraft/records/1495.
- ↑ 73.0 73.1 "Gaganyaan's First Test Abort Flight in May; Space Mission 'High Priority Activity', Lok Sabha Told" (in en). 2023-03-16. https://www.news18.com/india/gaganyaans-first-test-abort-flight-in-may-space-mission-high-priority-activity-lok-sabha-told-7303555.html.
- ↑ 74.0 74.1 74.2 "India's first space station unit is just 4 years ahead: ISRO chief S Somanath". https://www.onmanorama.com/news/kerala/2024/02/28/space-station-unit-bharatiya-anatariksha-s-somanath-isro-satellite.html.
- ↑ "Prime Minister reviews readiness of Gaganyaan Mission" (in en). http://pib.gov.in/PressReleseDetail.aspx?PRID=1968368.
- ↑ "Gaganyaan: ISRO to Launch First Full-Scale Unmanned Mission in February Next Year". 23 April 2023. https://www.newindianexpress.com/cities/chennai/2023/apr/22/gaganyaan-isro-to-launch-first-full-scale-unmanned-mission-in-february-next-year-2568391.html.
- ↑ "India Launches Chandrayaan-2 Moon Mission". 22 July 2019. https://www.nytimes.com/2019/07/22/world/asia/chandrayaan-india-moon-launch.html.
- ↑ 78.0 78.1 Indian Manned Spacecraft. Astronautix. 2014.
- ↑ 79.0 79.1 "Episode 90 – An update on ISRO's activities with S Somanath and R Umamaheshwaran". AstrotalkUK. October 24, 2019. https://astrotalkuk.org/episode-90-an-update-on-isros-activities-with-s-somanath-and-r-umamaheshwaran/.
Template:Indian Department of Space